UFGS 34 75 13.13.pdf

PDF 1 MB Posted

Attached to
Active Vehicle Barrier Replacement Federal contract opportunity
Solicitation number
W50S8A25BA008
Issued by
Department of the Army New Hampshire Army National Guard

About this file

This document is a Unified Facilities Guide Specification (UFGS) for Crash Rated Active Vehicle Barriers and Controls, specifically UFGS 34 75 13.13 dated February 2022. The comprehensive technical specification provides detailed requirements for designing, installing, and maintaining crash-rated vehicle barriers used in access control points and entry control facilities, covering various barrier types including retractable bollards, crash beams, and active net barriers.

The specification outlines rigorous technical standards for vehicle barriers, including crash resistance ratings based on ASTM F2656/F2656M impact conditions, with specific requirements for vehicle impact testing, penetration distances, safety schemes, control systems, and operational parameters. Key components include detailed specifications for barrier control systems, electrical and mechanical requirements, cybersecurity certifications, installation procedures, maintenance protocols, and warranty conditions. The document is intended to provide a comprehensive technical framework for government agencies procuring advanced vehicle barrier systems with precise performance and safety standards.

View the file

Other files for this federal contract opportunity

Other files attached to Active Vehicle Barrier Replacement, newest first.
File Type Posted
Sign in Sheet.jpg JPG image
Abstract_Vehicle Barrier.pdf PDF
DoD Anti-Ram Vehicle Barrier Approved List - Sep 2024.pdf PDF
SZCQ242905 REPAIR AVB PLANS.pdf PDF
W50S8A-25-B-A008 Active Vehicle Barrier Replacement Site Visit Sign-in Sheet.pdf PDF
SDDCTEA_Pamphlet_55-15.pdf PDF
W50S8A25BA008 SF 1442.pdf PDF
SOW Repair AVBs V2.docx DOCX document
Site visit map.pptx PPTX presentation
SZCQ242905 Repair Main Gate AVB Specs.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USACE / NAVFAC / AFCEC UFGS-34 75 13.13 (February 2022)

Preparing Activity: USACE Superseding UFGS-34 71 13.19 (February 2020)

