Abstract of Offers 24-B-0003.pdf

PDF 187 KB Posted

Attached to
Rickenbacker ANGB Pavement Repairs
Solicitation number
W50S8P-24-B-0003
Issued by

About this file

This document is an Abstract of Offers for a construction contract solicitation. The solicitation number is W50S8P-24-B-0003 for the project titled "Rickenbacker ANGB Pavement Repairs". The project involves repairing and striping the roadways around the front gate of the Rickenbacker Air National Guard Base, as well as additional striping near the flightline. The contract duration is 180 calendar days after the Notice to Proceed. The requirement is set aside for small businesses, with a North American Industry Classification System (NAICS) code of 237310 and a size standard of $45 million average annual revenue. The bid opening date is August 20, 2024. Three offers were received, from Professional Pavement Services, Chargin Charlie Construction, and John Cisel Construction Inc. The government estimate for the project was $189,824.64, and the lowest responsive bid was $196,942.50 from Chargin Charlie Construction.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

5. PROJECT TITLE

6. NUMBER OF AMENDMENTS ISSUED

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (Type)

SIGNATURE DATE SIGNED

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without Profit)

C. REASONABLE CONTRACT

(Including Profit)

9. OFFERS

NO. 1 NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

7A.

ITEM

NO.

USPFO OH 121 MISSION SUPPORT CONTRACTING

7370 MINUTEMAN WAY

COLUMBUS OH 43217-1161

NLZG242001 Front Gate Pavement Repair

Repair and Striping of Front Gate

Airfield Ramp Striping

Total

158,560.64

31,264.00

189,824.64

158,560.64

31,264.00

189,824.64

172,072.50

24,870.00

196,942.50

172,072.50

24,870.00

196,942.50

174,500.00

24,420.00

198,920.00

174,500.00

24,420.00

198,920.00

W50S8P-24-B-0003 1 2

James R. Andrews, Contracting Officer

Professional Pavement Services LL Chargin Charlie Construction

Nonresponsive Bond, 20%

No Yes

08/20/202407/19/2024

1249010800N Highlight

1249010800N Highlight

1249010800N Highlight

1249010800N Highlight

1249010800N Highlight

1249010800N Highlight

1249010800N Highlight

1249010800N Highlight

1249010800N Highlight

1249010800N Highlight

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

W50S8P-24-B-0003

NLZG242001 Front Gate Pavement Repair

Bond, 20% Bond 20%

Yes Yes

214,300.00214,300.00246,345.00246,345.00

8,800.008,800.0032,524.0032,524.00112

1 1 213,821.00 213,821.00 205,500.00 205,500.00

2 2

John Cisel Construction Inc Life Safety Group LLC

Total

2024-08-20T16:57:46-0400
ANDREWS.JAMES.REDDOC.1249010800

Date2_af_date: 8/20/24

File details come from the government source that posted it. Updated .