Attachment 01_SOW_Comm Server Room.pdf

PDF 156 KB Posted

Attached to
Communications Server Room Renovation
Solicitation number
W50S8R-24-B-0001
Issued by

About this file

This document is a Statement of Work (SOW) for a construction project to expand an existing computer server room and replace the HVAC system at the Mansfield Lahm ANG Base in Ohio.

The key details are: The contractor shall construct approximately 39 linear feet of new wall to expand the existing server room, modify the ceiling and raised flooring, install new doorways, remove the existing HVAC system and replace it with two new CRAC units, add new electrical circuits and panels, modify the fire sprinkler system, install leak detection, and perform other work to make the expanded server room fully functional. The existing server room must remain operational throughout construction. There is no government-furnished property for this project. The contractor is responsible for verifying all dimensions and existing conditions. A 1-year warranty is required, and all waste/debris must be properly disposed. The magnitude of the project is between $500,000 - $1,000,000. The solicitation is a small business set-aside with a NAICS code of 236220. The bid opening is scheduled for May 16, 2024.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Project PBXP202107

REPAIR COMM SERVER ROOM HVAC

MANSFIELD LAHM ANG BASE

MANSFIELD, OHIO

Table of Contents 1

General Requirements 2-4

Project Description 4-5

1. GENERAL REQUIREMENTS

1.1 The contractor shall furnish all labor, material and appurtenances to perform work in accordance with the drawings and specifications for expanding the existing computer Server (Frame) Room, replacing a computer room air conditioning (CRAC) unit, and replacing two (2) air cooled condensing units and associated DX cooling coils and refrigerant lines in Building 164, Squadron Operations/Communications Facility, including:

A. Constructing approximately 39 linear feet of new metal stud/gyp board wall to expand the existing Server (Frame) Room.

B. Modifying the existing suspended ceiling and raised access flooring systems in the existing and expanded Server (Frame) Room areas.

C. Cutting openings into an existing metal stud/gyp wall and installing two (2) new doorways to access the expanded Frame Room.

D. Removing the existing single Glycol CRAC system and replacing it with one (1) new dual DX/Glycol Economizer Coils CRAC system, and one (1) DX CRAC system, and associated dry cooler/pump system and condensing unit.

E. Adding a new breaker and feeder circuit to the existing Switchboard EMSB in the South Mech Room to feed the new CRAC units in the Server (Frame) Room.

F. Replacing an existing 3-pole, 208V breaker in existing panel RP1D, feeding the existing CRAC unit, with three (3) new single-pole breakers and running three (3) new branch circuits into the expanded Server (Frame) Room.

G. Modifying the pre-action sprinkler system in the Server (Frame) Room by replacing a single, obstructed sprinkler head with two (2) new sprinkler heads.

H. The work includes the development of a proposal acceptable for delegated design of the electrical to support the new servers.

I. Install leak detection equipment under raised floor.

J. Performing all other work as required to make the new expanded Server

(Frame) Room completely useable and fully functional.

This work shall include all accessories, parts and equipment necessary to make a complete and usable facility including all damaged systems. Only U.S. manufactured equipment shall be installed for this project.

1.2 The location of the proposed work is within the POL area of the Mansfield Lahm ANG Base, Mansfield, Ohio.

1.3 The existing Computer Server (Frame) Room must remain completely operational throughout the duration of this project. The contractor shall coordinate closely with the ANG and provide all dust control, temporary utilities, and take all security-related measures necessary to prevent any extended outages of the Server (Frame) Room and associated computer systems.

1.4 The contractor shall not exceed the scope of work without prior approval from the Contracting Officer.

1.5 The contractor shall protect all government property from damage. Any damages incurred in pursuance of this project shall be replaced and/or restored to original condition.

1.6 The contractor shall maintain a clean and safe job site at all times to prevent damage to aircraft on concrete parking apron, other existing utilities, and surrounding facilities that may be affected; this is also intended to protect building occupants from potential health hazard associated with the proposed work. This shall include dust, debris, and waste created in performance of this project; along with tools, equipment, and vehicles located at the job site. The contractor shall comply with the provisions of the Occupational Safety and Health Act of 1972 and all provisions thereto.

1.7 The Contractor is responsible for properly laying out the work, and for lines and measurements for the work executed under the Contract Documents.