UNIFIED FACILITIES GUIDE SPECIFICATIONS

References are in agreement with UMRL dated January 2025

SECTION TABLE OF CONTENTS

DIVISION 34 - TRANSPORTATION

SECTION 34 75 13.13

CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS

02/22

PART 1 GENERAL

1.1 REFERENCES

1.2 ABBREVIATIONS AND DEFINITIONS

1.2.1 Abbreviations

1.2.2 Definitions

1.3 SUBMITTALS

1.4 INSTALLATION PACKAGE

1.4.1 Overall System Drawings

1.4.2 Point to Point Wiring Information

1.4.3 Major Components

1.4.4 Data Package

1.4.4.1 Delivery

1.4.4.2 Technical Data and Software

1.4.4.3 Active Vehicle Barrier Controls

1.5 TRAFFIC CONTROL PLANS

1.5.1 Traffic Control Plan for the maintenance of traffic during construction

1.5.2 Traffic Control Plan During Crash Rated Active Vehicle Barrier

Maintenance

1.6 COMPONENT CERTIFICATION

1.7 CYBERSECURITY EQUIPMENT CERTIFICATION

1.8 OPERATION AND MAINTENANCE MANUALS

1.8.1 Software Manual

1.8.2 Hardware Manual

1.8.3 Functional Design Manual

1.8.4 Maintenance Manual

1.8.5 Application Software

1.8.6 Final System Drawings

1.9 CRASH RESISTANCE: DEMONSTRATION OF COMPLIANCE

1.9.1 DOD Letter of Certification

1.9.2 Crash Test Report

1.9.3 Different Length

SECTION 34 75 13.13 Page 1

1.9.4 Engineering Analysis

1.9.5 Retrofitted Barrier Systems

1.10 QUALITY CONTROL

1.10.1 Project Manager Qualifications

1.10.2 Installation Superintendent Qualifications

1.11 TECHNICAL SPECIALISTS QUALIFICATIONS

1.12 KEY CONTROL PLAN

1.13 DELIVERY, STORAGE, AND HANDLING

1.14 PROJECT/SITE CONDITIONS

1.14.1 Environmental Conditions

1.14.2 Exterior Conditions

1.14.3 Interior Conditions

1.14.4 Traffic Flow

1.14.5 Site Power Supply

1.14.6 Current Site Conditions

1.14.7 Generic Design and Contract Revisions

1.15 MAINTENANCE AND SERVICE

1.15.1 Description of Work

1.15.2 Service Personnel

1.15.3 Schedule of Work

1.15.3.1 Minor Inspections

1.15.3.2 Major Inspections

1.15.3.3 Scheduled Work

1.15.4 Operation

1.15.5 Records and Logs

1.15.6 System Modifications

1.15.7 Software

1.16 WARRANTY

1.16.1 Warranty Service

1.16.2 Service Call Requests

PART 2 PRODUCTS

2.1 SYSTEM DESCRIPTION

2.2 CRASH RATED ACTIVE VEHICLE BARRIER SAFETY SCHEME

2.3 CRASH RATED ACTIVE VEHICLE BARRIER FEATURES

2.3.1 Impact Conditions

2.3.2 Penetration Rating

2.3.3 Operators

2.3.4 Vehicle Loads

2.3.5 Roadway Obstruction

2.3.6 Dimension Requirements

2.3.6.1 Portable Barrier Width

2.3.7 Operation Speeds Excluding Crash Gates

2.3.8 Failure Modes of Operation

2.3.9 Manual (Non-Powered) Barrier Operation

2.3.10 Crash Rated Active Vehicle Barrier Foundations

2.3.11 Lane Coverage

2.3.12 SAFETY EQUIPMENT

2.4 CRASH RATED ACTIVE VEHICLE BARRIER(S)

2.4.1 RETRACTABLE BARRIERS

2.4.1.1 Configuration

2.4.1.2 Buttresses

2.4.1.3 Powered Retractable Barrier

2.4.2 ACTIVE NET BARRIERS

2.4.3 RETRACTABLE BOLLARDS

2.4.3.1 Bollard Height

2.4.3.2 Bollard On Center Spacing

2.4.3.3 Number of Bollards

SECTION 34 75 13.13 Page 2

2.4.3.4 Bollard Operations

2.4.3.5 Decorative Covers

2.4.3.6 Powered Retractable Bollards

2.4.4 CRASH GATE

2.4.4.1 Configuration

2.4.4.2 Fence Fabric

2.4.4.3 Powered Crash Gate

2.4.4.4 Manual Crash Gate

2.4.5 CRASH BEAM

2.4.5.1 Vertical Rising/Lifting Crash Beam

2.4.5.2 Vertical Pivot Crash Beam (Drop Arm)

2.4.5.3 Horizontal Sliding Crash Beam

2.4.5.4 Horizontal Swing Crash Beam (Barrier Arm)

2.4.5.5 Powered Crash Beam

2.4.5.6 Manual (Non-Powered) Crash Beam

2.4.6 PORTABLE CRASH RATED RETRACTABLE BARRIER

2.4.6.1 Powered Portable Crash Rated Retractable Barrier

2.4.6.1.1 Failure Modes of Operation

2.4.6.1.2 System

2.4.6.1.3 Controls

2.4.6.2 Manual Crash Rated Retractable Portable Barriers

2.4.7 PORTABLE PIVOTING OR SWINGING CRASH BEAM

2.4.7.1 Controls

2.4.7.2 Powered Portable Crash Beam

2.4.7.3 Manual Portable Crash Beam

2.5 POWER UNIT

2.5.1 HYDRAULIC POWER UNIT ENCLOSURE

2.5.2 ELECTRIC POWER UNIT ENCLOSURE

2.5.3 PNEUMATIC POWER UNIT ENCLOSURE

2.6 HEATER

2.7 FINISH AND MARKINGS

2.8 ACTIVE VEHICLE BARRIER CONTROL SYSTEM (AVBCS)

2.8.1 General Requirements

2.8.2 System Integration

2.8.3 AVBCS Processor

2.8.4 PROGRAMMABLE LOGIC CONTROLLER (PLC)

2.8.4.1 PLC General Requirements

2.8.4.2 Modular PLC

2.8.4.2.1 Central Processing Unit (CPU) Module

2.8.4.2.2 Communications Module

2.8.4.2.3 Power Supply Module

2.8.4.2.4 Input/Output (I/O) Modules

2.8.4.3 Program Storage/Memory Requirements

2.8.4.4 Input/Output Characteristics

2.8.4.5 Wiring Connections

2.8.4.6 On-Off Switch

2.8.4.7 Diagnostics

2.8.4.8 Accuracy

2.8.5 PLC SOFTWARE

2.8.5.1 Operating System

2.8.5.1.1 Startup

2.8.5.1.2 Failure Mode

2.8.5.2 Functions

2.8.5.2.1 Analog Monitoring

2.8.5.2.2 Logic (Virtual)

2.8.5.2.3 State Variables

2.8.5.2.4 Analog Totalization

2.8.5.3 Alarm Processing

2.8.6 AVB Control System Processing and Control Software

SECTION 34 75 13.13 Page 3

2.8.6.1 General

2.8.6.2 Resident Application Software

2.8.6.3 Display Information

2.8.6.4 Graphical Object Oriented Programming

2.8.6.5 Command Software

2.8.6.6 Command Input and Errors

2.8.6.7 Special Functions

2.8.6.8 Alarms

2.8.6.9 Report Generator

2.8.6.10 Periodic Automatic Report

2.8.6.11 Historical Data Storage and Retrieval

2.8.6.12 System Access Control

2.8.6.13 Convenience Outlet

2.8.7 CONTROL PANEL(S)

2.8.7.1 Master Control Panel

2.8.7.2 Remote EFO Control Panel - Primary

2.8.7.3 Remote EFO Control Panel - Secondary

2.8.7.4 Remote EFO Control Button

2.8.7.5 Remote - Local Control Panel

2.8.7.6 Keys for Switches

2.8.8 VOLTAGE

2.8.9 SEQUENCE OF EVENTS RECORDER

2.8.10 ALARM DISPLAY PANELS AT THE ID CHECK AREA AND SEARCH AREA(S)

2.8.11 Control Panel Components and Construction

2.8.11.1 Enclosures

2.8.11.2 Controllers

2.8.11.3 Standard Indicator Light

2.8.11.4 Selector Switches

2.8.11.5 Push Buttons

2.8.11.6 Relays

2.8.11.7 Terminal Blocks

2.8.11.8 Alarm Horns

2.8.11.9 Alarm Buzzer

2.8.11.10 Touchscreen

2.8.11.11 Wiring

2.9 SEQUENCE OF OPERATION

2.10 AVB LIGHTING

2.11 IN-PAVEMENT LUMINAIRES

2.12 WARNING BEACONS

2.13 BLANK-OUT SIGNS

2.14 TRAFFIC SIGNALS/HYBRID BEACON TRAFFIC SIGNALS

2.15 TRAFFIC SIGNAL SUPPORTS

2.16 VEHICLE PRESENCE, WRONG-WAY, AND OVERSPEED DETECTORS

2.16.1 Photoelectric Type

2.16.2 Induction Loops

2.16.3 Radar

2.16.4 Video Detection

