1. Attachment Schedule - Updated 8.14.xlsx

XLSX spreadsheet 11 KB Posted

Attached to
Interior Door Replacement, STC, Building 3390 - Solicitation Federal contract opportunity
Solicitation number
W50S8B-23-B-0002
Issued by
Department of the Army National Guard

About this file

This document provides an attachment schedule for solicitation number W50S8B-23-B-0002 for interior door replacement at Building 3390. The schedule lists nineteen attachments including the solicitation, scope of work, floor plans, door details, specifications, wage determinations, and insurance requirements. The opportunity from the Department of the Army National Guard seeks to replace interior doors at the specified building with sound control doors meeting the standards outlined in the attachments by the response date. Relevant details such as pricing, awards, and set-asides are not provided in the attachment schedule or related solicitation information.

View the file

Other files for this federal contract opportunity

Other files attached to Interior Door Replacement, STC, Building 3390 - Solicitation, newest first.
File Type Posted
OF_1419 continuation Interior Doors.pdf PDF
OF_1419 Interior Doors.pdf PDF
14. W50S8B-23-B-0002 Amendment 1.pdf PDF
17. PreBid Conference Slides.pptx PPTX presentation
18. Site Visit Attendance sheet.jpg JPG image
16. Replace_interior_doors-3390_rfi-Responses.xlsx XLSX spreadsheet
19. Replace Interior Doors 3390 HArdware Schedule.pdf PDF
15. B3390_Spec-08385-Sound_Control_Doors.pdf PDF
Attach 12 - AT Statement.pdf PDF
Attach 11 - Insurance Requirements.docx DOCX document
Attach 09 - JB MDL Antiterrorism Awareness for Contractors.pdf PDF
Attach 03 - Instruction to Offerors.docx DOCX document
Attach 02 - Section 00010 Notes.docx DOCX document
Solicitation 23-B-0002.pdf PDF
Attach 06 B3390_A21_Door-Details.pdf PDF
Attach 10 DOL Wage Determination NJ20230027 06.30.pdf PDF
Attach 05 3390_A2-Floor-Plan-1998.pdf PDF
Attach 04 SOW PTFL232111 Replace STC Doors - 3390 SOW BM 5.11.docx DOCX document
Attach 01 - Attachment Schedule.xlsx XLSX spreadsheet
Attach 13 - Appendix 4 to Annex C Contractor Appendix.DOCX DOCX document
Attach 08 B3390_Specification_08385-STC-Doors.pdf PDF
Attach 07 B3390_Exist-Door_Sched-Partial.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet3

SF1442 ATTACHMENT SCHEDULE

W50S8B22B0003 Replace HVAC Condensing Unit (Updated 08/14/2023

ATTACH # TITLE SECTION

1Schedule of Attachments00010 - Notes
2Section 00010 - Notes00010 - Notes
3Section 00100 - Instruction to Offerors00100 - Notes
4Scope of Work00800 - Special Contract Requirements
5B3390-A2-Floor-Plan-199800800 - Special Contract Requirements
6B3390_A21_Door-Details00800 - Special Contract Requirements
7B3390_Exist-Door_Sched-Partial00800 - Special Contract Requirements
8B3390_Specification_08385-STC-Doors00800 - Special Contract Requirements
9JB MDL Antiterrorism Awareness for Contractors00800 - Special Contract Requirements
10DOL Wage Determination00800 - Special Contract Requirements
11Insurance Requirements00800 - Special Contract Requirements
12AT Statement00800 - Special Contract Requirements
13Appendix 4 to Annex C - Contractor Appendix00800 - Special Contract Requirements
14W50S8B-23-B-0003 Amendment 1SF30 Amendment 1 - Special Contract Requirements
15BB3390_Spec_08385 Sound_Control_DoorsSF30 Amendment 1 - Special Contract Requirements
16Replace Interior Door RFI ResponsesSF30 Amendment 1 - Special Contract Requirements
17Pre Bid Conference SlidesSF30 Amendment 1 - Special Contract Requirements
18Site Visit Attendance SheetSF30 Amendment 1 - Special Contract Requirements
19Replace Interior Door 3390 Hardware ScheduleSF30 Amendment 1 - Special Contract Requirements

File details come from the government source that posted it. Updated .