RFI Answers.pdf
PDF 97 KB Posted
- Attached to
- BLDG 107 Epoxy Floors Federal contract opportunity
- Solicitation number
- W50S8Q-23-R-0004
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Drawing1 Bldg 107.pdf | ||
| Attachment 3 - Material Submittals - WAAR232002.xlsx | XLSX spreadsheet | |
| Attachment 5 - DBIDs -Base Entry Request.pdf | ||
| Attachment 1 - SOW Bldg.107 WAAR232002.docx | DOCX document | |
| Attachment 2 - Drawing2 Bldg 107.pdf | ||
| Attachment 4 - RFI Format.docx | DOCX document | |
| W50S8Q-23-R-0004.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W50S8Q‐23‐R‐0004, BLDG107 Epoxy Floors
RFI Questions:
1. Is this proposal to be emailed to the contacts shown on Page 6 of 69 of RFP?
Yes all proposals and bid bonds will need to be emailed to SSgt Taylor at seth.taylor.8@us.af.mil and MSgt Nu all at daniel.nu all.2@us.af.mil .
2. An expected proposal submission format is not shown on RFP. Can bidders assume it to be emailed, with completed SF1442, Sec on 00010 pricing sheet, bid bond, and Reps and certs?
All quotes can be on the company le er head or on the 1442. Please ensure all proposals come with a Bid bond.
3. Drawings direct that new transi ons will only be needed in areas that transi on from one to another floor type. For example, from the new epoxy floor to carpet or VCT le. Does a concrete floor type count. For example, will a new transi on be needed when going from the new epoxy floor to exis ng concrete floor?
No transi on will be needed when going from concrete to concrete.
4. The unlabeled room/doorway opposite overhead door # 7 is a chemical type designated room. It has an 18’’ (approximated) decal on floor designa ng/aler ng chemicals in use. The decal will come up with floor prep. Is the 18’’ decal to be replaced with something? If yes, with what will it be replaced.
Yes, it should be replaced with the same le ering or something similar. The decal should be under the final layer of epoxy.
5. Lines under epoxy shall be yellow.
6. 4. Are there any specs for the thresholds?
No specifica ons. Threshold should be approved by the COR during the submi al process. Must be durable to withstand shop use and made for the flooring at the transi on.
7. Is there a specific color epoxy required?
Must be a gray quartz and minimum of 2‐color design. Contractor will provide samples to be approved by COR. Reference 3.3.1 of SOW for more details.