2.17 WRONG-WAY AND OVERSPEED WARNING ANNUNCIATOR

2.18 NON-CRASH RATED ACTUATED TRAFFIC ARM ASSEMBLY

2.18.1 Traffic Arm at Other Areas

2.18.2 Traffic Arm at Active Vehicle Barrier

2.19 UNINTERRUPTIBLE POWER SUPPLIES (UPS)

2.20 SURGE PROTECTION

2.20.1 Power Line Surge Protection

2.20.2 Sensor Device Wiring and Communication Circuit Surge

Protection

2.21 INTRUSION DETECTION SYSTEM

2.22 CCTV SYSTEM

2.22.1 CCTV System

SECTION 34 75 13.13 Page 4

2.22.2 AVBCS and ESS Interface

2.23 MATERIALS AND COMPONENTS

2.23.1 Materials and Equipment

2.23.2 Single Manufacturer Active Vehicle Barriers

2.23.3 Field Enclosures

2.23.3.1 Interior Sensors

2.23.3.2 Exterior Sensors

2.23.3.3 Interior Electronics

2.23.3.4 Exterior Electronics

2.23.3.5 Corrosion Resistant

2.23.4 Above Ground Components

2.23.5 Below Ground Components

2.23.6 Nameplates

2.23.6.1 Components

2.23.6.1.1 AVB Nameplate

2.23.7 Tamper Switches

2.23.8 Locks and Key-Lock Switches

2.23.8.1 Locks

2.23.8.2 Key-Lock-Operated Switches

2.23.8.3 Construction Locks

2.23.9 System Components

2.23.9.1 Modularity

2.23.9.2 Maintainability

2.23.9.3 Interchangeability

2.23.9.4 Product Safety

2.24 LINE SUPERVISION

2.25 ELECTRICAL WORK

2.26 WIRE AND CABLE

2.26.1 Above Ground Sensor Wiring

2.26.2 Cable Construction

2.27 DATA TRANSMISSION SYSTEM (DTS)

2.28 CONCRETE

2.29 WELDING

2.30 ACCESSORIES

2.31 FABRICATION

2.32 TEST, INSPECTIONS AND VERIFICATIONS

2.33 FACTORY ACCEPTANCE TEST

2.33.1 General

2.33.2 Factory Acceptance Test Plan

2.33.3 Factory Acceptance Test Report

PART 3 EXECUTION

3.1 EXAMINATION

3.2 INSTALLATION

3.2.1 Oversight

3.2.1.1 Observation and Inspection

3.2.1.2 Installer Training/Certification

3.2.2 Installation Schedule

3.2.3 Crash Rated Active Vehicle Barrier Installation

3.2.3.1 Vertical Alignment

3.2.3.2 Horizontal Alignment

3.2.3.3 Field Welding

3.2.3.4 Field Cutting and Drilling

3.2.4 Hydraulic Lines

3.2.5 Incidental Infrastructure

3.2.6 Concrete Placement

3.2.7 Reinforcing Steel Inspection

3.3 CYBERSECURITY INSTALLATION CERTIFICATION

SECTION 34 75 13.13 Page 5

3.4 DRAINAGE

3.4.1 Pit Drainage

3.4.2 Surface Drainage

3.5 ELECTRICAL

3.5.1 Wiring

3.5.2 Grounding

3.5.3 Enclosure Penetrations

3.5.4 Exterior Components

3.5.5 Other Requirements

3.6 OPERATING AND MAINTENANCE INSTRUCTIONS

3.7 REPAIR

3.8 TEST PLANS

3.9 CONTRACTOR VERIFICATION TEST

3.10 FINAL SYSTEM ACCEPTANCE

3.10.1 General

3.10.2 Team Leader

3.10.3 Commissioning Team

3.10.4 Training

3.10.4.1 General Requirements

3.10.4.2 Guard's Training

3.10.4.3 Maintenance Personnel Training

3.10.4.4 System Manager Training

3.10.5 Performance Verification Test (PVT)

3.10.5.1 Test Plan

3.10.5.2 Test Equipment and Personnel

3.10.5.3 Commissioning

3.10.5.4 Test Report

3.10.5.5 Opposite Season Test

3.10.6 Endurance Test

3.10.6.1 General

3.10.6.2 Phase I Testing

3.10.6.3 Phase II Assessment

3.10.7 Final Report

3.10.8 Post Commissioning PVT

3.10.9 APPENDICES

ATTACHMENTS:

Appendix A

-- End of Section Table of Contents --

SECTION 34 75 13.13 Page 6

USACE / NAVFAC / AFCEC UFGS-34 75 13.13 (February 2022)

Preparing Activity: USACE Superseding UFGS-34 71 13.19 (February 2020)

UNIFIED FACILITIES GUIDE SPECIFICATIONS

References are in agreement with UMRL dated January 2025

SECTION 34 75 13.13

CRASH RATED ACTIVE VEHICLE BARRIERS AND CONTROLS

02/22

NOTE: This guide specification covers the requirements for the design of a crash rated active vehicle barrier system where the crash rated active vehicle barriers can consist of a portable, semi-permanent, permanent, power-assisted or manually deployed crash rated active vehicle barriers, covers the active vehicle barrier control system, and non-crash rated actuated traffic arms.

Designer should consult UFC 4-022-01 Entry Control Facilities Access Control Points at https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-4-022-01 and for Army projects consult the Access Control Point Standard and Standard Design Criteria. This specification supercedes previous versions of 34 71

13.19 Active Vehicle Barriers and replaces 34 41

26.00 10 Access Control Point Control System.

Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc/ufc-1-300-02 when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.

Remove information and requirements not required in respective project, whether or not brackets are present.

Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a criteria change request at https://www.wbdg.org/ffc/dod/unified-facilities-guide-specifications-ufgs/ufgs-34-71-13-19

SECTION 34 75 13.13 Page 7

PART 1 GENERAL

NOTE: The design of an access control point/entry control facility (ACP/ECF) must be fully engineered to ensure compliance with the appropriate Army, Navy or Air Force Standards for ACPs/ECFs. Using these standards and criteria, the designer must prepare an ACP/ECF project specific design including the drawings as indicated herein. The project specific drawings along with this edited performance specification must be included in the procurement documents for the ACP/ECF crash rated active vehicle barrier (AVB) control system.

Drawings must identify the following: active and passive vehicle barrier locations, overspeed and wrong way detection zones, Closed Circuit Television (CCTV) camera coverage areas, Intrusion Detection Sensor and tamper switch locations, duress alarm locations, traffic signal and warning beacon locations, actuated traffic arm locations, and incidental construction. Provide active barrier control panels locations and layouts and sequence of operation.

Army Project: ACP Standard Design Drawings can be used in the development of the requirements herein.

However, if changes to the control panels from the drawings are made, the designer is responsible for ensuring the changes are reflected.

This UFGS replaces UFGS 34 75 13.19. All references in other documents, standards, and criteria to 34 75 13.19 now apply to 34 75 13.13.

1.1 REFERENCES

NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.

Use the Reference Wizard's Check Reference feature when you add a RID outside of the Section's Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizard's Check Reference feature to update the issue dates.

