Amendment 0003.pdf
PDF 371 KB Posted
- Attached to
- Repair of the Fire Suppression in Hangar 395
- Solicitation number
- W50S8E20B0003
About this file
This document provides an amendment to a solicitation and request for information related to a contract for repair of fire suppression systems at a New York Air National Guard facility. The amendment extends the response date to September 2nd, 2020 at 3:00 PM and includes two questions and answers about surge protection devices and wire installation requirements. The solicitation is for repair of fire suppression systems in Hangar 395 at Westhampton Beach, NY and has a performance period of 120 days. The requirement is set aside solely for small businesses with a NAICS code of 238220 and size standard of $16.5 million. The acquisition will be conducted according to FAR part 52.219-14 and has an estimated value between $100,000 and $250,000.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F9E7CE39134A005
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
A. This Amendment 3 is issued to add Request For Information 1-2.
B. Bid due date is extended.
C. All FAR provisions and clauses remain unchanged and in full force.
D. As all amendments, this amendment must be acknow ledged - See Block 11 above.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W50S8E20B0003
X 9B. DATED (SEE ITEM 11)
18-Jun-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Aug-2020
CODE
USPFO NY 106 MISSION SUPPORT CONTRACTING
FRANCIS S GABRESKI ARPT BLDG 250
WESTHAMPTON BEACH NY 11978-1201
W50S8E 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S8E20B0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
REQUEST FOR INFORMATION 1-2
Q1- Section 2.1.7 states to Install Sure Protection Devices to protect all F/A and Releasing panels. The (6) Potter releasing panels already have Surge Protection devices installed. Only the (2) Monaco fire alarm panels did not have Surge Protection devices. Should we price only the 2 new Surge Protection devices for the Monaco fire alarm panels?
A1- If the Surge Protection Devices for the (6) Potter releasing panels are sufficient and working properly, only the 2 new Surge Protection Devices for Monaco are required.
Q2- Section 2.1.5.5 states to install new wire “as required”. Reading further into Section 2.1.5.5, it also states to pull all conductors splice free. Most of the foam and fire alarm devices utilize shared conduit back to the panels. To pull new wire, splice free, would entail pulling all new wire back to the panels. This would most likely require pulling out all of the existing wire and re-pulling it back in the conduit when the new wire for the foam stop devices are pulled. Doing such adds a considerable amount of scope to the work. Is it acceptable to only install new wire where we are installing new conduit for the devices? This would entail splicing the existing wire w/ new wire for the new foam stops, and any relocation of existing fire alarm devices that is required. In the event that we are required to install new wire all the way back to the panels, we would need the as-built/floor plan asap to price in all of the wire/footages.
A2- As long as NFPA/NEC/other applicable codes are met, it is acceptable to only install new wire where installing new conduit for the devices.
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 27-Aug-2020 03:00 PM to 02-Sep-2020 03:00 PM.
(End of Summary of Changes)