A. The Contractor, NOT the Government, is responsible to field verify all existing underground utilities within the excavation limits and/or as shown on the Drawings, before laying out the work. The Contractor is to report errors or inaccuracies in writing to the Contracting Officer's Representative before commencing work.

B. The Contracting Officer or his Representative will in no case assume the responsibility for any layout of the work or damages to existing underground utilities while performance of work is underway.

1.8 THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS. The dimensions provided by the government are only approximations and they are not responsible for their precision or accuracy. This includes but is not limited to blueprints, drawings, schedules, and statements of work.

1.9 The contractor shall provide a one-year warranty for the work contained herein.

They shall pass along extended guarantees for equipment and products.

1.10 All trash, waste, and construction debris generated from this project shall become property of the contractor and shall be removed from the base. The disposal of these materials shall follow the appropriate Federal and State laws. This includes the disposal or recycling of hazardous materials.

1.11 Bids for this project shall be valid for 90 days.

1.12 A site visit is required to bid on this project.

1.13 Point of Contact for this project is Lieutenant Colonel Kiet Chung at (419)-520- 6156 or Captain Clayton McCarthy at (419) 520-6158.

2. PROJECT DESCRIPTION

2.1 Scope: The contractor shall provide all labor, materials and equipment needed to expand the existing computer Server (Frame) Room, replace a computer room air conditioning (CRAC) unit, two (2) air cooled condensing units and associated DX cooling coils and refrigerant lines serving the Base Squadron Operations/Communications Facility, Building 164. Major work elements of the project are to:

A. Construct approximately 39 linear feet of new metal stud/gyp board wall to expand the existing Server (Frame) Room. The new wall system shall be installed from the concrete floor beneath the existing raised access floor, to above the existing suspended ceiling, to match the existing wall system as required to comply with security requirements.

B. Modify the existing suspended ceiling and raised access flooring systems in the existing and expanded Server (Frame) Room areas as required to match existing systems in the Server (Frame) Room and adjacent BNCC areas.

C. Cut two (2) openings on either end of the existing north Server (Frame) Room metal stud/gyp wall and install new doorways to access the expanded Frame Room from the existing Frame Room.

D. Remove the existing single R-22/Glycol CRAC system including the indoor unit and the outdoor dry cooler and pumping units and replace the existing CRAC system with two (2) new systems. The first new CRAC system shall be a dual cooling/economizer unit with R-410 DX and separate Glycol Economizer Coils and associated dry cooler and pumping units. The second new CRAC unit shall be an R-410A indoor DX CRAC unit, with associated outdoor condensing unit. Pour a new concrete pad adjacent to the existing equipment pad on the east wall of the Server (Frame) Room as needed to place the new CRAC condensing unit. Locate the new dry cooler/pumping units on the existing equipment pad serving the existing CRAC/Glycol system.

E. Add a new breaker and feeder circuit from the existing Switchboard EMSB in the South Mechanical Room to feed a new CRAC Panelboard in the new expanded Frame Room to feed the new CRAC systems in the Server (Frame) Room.

F. Replace the existing 3-pole, 208V breaker feeding the existing CRAC unit, in existing panel RP1D (located in the Radio Maintenance room adjacent to the existing Server Room), with three (3) new single-pole breakers. Run three (3) new 120v branch circuits with from RP1D into the expanded Server (Frame) Room to feed new isolated ground receptacles.

G. Modify the pre-action sprinkler system in the Server (Frame) Room by replacing a single, obstructed sprinkler head with two (2) new sprinkler heads.

H. Delegated design and install new circuits to support new servers.

I. Install leak detection system under raised floor as required by UFC 3-600-01.

J. Perform all other work as required to make the new expanded Server (Frame) Room completely useable and fully functional.

2.2 Special Considerations: The existing Computer Server (Frame) Room must remain completely operational throughout the duration of this project. The contractor shall coordinate closely with the ANG COR, Communications and Security personnel, and provide all dust control, temporary utilities, and take all security-related measures necessary to prevent any extended outages of the Server (Frame) Room and associated computer systems. The existing CRAC unit shall remain operational to provide cooling during the construction of the Frame Room expansion and installation of the first new CRAC system. The first new CRAC system shall be fully operational and capable of providing cooling to the new expanded Frame Room before removal of the existing CRAC unit can commence.

2.3 Government Furnished Property: There is NO Government furnished property provided for this project.

End Statement of Work