Questions and Answers for Solicitation W50S8J20R0011 (2).pdf

PDF 150 KB Posted

Attached to
Relocation and Renovation of Recruiting Office
Solicitation number
W50S8J-20-R-0011
Issued by

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers (2) for Solicitation W50S8J-20-R-0011 Building 1 Recruiting Area Project

Q: There are no details on the proposed lighting layout after the partitions are installed. How many lights are being removed / relocated?

A: Lighting will remain but may require small adjustments to not be located over a partition wall.

Q: The existing power is shown, there is no indication of what has to be removed or how many connection points there needs to be on the modular partitions.

A: modular office needs to be tied into current electrical system. Current electrical layout included in SOW

Q: There are no data raceway requirements shown for the modular partitions, is there any?

A: Yes, there needs to be raceways for comm and electric

Q: Is the soffit being removed as well as the track or only the track assembly?

A: Yes up to concrete support structure

Q: For the door that is being removed, does the infill have insulation?

A: No

Q: What is the new ceiling height or will it remain the same? The detail on the spec states that new ceiling grid will conform to new office layout. The modular partitions are a little less than 8’0 tall.

A: Ceiling height will be ~8’ to match up to modular unit

Q: Are we to install the ceiling angle around the perimeter of the room only or are we to install ceiling angle to the modular units?

A: perimeter only

Q: Please see these 2 options for the modular partitions. Please let me know what specific information you need to compare between these and Skutchi.

https://www.teknion.com/products/galleries/boulevard-gallery https://www.tayco.com/wp-content/uploads/2017/10/Cosmo_0315.pdf

A: We are not asking for modular partitions, we need modular offices. The companies noted may be able to provide an alternative but they need to meet the following (of note - the walls will need to be full glass panels that extend all the way to the ceiling):

ii. Modular wall construction

1. See attached sketch #1 & #2 provide by Skutchi Designs of the office area and dimensions

a. Submittal of design will be required from this company or approved equal meeting these requirements:

i. 6” electric and cable channel on the base of each panel

ii. Panel thickness: 3 ¼”

iii. Frames and connections: aluminum

iv. Doors for cubicles are 84” or higher

v. Meets ANSI/ BIFMA https://www.teknion.com/products/galleries/boulevard-gallery https://www.tayco.com/wp-content/uploads/2017/10/Cosmo_0315.pdf

vi. Electric: UL Listed

2. Electrical and Communication ports will be made available and installed in the 6” panel provided by manufacture

a. See design from Skutchi Design; labeled picture #5

i. Room height is 8’-0”

ii. Full glass panels required

File details come from the government source that posted it. Updated .