References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

SECTION 34 75 13.13 Page 8

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO GDHS-7 (2018; Errata 2019) A Policy on Geometric Design of Highways and Streets

AASHTO LTS (2013; Errata 2013) Standard Specifications for Structural Supports for Highway Signs, Luminaires and Traffic Signals

AASHTO RSDG-4 (2011; Errata 1 2012; Errata 2 2015) Roadside Design Guide

AMERICAN WELDING SOCIETY (AWS)

AWS D1.1/D1.1M (2020; Errata 1 2021) Structural Welding Code - Steel

ASTM INTERNATIONAL (ASTM)

ASTM A106/A106M (2019a) Standard Specification for Seamless Carbon Steel Pipe for High-Temperature Service

ASTM A123/A123M (2024) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products

ASTM D4956 (2013) Standard Specification for Retroreflective Sheeting for Traffic Control

ASTM F2656/F2656M (2023) Standard Test Method for Crash Testing of Vehicle Security Barriers

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE 142 (2007; Errata 2014) Recommended Practice for Grounding of Industrial and Commercial Power Systems - IEEE Green Book

IEEE C37.90 (2005; R 2011) Standard for Relays and Relay Systems Associated With Electric Power Apparatus

IEEE C37.90.1 (2023; ERTA) Standard for Surge Withstand Capability (SWC) Tests for Relays and Relay Systems Associated with Electric Power Apparatus

IEEE C62.41.1 (2002; R 2008) Guide on the Surges Environment in Low-Voltage (1000 V and Less) AC Power Circuits

IEEE C62.41.2 (2002) Recommended Practice on Characterization of Surges in Low-Voltage (1000 V and Less) AC Power Circuits

SECTION 34 75 13.13 Page 9

INTERNATIONAL ELECTROTECHNICAL COMMISSION (IEC)

IEC 60068-2-27 (2008; ED 4.0) Environmental Testing - Part 2-27: Tests - Test Ea and Guidance:

Shock

IEC 60068-2-30 (2005; ED 3.0) Environmental Testing - Part 2-30: Tests - Test Db: Damp Heat, Cyclic (12 H + 12 H Cycle)

IEC 61000-4-5 (2017) Electromagnetic Compatibility (EMC)

- Part 4-5: Testing and Measurement Techniques - Surge Immunity Test

IEC 61131-3 (2013) Programmable Controllers - Part 3:

Programming Languages

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION (ISO)

ISO ISO/IEC 17025 (2017) General Requirements for the Competence of Testing and Calibration Laboratories

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA 250 (2020) Enclosures for Electrical Equipment (1000 Volts Maximum)

NEMA ICS 1 (2022) Standard for Industrial Control and Systems: General Requirements

NEMA ICS 2 (2000; R 2020) Industrial Control and Systems Controllers, Contactors, and Overload Relays Rated 600 V

NEMA ICS 4 (2015) Application Guideline for Terminal Blocks

NEMA MG 1 (2021) Motors and Generators

NEMA TC 2 (2020) Standard for Electrical Polyvinyl Chloride (PVC) Conduit

NEMA TS-1 (1989; R 2020) Traffic Control Systems (not recommended for new designs)

NEMA TS-2 (2021) Traffic Controller Assemblies with NTCIP Requirements - Version 03.08

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2023; ERTA 1 2024; TIA 24-1) National Electrical Code

NFPA 70E (2024) Standard for Electrical Safety in the Workplace

SECTION 34 75 13.13 Page 10

SOCIETY OF AUTOMOTIVE ENGINEERS INTERNATIONAL (SAE)

SAE J517 (2020) Hydraulic Hose

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2024) Safety -- Safety and Occupational Health (SOH) Requirements

U.S. DEPARTMENT OF DEFENSE (DOD)

DOD 8500.01 (2014; Change 1-2019) Cybersecurity

DOD 8510.01 (2022) Risk Management Framework (RMF) for DoD Systems

U.S. FEDERAL HIGHWAY ADMINISTRATION (FHWA)

MUTCD (2009; Rev 2012) Manual on Uniform Traffic Control Devices

NCHRP 350 (1993) Recommended Procedures for the Safety Performance Evaluation of Highway Features

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

21 CFR 1040 Performance Standards for Light-Emitting Products

29 CFR 1910 Occupational Safety and Health Standards

47 CFR 15 Radio Frequency Devices

UL SOLUTIONS (UL)

UL 486A-486B (2018; Reprint Jul 2023) UL Standard for Safety Wire Connectors

UL 508 (2018; Reprint Jul 2021) UL Standard for Safety Industrial Control Equipment

UL 651 (2011; Reprint May 2022) UL Standard for Safety Schedule 40, 80, Type EB and A Rigid PVC Conduit and Fittings

UL 796 (2020; Reprint Oct 2023) UL Standard for Safety Printed Wiring Boards

UL 1059 (2024) UL Standard for Safety Terminal Blocks

UL 1076 (2018; Reprint Feb 2021) UL Standard for Safety Proprietary Burglar Alarm Units and Systems

SECTION 34 75 13.13 Page 11

1.2 ABBREVIATIONS AND DEFINITIONS

1.2.1 Abbreviations

a. ACP - Access Control Point

b. AIE - Automated Installation Entry

c. AVB - Active Vehicle Barrier

d. AVBCS - Active Vehicle Barrier Control System

e. BMS - Balanced Magnetic Switch

f. CCTV - Closed Circuit Television System

g. CPU - Central Processing Unit (Computer)

h. CSMS - Central Security Monitoring Station (e.g., Installation Police

Station)

i. CVT - Contractor Verification Test

j. DTS - Data Transmission System

k. ECF - Entry Control Facility

l. EFO - Emergency Fast Operate (active barrier emergency fast close control)

m. FAT - Factory Acceptance Test

n. IDS - Intrusion Detection System

o. PLC - Programmable Logic Controller

p. PVT - Performance Verification Test

q. RSM - Remote Status Monitor

r. SDC - Standard Design/Criteria

s. SDDC - Surface Deployment and Distribution Command

t. SDDCTEA - Surface Deployment and Distribution Command Traffic

Engineering Agency

u. TCU - Traffic Controller Unit

v. UPS - Uninterruptible Power Supply

w. VCC - Visitors Control Center

x. VPD - Vehicle Presence Detector

1.2.2 Definitions

Command & Control. Command & Control function refers to location the main guard will be located to oversee the activity at the ECF/ACP. This is typically the Gatehouse, but not in all cases.

Crash-rated active vehicle barrier. Crash-rated active vehicle barrier and active vehicle barrier in this specification refer to a vehicle barrier that has been tested to impede or stop a vehicle of a specific weight and speed. The barrier is operable either manually or through electrical controls.

1.3 SUBMITTALS

NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list, and corresponding submittal items in the text, to reflect only the submittals required for the project. The Guide Specification technical editors have classified those items that require Government approval, due to their complexity or criticality, with a "G." Generally, other submittal items can be reviewed by the Contractor's Quality Control System. Only add a “G” to an item, if the submittal is sufficiently important or complex in context of the project.

