SZCQ242905 REPAIR AVB PLANS.pdf

PDF 3 MB Posted

Attached to
Active Vehicle Barrier Replacement Federal contract opportunity
Solicitation number
W50S8A25BA008
Issued by
Department of the Army New Hampshire Army National Guard

About this file

These are architectural and engineering design plans for the Repair Main Gate Active Vehicle Barriers project at Pease Air National Guard Base in Newington, New Hampshire. The solicitation (W50S8A-24-B-A008) is a 100% small business set-aside for commercial and institutional building construction, with a contract duration of approximately 270 days. Key details include:

The project involves replacing active vehicle barriers, with bids due on 26 August 2025 at 10:00 EST, to be opened at the Portsmouth Armory. A mandatory site visit is scheduled for 5 August 2025 at 10:00 AM EST at Pease ANGB. The contract is a firm fixed-price procurement seeking a contractor to provide all necessary labor, materials, tools, equipment, and supervision. The project falls under NAICS code 236220 with a small business size standard of $45.0M, and the associated Product Service Code is Y1PZ. Bids must be mailed to 302 Newmarket Street, Newington, NH 03803 or hand-delivered to the Portsmouth Armory on the bid opening date.

View the file

Other files for this federal contract opportunity

Other files attached to Active Vehicle Barrier Replacement, newest first.
File Type Posted
Sign in Sheet.jpg JPG image
Abstract_Vehicle Barrier.pdf PDF
W50S8A-25-B-A008 Active Vehicle Barrier Replacement Site Visit Sign-in Sheet.pdf PDF
SDDCTEA_Pamphlet_55-15.pdf PDF
DoD Anti-Ram Vehicle Barrier Approved List - Sep 2024.pdf PDF
UFGS 34 75 13.13.pdf PDF
SOW Repair AVBs V2.docx DOCX document
Site visit map.pptx PPTX presentation
SZCQ242905 Repair Main Gate AVB Specs.docx DOCX document
W50S8A25BA008 SF 1442.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COVER (1)

EXCON (2)
SITE PLAN (3)
DETAILS (4)

File details come from the government source that posted it. Updated .