Attachment 4 - Schedule of Submittals.pdf

PDF 100 KB Posted

Attached to
BUILDING 1047 BOILER REPLACEMENT 2026
Solicitation number
W50S8G26BA001
Issued by

About this file

This is an AF Form 66, Schedule of Material Submittals, for a federal construction project. The document outlines submittal requirements and tracking procedures for the Building 1047 Boiler Replacement 2026 project, identified under Project Number MHMV262100 and Solicitation/Contract Number W50S8G26BA001.

The form specifies eleven material submittals required from the contractor, with most items requiring three copies to be submitted prior to work commencement. Required submittals include: Project Schedule, Work certifications for boiler installation, Boilers, Expansion Tank, Air Separator, Gas Meter, Valves and Gauges, Test and Balance Report, Manufacturer start-up report, and Operations & Maintenance manuals with Warranties. The only exception is Redline field drawings, which requires one copy at the end of work. The form provides columns for tracking submission dates, receipt in contracting, transfer to civil engineering, return suspense dates, follow-up actions, contractor notifications, resubmissions, and final approval status with approved/disapproved designations and remarks sections. This document serves as a project management tool to ensure timely receipt and processing of all required contractor documentation throughout the boiler replacement project execution.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF Fm 66

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER

MHMV262100

PROJECT TITLE

Building 1047 Boiler Replacement 2026

SOLICITATION/CONTRACT

NUMBER

W50S8G26BA001

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTING

L i n e N u m b e r

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

NO. OF

COPIES

REQUIRED

REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTING

DATE TO

CIVIL

ENGINEERING

RETURN

SUSPENSE

DATE

FOLLOW-UP

DATE

CONTRACTOR

NOTIFIED

CONTRACTOR

RESUBMITTED

FINAL

APPROVAL

REMARKS

APPROVED DISAPPROVED

1 Project Schedule 3 Prior to work

2 Work certifications for Install of Boilers

Prior to

3 Boilers 3 Prior to

4 Expansion Tank 3 Prior to

5 Air Separator 3 Prior to

6 Gas Meter 3 Prior to

7 Valves and Gauges 3 Prior to

8 Test and Balance Report 3 Prior to

9 Manufacturer start up report

3 Prior to

10 O&M’s & Warranties 3 Prior to

11 Redline field drawings 1 End of

DATE
DISAPPROVED

File details come from the government source that posted it. Updated .