SECTION 34 75 13.13 Page 12

For Army projects, fill in the empty brackets following the "G" classification, with a code of up to three characters to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: "AE" for Architect-Engineer; "DO" for District Office (Engineering Division or other organization in the District Office); "AO" for Area Office; "RO" for Resident Office; and "PO" for Project Office. Codes following the "G" typically are not used for Navy and Air Force projects.

The "S" classification indicates submittals required as proof of compliance for sustainability Guiding Principles Validation or Third Party Certification and as described in Section 01 33 00 SUBMITTAL

PROCEDURES.

Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for Contractor Quality Control approval. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government. Submit the following in accordance with Section

01 33 00 SUBMITTAL PROCEDURES:

SD-02 Shop Drawings

Overall System Drawings ; G, [_____]

Point to Point Wiring Information ; G, [_____]

TRAFFIC CONTROL PLANS; G, [_____]

crash rated active vehicle barrier system ; G, [_____]

Installation ; G, [_____]

Electrical Work ; G, [_____]

Touchscreen ; G, [_____]

SD-03 Product Data

[ Major Components ; G, [_____]

][ Data Package ; G, [_____]

] CRASH RESISTANCE: DEMONSTRATION OF COMPLIANCE; G, [_____]

Hydraulic Fluid manufacturer's data ; G, [_____]

SD-05 Design Data traffic signal support design calculations ; G, [_____]

UPS Calculations ; G, [_____]

SECTION 34 75 13.13 Page 13

Generic Design and Contract Revisions ; G, [_____]

SD-06 Test Reports

Crash Test Reports ; G, [_____]

Current Site Conditions ; G, [_____]

KEY CONTROL PLAN; G, [_____]

Factory Acceptance Test ; G, [_____]

Factory Acceptance Test Report ; G, [_____]

Contractor Verification Test ; G, [_____]

Contractor Verification Test Report ; G, [_____]

Performance Verification Test (PVT) ; G, [_____]

Performance Verification Test Report ; G, [_____]

Endurance Test ; G, [_____]

Final Report ; G, [_____]

SD-07 Certificates

COMPONENT CERTIFICATION; G, [_____]

Cybersecurity Equipment Certification ; G, [_____]

Cybersecurity Installation Certification ; G, [_____]

Installation Superintendent Qualifications ; G, [_____]

Project Manager Qualifications ; G, [_____]

TECHNICAL SPECIALISTS QUALIFICATIONS ; G, [_____]

SD-08 Manufacturer's Instructions

Manufacturer Repair of Coatings Instructions ; G, [_____]

SD-10 Operation and Maintenance Data

Operation and Maintenance Manuals ; G, [_____]

OPERATING AND MAINTENANCE INSTRUCTIONS; G, [_____]

Submit operation and maintenance data in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA, Controls O&M Data Package and the requirements herein.

1.4 INSTALLATION PACKAGE

Submit Installation package [120][150] days after receipt of the Notice to Proceed. The installation package consists of the overall system drawings, major components and data package.

SECTION 34 75 13.13 Page 14

1.4.1 Overall System Drawings

Include the following in overall system drawing package:

a. Functional System Block Diagram, identifying all major equipment including interconnection between components specified herein and those furnished under other sections and communications protocols.

(1) Indicate control/signal and data communication paths and identify PLCs, control interface devices, and media to be used

(2) Describe characteristics of network and other data communication lines.

(3) Describe methods used to protect against power outages and transient voltages including types and ratings of isolation and surge suppression devices used in data, communication, signal, control, and ac and dc power circuits.

b. Block and Wiring Diagrams of each subsystem.

c. Drawing showing equipment layout in the Command & Control including the Master control panel, UPS, and other hardware intended to be located in the Command & Control.

d. Drawing showing equipment layout around the crash rated active vehicle barriers including the crash rated active vehicle barriers, active vehicle barrier control box(es), vehicle presence detectors, stop lines, traffic signals, warning beacons (wig-wag warning signals) (if applicable), and actuated traffic arms (if applicable).

e. A signing and pavement marking plan.

f. Drawing showing layout and dimensions of the each individual active vehicle barrier operating panels.

g. Touchscreen Audible Tones and Visual Indications if used. Include the following material for use at touchscreen video control panels:

(1) Audible indication, notification, and alarm tones.

(2) Visual materials for touchscreen video control panel display screens, complete with proposed shapes, colors, scale, and textual content.

Provide the following: graphics, including maps; icons; dialog boxes;

and help messages, prompts and instructions. Provide material in color.

h. Tamper switch locations for AVBCS related cabinets and operating panels.

i. Vehicle presence[, overspeed,] [and wrong-way] detector locations, set-points, and sensor detection patterns. Include descriptions of the security strategy for detecting potential threat vehicles, the coverage and operation of the sensors, and the human machine interfaces for overspeed and wrong way alarms.

j. Details of connections to power sources, including power supplies and grounding.

SECTION 34 75 13.13 Page 15

k. Preliminary point-to-point wiring database. Preliminary submittals is to provide sufficient detail to ensure the final database has all the appropriate information. Provide details such as the legend to be used for the different wiring types, alphanumeric numbering scheme, abbreviations to be used, and the layout of the database. Provide an example of a small section of the system showing the point-to-point wiring.

1.4.2 Point to Point Wiring Information

Final point-to-point wiring diagram of complete interconnected system including database listing of wire numbers, to and from designations, and wire characteristics. Provide the final database for the wiring. The database is to include details such as the legend to be used for the different wiring types, alphanumeric numbering scheme, abbreviations to be used, and where the wire starts and where it ends..

1.4.3 Major Components

NOTE: Delete items not in the project.

Submit the following for approval:

a. Active Vehicle Barrier Controls to include pushbuttons, indicating lights, switches and panels.

b. Programmable Logic Controller.

c. Traffic Signs: powered and unpowered.

d. Traffic signals and traffic signal supports.

e. Warning Beacons (wig-wags).

f. In-pavement lights.

g. Alarm display panels.

h. Sequence of Events Recorder.

i. Cable and wiring used for the data transmission.

j. Surge protection device.

k. Cabinets and other main components needed to make a complete system.

l. Tamper switches.

[ m. Actuated traffic arms.

[ n. Touch screens, if allowed.

[ o. Equipment used for presence detection.

[ p. Wrong-way detection.

[ q. Overspeed detection.

