Attachment 3 - Material Submittals - WAAR232002.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
BLDG 107 Epoxy Floors
Solicitation number
W50S8Q-23-R-0004
Issued by

View the file

Other files

File Type Posted
RFI Answers.pdf PDF
W50S8Q-23-R-0004.pdf PDF
Attachment 1 - SOW Bldg.107 WAAR232002.docx DOCX document
Attachment 2 - Drawing2 Bldg 107.pdf PDF
Attachment 4 - RFI Format.docx DOCX document
Attachment 2 - Drawing1 Bldg 107.pdf PDF
Attachment 5 - DBIDs -Base Entry Request.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF 3000

SCHEDULE OF MATERIAL SUBMITTALS
( Form 66 Modified)SCHEDULE OF MATERIAL SUBMITTALS
(Form 66 Modified)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
WAAR232002Blg. 107 Epoxy Floor
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALCERTIFICATION OF COMPLIANCE AND CLOSEOUTSHOP DRAWINGSSAMPLESCOLOR SELECTIONMANUFACTURER'S RECOMMENDATIONSMANUFACTURER'S WARRANTYCATALOG DATAMSD SHEETOPERATING INSTRUCTIONS

SUBMITTAL

REQUIRED DATES DUE

BY__10__

DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGINEERING RETURN

SUSPENSION

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1Progress Schedule
2Progress Reports
3Stamped Design Documents
5Site Safety Plan
6Epoxy Resin
7Color sample of quartz granules
9Epoxy paint colors
11Cove Base and color chart
12Adhesive
13Crack Fill/Caulking Material
14Thresholds
15
16
17
18

File details come from the government source that posted it. Updated .