Attachment 2 - Drawing2 Bldg 107.pdf

PDF 30 KB Posted

Attached to
BLDG 107 Epoxy Floors
Solicitation number
W50S8Q-23-R-0004
Issued by

View the file

Other files

File Type Posted
RFI Answers.pdf PDF
Attachment 1 - SOW Bldg.107 WAAR232002.docx DOCX document
Attachment 3 - Material Submittals - WAAR232002.xlsx XLSX spreadsheet
W50S8Q-23-R-0004.pdf PDF
Attachment 5 - DBIDs -Base Entry Request.pdf PDF
Attachment 4 - RFI Format.docx DOCX document
Attachment 2 - Drawing1 Bldg 107.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PH #1

PH#2 PH#3

Drawing #2 Notes:

1.)The CONTRACTOR shall remove all caution tape on floor. The tape was put down to show walkway areas and needs replaced with new epoxy painted lines. (Approx. LF 450+/-)

2.) The CONTRACTOR shall use Red Epoxy paint to put new walkway lines in where existing caution tape lines were before demo.

(Approx. LF 450+/-)

Legend:

The red line Represents existing caution tape that needs to be demolished and the new red epoxy lines that need painted.

File details come from the government source that posted it. Updated .