SECTION 34 75 13.13 Page 16

1.4.4 Data Package

NOTE: The acquisition of all technical data, data bases and computer software items that are identified herein will be accomplished strictly in accordance with the Federal Acquisition Regulation (FAR) and the Department of Defense Acquisition Regulation Supplement (DOD FARS). Those regulations, as well as the Air Force, Navy, Army and Corps of Engineers implementations thereof, should also be consulted to ensure that a delivery of critical items of technical data is not inadvertently lost. Specifically, the Rights in Technical Data and Computer Software Clause, DOD FAR 52.227-7013, and the Data Requirements Clause, DOD FAR 52.227-7031, as well as any requisite software licensing agreements will be made a part of the CONTRACT CLAUSES or SPECIAL CONTRACT REQUIREMENTS.

In addition, the appropriate DD Form 1423 Contract Data Requirements List, will be filled out for each distinct deliverable data item and made a part of the contract. Where necessary, a DD Form 1664, Data Item Description, will be used to explain and more fully identify the data items listed on the DD Form 1423. It is to be noted that all of these clauses and forms are required to ensure the delivery of the data in question and that such data is obtained with the requisite rights to use by the Government.

Include with the request for proposals a completed DD Form 1423, Contract Data Requirements List. This form is essential to obtain delivery of all documentation. Each deliverable will be clearly specified, both description and quantity being required.

1.4.4.1 Delivery

Deliver all items of computer software and technical data (including technical data which relates to computer software), which is specifically identified in this specification in accordance with the CONTRACT CLAUSES, SPECIAL CONTRACT REQUIREMENTS, and in accordance with the Contract Data Requirements List (CDRL), DD FORM 1423, which is attached to and thereby made a part of this contract. Identify all data delivered by reference to the particular specification paragraph against which it is furnished.

1.4.4.2 Technical Data and Software

Include the following in the data package:

a. Communications speeds and protocol descriptions.

b. Operator commands.

c. Alarm and system messages and printing formats.

d. Start-up and shut-down operations including system and database

SECTION 34 75 13.13 Page 17 backup operations.

e. Expansion capability and method of implementation.

f. Sample copy of sequence of events report.

g. Color print of the graphical user interface (GUI) screens (when used) on 216 x 292 mm 8-1/2 by 11 inch paper.

h. System data entry requirements.

i. User enrollment.

j. System and application software descriptions.

k. Recovery and restart procedures.

l. Use of report generator and generation of reports.

1.4.4.3 Active Vehicle Barrier Controls

Describe operation of the different barrier control operating modes to include normal and emergency operation, barrier control switches, [actuated traffic arms,] [overspeed,] [wrong-way,] traffic signals, warning beacons, and vehicle presence detectors. Include description of security strategy for defeating a threat vehicle and the SDDC approved barrier safety scheme for protecting innocent vehicles from barrier operations.

1.5 TRAFFIC CONTROL PLANS

1.5.1 Traffic Control Plan for the maintenance of traffic during construction

NOTE: Army Projects choose the bracketed option.

Provide a Traffic Control Plan for maintenance of traffic during construction[ per Section 08C of EM 385-1-1 ].

1.5.2 Traffic Control Plan During Crash Rated Active Vehicle Barrier Maintenance

Describe plans for taking one or more active barriers out of service for maintenance or testing purposes, while other barriers at the ACP/ECF remain in service. As a minimum, include requirements for traffic signal indications, for bagging signal heads, and for temporary passive barriers and signage, e.g., Type 3 passive barriers, per MUTCD. Include both short term (less than an hour) and long term plans.

1.6 COMPONENT CERTIFICATION

Provide certifications from the manufacturers of the following equipment as part of the data package: crash rated active vehicle Barrier, [programmable logic controller (PLC),] [traffic arm,] warning signal, annunciator, sequence of events recorder, and all sensors including [overspeed,] [wrong-way,] [and ]vehicle presence.

SECTION 34 75 13.13 Page 18

1.7 CYBERSECURITY EQUIPMENT CERTIFICATION

NOTE: In some cases a dedicated cybersecurity specification may be provided for the AVB control system. If so, designer is responsible for adding in the specification number and name into the paragraph. Coordinate equipment certification with Government's cybersecurity requirements and interpretations. Verify that the system includes remote control or remote access capability.

Furnish a certification that control systems are designed and tested in accordance with Section 25 05 11 CYBERSECURITY OF FACILITY RELATED CONTROL SYSTEMS, and as required by individual Service Implementation Policy.

1.8 OPERATION AND MAINTENANCE MANUALS

Submit finalized manuals in electronic/digitial format within 30 days after completing the Endurance test. Update the draft copy used during site testing with any changes required prior to final delivery of the manuals. Identify each manual's contents on the cover. Include in each manual the names, addresses, and telephone numbers of each subcontractor installing equipment and systems, and the nearest service representative for each item of equipment. Provide each manual with a table of contents and tab sheets. Place tab sheets at the beginning of each chapter or section and at the beginning of each appendix. Include modifications made during installation, checkout, and acceptance in the final copies delivered after completion of the endurance test. Provide the number of copies of each manual to be delivered per DD FORM 1423.

1.8.1 Software Manual

In the software manual describe the functions of all software and include all other information necessary to enable proper loading, testing, and operation. As a minimum, include in the manual the following:

a. Definition of terms and functions.

b. Use of system and application software.

c. Procedures for system initialization, start-up and shutdown.

d. Alarm reports.

e. Reports generation.

f. Database format and date entry requirements.

g. Directory of all disk files.

h. Description of all communication protocols, including data formats, command characters, and a sample of each type of data transfer.

1.8.2 Hardware Manual

As a minimum, describe all equipment furnished in the hardware manual and include the following:

SECTION 34 75 13.13 Page 19

a. General description and specifications.

b. Installation and checkout procedures.

c. Equipment electrical schematics and layout drawings.

d. System schematics and layout drawings.

e. Alignment and calibration procedures.

f. Manufacturer's repair parts list indicating sources of supply.

1.8.3 Functional Design Manual

Identify the operational requirements for the system and explain the theory of operation, design philosophy, and specific functions within the functional design manual. Include a description of hardware and software functions, interfaces, and requirements for all system operating modes.

1.8.4 Maintenance Manual

Include descriptions of maintenance for all equipment including inspection, periodic prevention maintenance (include specific time intervals for each recommended preventative maintenance tasks), fault diagnosis, and repair or replacement of defective components in the maintenance manual.

1.8.5 Application Software

NOTE: Army projects. Choose the option USACE Protective Design Center.

