SOW_Attch 9.4 AF66_HAAW182012.pdf

PDF 71 KB Posted

Attached to
174 Fire Alarm Reporting System
Solicitation number
W50S8N26QA019
Issued by

About this file

Schedule of Material Submittals - AF Form 66 Modified

This is a Schedule of Material Submittals document for Project No. HAAW182012, titled "Repair Fire Alarms Reporting System." The form establishes the contractor's submission requirements and approval process for 24 distinct items organized across preconstruction, product data, test reports, certificates, manufacturers' instructions, warranties, operating instructions, administrative submittals, installation warranty, and as-built drawings categories.

Key submittal items required include: preliminary schedule, materials and equipment specifications, product safety data sheets, quality control and health/safety/accident prevention plans, waste management and FOD mitigation plans, installer and supervisor qualifications, commissioning agent qualifications, shop drawings and network topology diagrams, battery calculations, manufacturer's installation instructions, operations and maintenance data and manuals, test procedures and plans, training plan and certificates, preliminary and final signed tests, as-built drawings, and daily QCM reports. Multiple items require two copies of submission, including shop drawings, network topology diagrams, and battery calculations. Notable remarks indicate that O&M manuals must be provided before training, spare parts and specialty tools should be included in the maintenance plan, and training certificates from the manufacturer's authorized representative are required. The document tracks submission dates, civil engineering receipt dates, contractor notification dates, approval status, and contractor resubmittal requirements, with all preconstruction submittals due within 10 days after Notice to Proceed.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.

HAAW182012

APPROVED DISAPPROVED

1 Schedule, Preliminary e e x

2 Materials & Equipment e e e e e

Use AF3000 Coversheet with QCM statement of compliance in the Comment section; Current Industry listings or approvals include

3 Product Safety Data Sheets e e

4 Quality Control Plan e e x 5 Health/Safety/Accident Prevention Plan e

6 Waste Management Plan e

7 FOD Mitigation Plan e

8 Product Safety Data Sheets e e

9 Installer's Qualifications e e 10 Supervisor's Qualifications e e

11 Commissioning Agent/Third Party Reviewer's Qualifications e e

Shop Drawings, Network Topology Diagrams e 2

13 Battery Calculations e 2 This can be combined with the Shop Drawings

14 Manufacturer's Installation Instructions

15 O&M Data e e e

16 O&M Manuals e e Required before Training with As-Built toology

17 Test Proceedures/Test Plan e e Include any Manufacture Installation Guides

18 Training Plan e e e

19 Preliminary Test, signed e

20 Final Test, signed e

21 As-Built Drawings 2 e

22 Training Certificates or Letter from the Manufacturer authorized Training representative e e one copy for each Government Trainee;

electronic is acceptable

23 Maintenance Plan e e 2 Include Spare Parts, Specialty tools and Vendor list

24 Daily QCM Reports e e USACE or equivalent

SOLICITATION/CONTRACT NO.PROJECT TITLE

Currrent as of (CAO) Date: DD Mmm YYYY

Repair Fire Alarms Reporting System

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66 Modified)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY THE CONTRACTOR

AS

-B

U

IL

T D

R

AW

IN

G

S

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

LI

N

E N

U M

BE

R

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

AD

M

IN

IS

TR

AT

IV

E

SU

BM

IT

TA

LS

PR

O

D U

C T

D

AT

A

TE

ST

R

EP

O R

TS

C

ER

TI

FI

C

AT

ES

M

AN

U

FA

C

TU

R

ER

S

IN

ST

R

U C

TI

O

N S

IN

ST

AL

LA

TI

O

N W

AR

R

AN

TY

PR

EC

O N

ST

R

U C

TI

O

N

REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

RETURN

SUSPENSION

DATE

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL FOLLOW-UP

SUBMITTAL

REQUIRED

BY 10 DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

DATE CONTRACTOR NOTIFIED

File details come from the government source that posted it. Updated .