SOW_Attch 9.4 AF66_HAAW182012.pdf
PDF 71 KB Posted
- Attached to
- 174 Fire Alarm Reporting System
- Solicitation number
- W50S8N26QA019
- Issued by
-
Department of the Army National Guard
About this file
Schedule of Material Submittals - AF Form 66 Modified
This is a Schedule of Material Submittals document for Project No. HAAW182012, titled "Repair Fire Alarms Reporting System." The form establishes the contractor's submission requirements and approval process for 24 distinct items organized across preconstruction, product data, test reports, certificates, manufacturers' instructions, warranties, operating instructions, administrative submittals, installation warranty, and as-built drawings categories.
Key submittal items required include: preliminary schedule, materials and equipment specifications, product safety data sheets, quality control and health/safety/accident prevention plans, waste management and FOD mitigation plans, installer and supervisor qualifications, commissioning agent qualifications, shop drawings and network topology diagrams, battery calculations, manufacturer's installation instructions, operations and maintenance data and manuals, test procedures and plans, training plan and certificates, preliminary and final signed tests, as-built drawings, and daily QCM reports. Multiple items require two copies of submission, including shop drawings, network topology diagrams, and battery calculations. Notable remarks indicate that O&M manuals must be provided before training, spare parts and specialty tools should be included in the maintenance plan, and training certificates from the manufacturer's authorized representative are required. The document tracks submission dates, civil engineering receipt dates, contractor notification dates, approval status, and contractor resubmittal requirements, with all preconstruction submittals due within 10 days after Notice to Proceed.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO.
HAAW182012
APPROVED DISAPPROVED
1 Schedule, Preliminary e e x
2 Materials & Equipment e e e e e
Use AF3000 Coversheet with QCM statement of compliance in the Comment section; Current Industry listings or approvals include
3 Product Safety Data Sheets e e
4 Quality Control Plan e e x 5 Health/Safety/Accident Prevention Plan e
6 Waste Management Plan e
7 FOD Mitigation Plan e
8 Product Safety Data Sheets e e
9 Installer's Qualifications e e 10 Supervisor's Qualifications e e
11 Commissioning Agent/Third Party Reviewer's Qualifications e e
Shop Drawings, Network Topology Diagrams e 2
13 Battery Calculations e 2 This can be combined with the Shop Drawings
14 Manufacturer's Installation Instructions
15 O&M Data e e e
16 O&M Manuals e e Required before Training with As-Built toology
17 Test Proceedures/Test Plan e e Include any Manufacture Installation Guides
18 Training Plan e e e
19 Preliminary Test, signed e
20 Final Test, signed e
21 As-Built Drawings 2 e
22 Training Certificates or Letter from the Manufacturer authorized Training representative e e one copy for each Government Trainee;
electronic is acceptable
23 Maintenance Plan e e 2 Include Spare Parts, Specialty tools and Vendor list
24 Daily QCM Reports e e USACE or equivalent
SOLICITATION/CONTRACT NO.PROJECT TITLE
Currrent as of (CAO) Date: DD Mmm YYYY
Repair Fire Alarms Reporting System
SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66 Modified)
NO. OF COPIES REQUIRED
TO BE COMPLETED BY THE CONTRACTOR
AS
-B
U
IL
T D
R
AW
IN
G
S
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
LI
N
E N
U M
BE
R
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
AD
M
IN
IS
TR
AT
IV
E
SU
BM
IT
TA
LS
PR
O
D U
C T
D
AT
A
TE
ST
R
EP
O R
TS
C
ER
TI
FI
C
AT
ES
M
AN
U
FA
C
TU
R
ER
S
IN
ST
R
U C
TI
O
N S
IN
ST
AL
LA
TI
O
N W
AR
R
AN
TY
PR
EC
O N
ST
R
U C
TI
O
N
REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
RETURN
SUSPENSION
DATE
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL FOLLOW-UP
SUBMITTAL
REQUIRED
BY 10 DAYS
AFTER
NTP
DATE
RECEIVED
IN
CONTRACTING
DATE
TO
CIVIL
ENGINEERING
DATE CONTRACTOR NOTIFIED
File details come from the government source that posted it. Updated .