Attachment 2 - Drawing2 Bldg 107.pdf
PDF 30 KB Posted
- Attached to
- BLDG 107 Epoxy Floors Federal contract opportunity
- Solicitation number
- W50S8Q-23-R-0004
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI Answers.pdf | ||
| Attachment 1 - SOW Bldg.107 WAAR232002.docx | DOCX document | |
| Attachment 4 - RFI Format.docx | DOCX document | |
| Attachment 2 - Drawing1 Bldg 107.pdf | ||
| Attachment 3 - Material Submittals - WAAR232002.xlsx | XLSX spreadsheet | |
| Attachment 5 - DBIDs -Base Entry Request.pdf | ||
| W50S8Q-23-R-0004.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PH #1
PH#2 PH#3
Drawing #2 Notes:
1.)The CONTRACTOR shall remove all caution tape on floor. The tape was put down to show walkway areas and needs replaced with new epoxy painted lines. (Approx. LF 450+/-)
2.) The CONTRACTOR shall use Red Epoxy paint to put new walkway lines in where existing caution tape lines were before demo.
(Approx. LF 450+/-)
Legend:
The red line Represents existing caution tape that needs to be demolished and the new red epoxy lines that need painted.
File details come from the government source that posted it. Updated .