Attachment 4 - Schedule of Submittals.pdf
PDF 100 KB Posted
- Attached to
- BUILDING 1047 BOILER REPLACEMENT 2026
- Solicitation number
- W50S8G26BA001
- Issued by
-
Department of the Army National Guard
About this file
This is an AF Form 66, Schedule of Material Submittals, for a federal construction project. The document outlines submittal requirements and tracking procedures for the Building 1047 Boiler Replacement 2026 project, identified under Project Number MHMV262100 and Solicitation/Contract Number W50S8G26BA001.
The form specifies eleven material submittals required from the contractor, with most items requiring three copies to be submitted prior to work commencement. Required submittals include: Project Schedule, Work certifications for boiler installation, Boilers, Expansion Tank, Air Separator, Gas Meter, Valves and Gauges, Test and Balance Report, Manufacturer start-up report, and Operations & Maintenance manuals with Warranties. The only exception is Redline field drawings, which requires one copy at the end of work. The form provides columns for tracking submission dates, receipt in contracting, transfer to civil engineering, return suspense dates, follow-up actions, contractor notifications, resubmissions, and final approval status with approved/disapproved designations and remarks sections. This document serves as a project management tool to ensure timely receipt and processing of all required contractor documentation throughout the boiler replacement project execution.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF Fm 66
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
MHMV262100
PROJECT TITLE
Building 1047 Boiler Replacement 2026
SOLICITATION/CONTRACT
NUMBER
W50S8G26BA001
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACTING
L i n e N u m b e r
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
NO. OF
COPIES
REQUIRED
REQUIRED
SUBMISSION
DATE
DATE
RECEIVED IN
CONTRACTING
DATE TO
CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW-UP
DATE
CONTRACTOR
NOTIFIED
CONTRACTOR
RESUBMITTED
FINAL
APPROVAL
REMARKS
APPROVED DISAPPROVED
1 Project Schedule 3 Prior to work
2 Work certifications for Install of Boilers
Prior to
3 Boilers 3 Prior to
4 Expansion Tank 3 Prior to
5 Air Separator 3 Prior to
6 Gas Meter 3 Prior to
7 Valves and Gauges 3 Prior to
8 Test and Balance Report 3 Prior to
9 Manufacturer start up report
3 Prior to
10 O&M’s & Warranties 3 Prior to
11 Redline field drawings 1 End of