Provide a copy of the software installation package on optical disk that runs the control program. Provide on optical disk, separate from the operating system software, the complete program or image of the installed software, with all custom changes and configuration data specific for the installed system. At the end of project, after the endurance test is complete, provide complete sets of optical discs. [Provide one set of discs to the USACE Protective Design Center.Provide one to be turned over to the User.]

1.8.6 Final System Drawings

Maintain a separate set of drawings (including site, civil, electrical, mechanical, structural, and architectural plans, elevations, and details), elementary diagrams, wiring diagrams, and control diagrams of the system to be used for final system drawings. This set is to be accurately kept up-to-date with all changes and additions to the AVBCS and to be delivered to the Government with the final endurance test report. In addition to being complete and accurate, this set of drawings is to be kept neat and not be used for installation purposes. Furnish final drawings with the endurance test report on optical disk in [Microstation latest Version] [or] [AutoCAD latest version][_____] format.

1.9 CRASH RESISTANCE: DEMONSTRATION OF COMPLIANCE

NOTE: Prior to February 1, 2009 both DOS and DOD

SECTION 34 75 13.13 Page 20 certified crash rated active vehicle barriers were based on test reports submitted by a manufacturer.

Barriers tested prior to February 1, 2009 and subsequently certified by DOS are included in a final published list for use by others. DOD will continue to certify and publish their own certified list. Both of these lists may be found by pointing your web browser to

DOD requires all crash-rated (anti-ram) active vehicle barriers utilized at access control points / entry control facilities be on the DOD Anti-Ram Vehicle Barrier list.

Submit the following as demonstration of compliance with the specified crash resistance requirements for each crash rated active vehicle barrier proposed for this project. Department of Defense requires all crash-rated active vehicle barriers to be on the DOD Anti-Ram Vehicle List. The DOD Anti-Ram Vehicle List in effect at the time of contract award is to be used.

1.9.1 DOD Letter of Certification

Submit a DOD Letter of Certification for crash-rated active vehicle barrier with a configuration identical to the as tested crash rated active vehicle barrier being provided. DOS Letter of Certification is allowed;

however, the crash-rated active vehicle barrier must be on the DOD anti-ram vehicle barrier list.

1.9.2 Crash Test Report

NOTE: This paragraph is required for those barriers not on the DOD list.

Submit a crash test report for crash-rated active vehicle barrier with a configuration identical to the as tested crash rated active vehicle barrier being provided from a testing laboratory accredited by a nationally recognized testing agency in accordance with ISO ISO/IEC 17025 .

This report is only required for crash-rated active vehicle barriers that are not on the DOD list. The information is to be submitted with the barrier submittal and is to show an approved crash test per ASTM F2656/F2656M . This submittal takes up to 8 weeks to review and is not quarantee that the report will be approved.

NOTE: On Army projects, the Protective Design Center is required to review the submittal. See the following link:

1.9.3 Different Length

The only exception to the requirement that the tested crash rated active vehicle barrier be identical to the as tested crash rated active vehicle barrier being provided is the barrier's length. If a length other than that tested is required, the length of the required crash rated active

SECTION 34 75 13.13 Page 21 vehicle barrier must represent an interperloation between the successfully tested lengths of crash rated active vehicle barriers that are identical in all other ways. The tested shorter crash rated active vehicle barrier and the tested longer crash rated active vehicle barrier must be identical in construction and testing conditions before the alternate length can be considered. If the length of the required barrier for this project is different than the length tested, provide Crash Test Reports for identical barriers at the maximum/minimum width conditions as required by ASTM F2656/F2656M section 8.2.5. In addition to the test report, provide a letter written by the manufacturer clearly stating that the alternate length crash rated active vehicle barrier is to be constructed in the same manner as the tested barriers. [The crash test reports are to be submitted to the Protective Design Center, Omaha US Army Corps of Engineers for review.]

1.9.4 Engineering Analysis

Engineering analysis is not an acceptable form of Demonstration of Compliance.

1.9.5 Retrofitted Barrier Systems

Manufacturer is to provide additional documentation that indicates DOD, DOS or ASTM required ratings have been maintained for any barriers that were originally configured and tested with hydraulic systems, but have been revised or retrofitted to be electric (electromechanical). Provide sufficient information to compare the hydraulic system with the electric system to ensure the change in actuation does not change the ability of the barrier to maintain its tested rating. Manufacturer is to provide a response on company letter head stating that the rating is still valid along with the supporting material.

Provide documentation from the manufacturer that ensures the motor and actuator is sized sufficiently for long term use given the weight of the barrier and the response time requirements. In addition, ensure the electrical components are adequate for the environment as covered elsewhere in this specification.

1.10 QUALITY CONTROL

NOTE: The prime contractor will have quality control managers and representatives as a part of their contract requirements. This additional level should only be considered on larger projects or on projects with unique control requirements. The main intention of this portion is to have one main person below the Prime contractor that is responsible for coordinating all the systems involved with the work in this specification. Edit or delete paragraphs as required for the project.

1.10.1 Project Manager Qualifications

Designate a Project Manager for all work under this specification.

Project Manager is to provide technical and managerial leadership to all contractor personnel and subcontractors during the design, manufacturer, and installation phases of this specification. This person serves as the single point of contact for the General Contractor for all work required

SECTION 34 75 13.13 Page 22 in this specification. The Project Manager must have a minimum of 5 years of experience in the design, manufacture, and installation of similar systems.

1.10.2 Installation Superintendent Qualifications

Designate an Installation Superintendent responsible for onsite installation team direction and leadership. First line supervision of tradesmen and subcontractors is provided by the Superintendent. The Superintendent is responsible for job planning and coordination between the work with trades, subcontractors, vendors, and site personnel. The Superintendent is responsible for scheduling materials, equipment, and labor to maintain the flow of work commensurate with the task schedule.

The Superintendent administers and executes the provisions of the Accident Prevention Plan. The Superintendent must have a minimum of 5 years of experience in the installation, operation, and testing of similar systems. The Project Manager and the Installation Superintendent can be the same individual.

1.11 TECHNICAL SPECIALISTS QUALIFICATIONS

Provide the services of technical specialists for the crash rated active vehicle Barriers and the related control system. Submit names and qualifications for each of the technical specialists involved. The technical specialists are to have a minimum of 3 years of experience in the installation, operation, and testing of all components, software, and interconnecting wiring of their particular equipment/subsystem. The presence of each technical specialist is required during Factory Tests of the system, during installation in the field, and serves as the Contractor's Commissioning Specialist for their designated equipment/subsystem for the commissioning tests as specified.

