Requests for Information as of 24 April 2024.pdf

PDF 170 KB Posted

Attached to
TDVG242001 Repair Main Entry Control Point (ECP) Driving Lane Overhang - Alpena CRTC, MI
Solicitation number
W50S8624R0002
Issued by

About this file

This document is a set of Requests for Information (RFIs) pertaining to Solicitation W50S8624R0002 for the repair of the Main Entry Control Point (ECP) driving lane overhang at the Alpena Combat Readiness Training Center (CRTC) in Alpena, Michigan.

The key details are: The solicitation requires the contractor to provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair the existing Main ECP covered drive that was damaged by an oversized vehicle. The project is set-aside for small businesses with a size standard of $19.0M. The NAICS code is 238160 for Sheet Metal Roofing Installation, and the project magnitude is less than $25,000. Proposals are due by 30 April 2024 at 11:00 AM EST. A site visit is highly encouraged on 11 April 2024 at 1:00 PM EST. Award will be made to the most advantageous offeror considering price and non-price related factors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUESTS FOR INFORMATION (RFIs)

W50S8624R0002 – REPAIR MAIN ECP DRIVING LANE OVERHANG, ALPENA CRTC, MI

CURRENT AS OF 12 APRIL 2024

Q1. On page 5, Sec on 1.4, Work Schedule, item B of the specifica ons a ached to the solicita on, it references work to be done at Ba le Creek. I do not see anywhere in any other documents calling out work to be done at Ba le Creek, is this is a misprint?

A1. The Division 1 Specifica ons are a consolidated document for all Michigan Air Na onal Guard

Installa ons and contains standard language. The requirement only involves work at the Alpena Combat

Readiness Training Center (CRTC), in Alpena, Michigan.

Q2. Is it possible to get pictures of the damaged area for a visual scan of the proposed work area to get a be er sense of how far the damage goes for accurate quo ng purposes?

A2. Photos of damage and building have been added to the Pos ng.

Q3. Will this project involve a par al repair of the roof in comple ng the repairs?

A3. The requirement is defined in the Statement of Work.

File details come from the government source that posted it. Updated .