Construct Stormwater Runoff Diversion Federal contract opportunity
Solicitation number
W50S8D22Q0009
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Construct Stormwater Runoff Diversion, newest first.
File Type Posted
RFI 1.pdf PDF
Solicitation Amendment W50S8D22Q0009_0001.pdf PDF
Pre-Proposal Conference Attendance Sheet.pdf PDF
Pre-Proposal Conference Minutes.pdf PDF
W50S8D22Q0009.pdf PDF
Attachment 1.2.pdf PDF
Attachment 1.1.pdf PDF
Statement of Work.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

105th AIRLIFT WING (ANG)

ONE MAGUIRE WAY

NEWBURGH NY 12550-5075

Revised 24 June 2022

1. Background

The water currently being stored within the Industrial Waste (IW) lagoon comes from winter deicing processes, aircraft hangar maintenance and aircraft washes mainly, all through a closed drainage system. It was recently encountered that clean runoff from approximately 35 2” PVC schedule 40 hangar door drains are discharging to the IW drainage system. The runoff is not classified as Industrial Waste and therefore must be diverted to the storm drainage system.

2. Scope

Contractor shall furnish all tools, testing, parts, material, labor, supplies, permits, testing, equipment and incidentals required to properly perform work outlined below.

All work shall be performed in in a safe manner and shall be accomplished in accordance with all local, state, federal, and safety regulations to include any hazardous waste disposal.

3. Objectives

The contractor shall create a closed drainage system which ties each door drain into a single header located within the floor drain. The header system shall be a 3” minimum (approx. 350

LF) and be securely fastened to the inside wall of the floor drain and pitched to drain toward the west wall of the hangar. The header shall drain to a sump pit installed by the contractor. The sump pit shall have a sump pump capable of pumping the runoff to a nearby 4” roof drain. The sump pit must be minimum 30 gallons and have a cover, with a minimum H-20 load rating that shall be installed to eliminate any tripping hazards. Electrical consideration/installation for the sump pump shall be performed by a qualified electrician. The sump pump may be powered from the nearby electrical panel located along the west wall of the hangar. The contractor shall install a pressure pipe (1” dia.) from the sump pump to the 4 inch roof drain (see Attachment 1) and tie into the roof drain. This will require a wall penetration and no doors, outlets, existing utilities or work stations shall be blocked by the routing of this pipe.

Throughout the period of performance the work area shall remain clean and free of debris. The contractor shall ensure no debris (concrete debris) enters the existing floor drain. The contractor is responsible for removal and disposal of all construction debris.

4. Delivery

The period of performance shall be 30 days. Performance shall take place at the 105th Airlift

Wing, Stewart ANGB, Newburgh, NY.

5. Government Furnished Property: None

6. Security

Contractors should be aware that this is a Military Installation and that all access to this installation is granted by the 105 AW Base Defense Squadron. The U.S. government will not be held liable for any delays or breach of contract caused by refusal of the 105th AW Base

Defense Squadron. If a gate pass is not granted to a contractor allowing the delivery of goods, execution of warranty support, or performance of services please contact the contracting officer.

A contractor’s badge will be issued once the contractor enters the main gate at Stewart Air

National Guard Base. All employees are required to have the proper ID (social security card, driver’s license, state ID, immigration card, U.S. Passport, etc.). If they do not have the proper

ID, they will be turned away. Vendors should be aware that Anti- Terrorism Force Protection

Measures are applicable to this contract. Vendors will be briefed on these measures by Base

Defense personnel if recurring or long term access is required to Stewart ANG Base. Otherwise you will be escorted at all times by a member of Stewart ANG Base.

7. Safety Requirements

The contractor shall comply with all Occupational Safety and Health Act (OSHA), federal, state, and local laws, regulations, and requirements regarding safety, as applicable to the services provided under this contract. In the event safety laws or regulations change during the term of this contract, the contractor is required to comply as such laws come into effect.