Solicitation Amendment W50S8J26QA0230002 SF 30.pdf
PDF 4 MB Posted
- Attached to
- Kubota Engine Replacement
- Solicitation number
- W50S8J26QA023
About this file
This is Standard Form 30 (SF 30), Amendment 0002 to Solicitation W50S8J26QA023, issued by the W50SJ Air Force Contracting Activity on September 17, 2026. The amendment is not extending the offer receipt deadline and modifies the evaluation criteria for an OEM engine replacement project.
The primary change revises the evaluation criteria in Section M to clarify submission requirements for the Technical and Past Performance evaluation factors. Offerors must submit a brief description (maximum one page) of a single completed project demonstrating similar scope, magnitude, and complexity. For the Past Performance factor, offerors must provide a current, verified Point of Contact with name, title, phone number, and email address for the referenced project; the Government will contact this POC to gather performance information. A significant addition permits prime contractors to submit relevant experience and past performance information of their authorized Kubota subcontractor in lieu of or alongside their own company information, with the Government able to request a signed letter of commitment from the proposed subcontractor. The amendment emphasizes that complete submissions, including verifiable POCs, are strongly encouraged to avoid negative evaluation impacts. The contracting officer is Nicholas Bastiani.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment - W50S8J26QA0230001.pdf | ||
| Solicitation - W50S8J26QA023.pdf | ||
| wage determination 8-12.txt | TXT text file | |
| PWS_Kubota_Engine_Replacement.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Evaluation Factors for Award
Miscellaneous text in this section has been modified from:
Quotes will be evaluated in accordance with RFO FAR 12.203. Evaluation factors are as follows:
Price, Technical, and Past Performance. The Government reserves the right to evaluate quotes and make an award based on initial submissions without further exchanges. However, the Government also reserves the right to request additional or missing information if the Contracting Officer determines it to be in the Government's best interest.
Evaluation Factor: Technical
Definition: Demonstrated experience performing a project of similar scope, magnitude, and complexity to the work project required to complete this project.
Required Submission: A brief description (maximum of one page) of a single completed project that clearly demonstrates the required experience.
Evaluation Factor: Past Performance
Definition: An assessment of how well the offeror executed and completed the project submitted under the Technical factor.
Required Submission: A current, verified Point of Contact (POC)--including name, title, phone number, and email address--for the project submitted under the Technical factor. The Government will contact this POC to gather past performance information.
W50S8J26QA0230002
Note: The Past Performance evaluation is directly tied to the project submitted for the Technical evaluation. While the Government may request missing information, offerors are strongly encouraged to provide a complete submission, including a verifiable POC, to avoid negatively impacting their evaluation.
To:
Quotes will be evaluated in accordance with RFO FAR 12.203. Evaluation factors are as follows:
Price, Technical, and Past Performance. The Government reserves the right to evaluate quotes and make an award based on initial submissions without further exchanges. However, the Government also reserves the right to request additional or missing information if the Contracting Officer determines it to be in the Government's best interest.
Evaluation Factor: Technical
Definition: Demonstrated experience performing a project of similar scope, magnitude, and complexity to the work project required to complete this project.
Required Submission: A brief description (maximum of one page) of a single completed project that clearly demonstrates the required experience.
Evaluation Factor: Past Performance
Definition: An assessment of how well the offeror executed and completed the project submitted under the Technical factor.
Required Submission: A current, verified Point of Contact (POC)--including name, title, phone number, and email address--for the project submitted under the Technical factor. The Government will contact this POC to gather past performance information.
- Given the **NOTE ON SUBCONTRACTOR EXPERIENCE AND PAST PERFORMANCE** specialized nature of this OEM Engine replacement, prime contractors submitting a quote in response to this opportunity may include relevant experience and past performance of the authorized Kubota subcontractor they intend to utilize for this project, in lieu of or alongside their own company's experience/past performance information. If subcontractor experience/ past performance is utilized, the Government may request as signed letter of commitment from the proposed subcontractor demonstrating that entity's commitment to support performance.
Note: The Past Performance evaluation is directly tied to the project submitted for the Technical evaluation. While the Government may request missing information, offerors are strongly encouraged to provide a complete submission, including a verifiable POC, to avoid negatively impacting their evaluation.
| IDCode: J |
| Page: 1 |
| Pages: 4 |
| AmendNo: 0002 |
| EffDate: 17 SEP 2026 |
| ReqNo: |
| ProjNo: |
| IssCode: W50S8J |
| AdmCode: |
| IssuedBy: W7NR USPFO ACTIVITY NYANG 109 |
KO FOR NYANG DO NOT DELETE, 1 AIR NATIONAL GUARD RD
SCOTIA, NY 12302-9572
UNITED STATES
JASON STARK, EMAIL: JASON.STARK.1@US.AF.MIL TELEPHONE: 5183442514
AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: W50S8J26QA023 |
| SolDate: 31 AUG 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: SEE SECTION G - CONTRACT ADMINISTRATION DATA |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: The purpose of this amendment is to make the following changes: |
1) To revise the evaluation criteria in Section M in order to allow submission of proposed subcontractor experience/ past performance information. See summary of changes for complete details.
| ContNameTitle: |
| CoNameTitle: NICHOLAS BASTIANI |
| ContDate: |
| CODate: 17 SEP 2026 |
File details come from the government source that posted it. Updated .