1.12 KEY CONTROL PLAN

Key control plan for all Contractor provided enclosures requiring locks and all keyed control switches. Provide a key control plan that includes the following: 1) Procedures that will be used to log and positively control all keys during installation. 2) A listing of all keys and where they are used. 3) A listing of all persons allowed access to the keys.

1.13 DELIVERY, STORAGE, AND HANDLING

Protect components delivered to site and/or placed in storage from the weather, humidity (and humidity variation), temperature (and temperature variation), dirt and dust, or other contaminants. Store structural materials on sleepers or pallets and protect them from rust and objectionable materials such as dirt, grease, or oil. Handle all components to protect finish and coatings from scuffs, abrasions or other damage. Excessive damage to factory applied finishes and coatings is cause for rejection. Provide all other delivery, storage and handling protections as recommended by the manufacturer.

1.14 PROJECT/SITE CONDITIONS

NOTE: Edit with actual site conditions if more stringent then the default values.

SECTION 34 75 13.13 Page 23

1.14.1 Environmental Conditions

All materials, equipment and installation techniques must be appropriate for the prevalent environmental conditions at the installation location.

Installation is to be in conformance with manufacturer's written environmental requirements. Submit Manufacturer's Environmental Requirements.

1.14.2 Exterior Conditions

House all components mounted in locations exposed to weather in corrosion-resistant enclosures with appropriate environmental protection.

Improper housing design is not to cause a degradation in component performance.

Provide components (those installed outside or in an enclosure exposed outside) that meet the following ambient conditions:

a. Temperature: [-32 to 60][_____]degrees C [ -25 to 140][_____]degrees F ;

b. Pressure: Sea level to 4,573 m 15,000 feet above sea level;

c. Solar radiation: Six hours of solar radiation at dry bulb temperature of 60 degrees C 120 degrees F including 4 hours of solar radiation at

0.00112 watts per square mm 104 watts psf ;

d. Sand and dust: Wind driven for up to [9.6][_____] km/hour [6][_____] mph;

e. Rain: 50 mm 2 inches per hour and 125 mm 5 inches per hour cyclic with wind plus one period of 300 mm 12 inches per hour;

f. Humidity: 5 to 95 percent;

g. Fungus: Warm, humid atmosphere conducive to the growth of heterotrophic plants;

h. Salt fog: Salt atmosphere with 5 percent salinity;

i. Snow: Snow loading of 234 kg/square m 48 pounds psf per hour; blowing snow of 22.5 kg/square m 4.6 psf per hour;

j. Ice accretion: Up to 13 mm 1/2 inch of radial ice;

k. Wind: Up to 80 km/h 50 mph with gusts to 106 km/h 66 mph , except that fence sensors are to detect intrusions up to 56 km/h 35 mph ; and

l. Acoustical noise: Components are to suitable for use in high noise areas above 110 dB, such as flight lines, run up pads, and generator sites without adversely affecting their performance.

m. Elevation. [_____] m [_____] feet

1.14.3 Interior Conditions

Provide equipment, which is installed in environmentally protected interior areas, that meet the performance requirements specified for the following ambient conditions:

SECTION 34 75 13.13 Page 24

a. Temperature: 0 to 50 degrees C 32 to 120 degrees F . Components installed in unheated security protected areas must meet performance requirements for temperatures as low as -17 degrees C zero degrees F ;

b. Pressure: Sea level to 4,573 m 15,000 feet above sea level;

c. Relative humidity: 5 to 95 percent;

d. Fungus: Provide system components located in fungus growth inductive environments with a treatment to provide fungus resistance.

Treatments cannot include mercury, materials increase the flammability of the material or surface being treated or cause skin irritation or other injury to personnel handling it during fabrication, transportation, operation, or maintenance of the equipment, or during use of the finished items when used for the purpose intended; and

e. Acoustical noise: Provide components suitable for use in high noise areas above 100 dB, such as boiler rooms, power plants, and foundries without adversely affecting their performance.

NOTE: Barriers control systems that are not normally being used to meter traffic can delete the first sentence.

1.14.4 Traffic Flow

[Crash rated active vehicle Barriers are to be able to meet the cycle frequency of [_____] vehicles per [hour][day][week][month]. ]Typical vehicle speed over the barrier is expected to be [_____] kph [_____] mph ."

1.14.5 Site Power Supply

Power supply at the site is [[____V] [ _ phase] and is located] as shown on the drawings.

1.14.6 Current Site Conditions

Prepare and submit a report on "Current Site Conditions", within 75 days of Notice to Proceed, to the Government documenting site conditions that significantly differ from the design drawings and include any conditions on the design documents that would negatively affect performance of the system to be installed. Provide specification sheets, or written functional requirements to support the findings, and a cost estimate to correct those site changes or conditions. Do not perform any field work until the "Current Site Conditions" report is approved by the Government.

Do not correct any deficiencies identified in the report without written permission from the Contracting Officer. Review of this package is to be by the designer of record and the local government construction manager.

1.14.7 Generic Design and Contract Revisions

Contract drawings show generic power circuits and voltage configurations for the crash rated active vehicle barriers, sump pumps, heaters, roadway heat tape, and associated. Contractor is responsible for revising the circuit breakers (size and configuration), backup power supplies, conductors and conduit for the specific crash rated active vehicle barrier

SECTION 34 75 13.13 Page 25 system the contractor has chosen. Any changes required are the responsibility of the contractor at no cost to the government. Changes required need to be submitted under the paragraph CONTRACT MODIFICATIONS.

1.15 MAINTENANCE AND SERVICE

1.15.1 Description of Work

The adjustment and repair of the system includes all vehicle barriers and systems installed under this specification. Provide and perform all repair, calibration, and other work in accordance with the manufacturer's documentation and instruction. Responsibility is limited to Contractor installed equipment.

1.15.2 Service Personnel

Certify service personnel in the maintenance and repair of the specific type of equipment installed and qualified to accomplish work promptly and satisfactorily. Advice the Government in writing of the name of the designated service representative, and of any change in personnel.

1.15.3 Schedule of Work

Perform two minor inspections at 6 month intervals (or more often if required by the manufacturer), and two major inspections offset equally between the minor inspections to effect quarterly inspection of alternating magnitude.

1.15.3.1 Minor Inspections

Include visual checks and operational tests of crash rated active vehicle barriers (cleaning pit if necessary), [actuated traffic arms, ]traffic signals, console…

This is the start of the file's text. The full file is on GovTribe.