RFI 34 response.pdf
PDF 70 KB Posted
- Attached to
- ADD/ALTER B403 CC Federal contract opportunity
- Solicitation number
- W50S8R-21-B-0001
About this file
This document includes a request for information response and details of a federal contract opportunity for construction services. The response clarifies that drawings for a building renovation project do not show insulation on the interior side of exterior walls. The related federal contract opportunity is a solicitation to provide addition and alteration services at a corrosion control facility. The project scope includes interior and exterior demolition, new structures and site work, security and HVAC upgrades. The solicitation establishes bidding procedures and schedules for a pre-bid conference, bid opening, and 300-day performance period. The work is set aside for small businesses with a NAICS code of 236220 and value between $1-5 million. The solicitation and amendments will be posted online for electronic download only.
View the file
Other files for this federal contract opportunity
Show all 50
ADD/ALTER B403 CC has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION
R E
Q U
E S
T O
R S
E C
T
IO
N
From:
Date:
11/30/2020
To: Contracting Officer
1. Solicitation Number:
W50S8R-21-B-0001
2. Location of Project:
Building 403
3. Information Requested: (Include Specification Section and/or Drawing Number and Page if inquiring about a discrepancy)
Response to RFI #23 did not clarify R-value or thickness of rigid insulation of interior side of foundation walls shown on A-302 and A-303.
Attachments:
Date Response Required:
By:
Title:
Requestor's FAX Number:
Requestor's Telephone Number:
C E
R E
S P
O N
S E
To:
Date:
Response:
RFI #23 response states “There is no insulation on the interior side of the exterior walls shown”. The logical assertion means there would not be an R-value or thickness of rigid insulation to clarify, since there isn’t any (for interior side of exterior walls shown in referenced drawings).
This information is a clarification of the solicitation/contract and does not change the contract terms or conditions.
This information is a proposed change to the solicitation/contract. An amendment will be issued.
Contracting Officer: