RFI 1.pdf
PDF 106 KB Posted
- Attached to
- Construct Stormwater Runoff Diversion Federal contract opportunity
- Solicitation number
- W50S8D22Q0009
- Issued by
- Department of the Army National Guard
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Pre-Proposal Conference Minutes.pdf | ||
| Statement of Work - Revised 24 June 2022.pdf | ||
| Solicitation Amendment W50S8D22Q0009_0001.pdf | ||
| Pre-Proposal Conference Attendance Sheet.pdf | ||
| Attachment 1.2.pdf | ||
| W50S8D22Q0009.pdf | ||
| Statement of Work.pdf | ||
| Attachment 1.1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1) Do you have a spec on the sump pump and fastener on the header bracing?
‐ The sump pump shall be a ½ ‐ ¾ HP minimum submersible sump pump (Goulds ST51 or equivalent) capable of pumping a minimum of 15 GPM against approximately 25 feet of total dynamic head.
‐ The bracing for the header pipe shall be fastened to the concrete wall of the drainage trench using minimum 3/8 inch x 4 inch concrete screw anchors. The screw holes shall be pre‐drilled to manufacturer specified diameter and prepared with epoxy (Sika Anchorfix‐1 or equivalent).
File details come from the government source that posted it. Updated .