Pre-Proposal Conference Brief - Repair Main ECP Driving Lane - W50S8624R0002.pdf
PDF 313 KB Posted
- Attached to
- TDVG242001 Repair Main Entry Control Point (ECP) Driving Lane Overhang - Alpena CRTC, MI
- Solicitation number
- W50S8624R0002
- Issued by
-
Department of the Army National Guard
About this file
This document is a Pre-Proposal Conference Brief for the federal contract opportunity to Repair the Main Entry Control Point (ECP) Driving Lane Overhang at Alpena CRTC, MI (Solicitation No. W50S8624R0002).
The key details are: The project is a Firm Fixed Price contract set aside 100% for Small Businesses with a NAICS code of 238160 and a size standard of $19.0M. The magnitude of the project is less than $25,000. The period of performance is 180 calendar days after Notice to Proceed. Proposals are due by 30 April 2024 at 11:00 AM EST. The government intends to award without discussions to the responsible offeror whose proposal conforms to the RFP requirements and represents the best value based on technical, past performance, and price factors. A pre-proposal conference was held on 11 April 2024 to provide an overview of the project, proposal requirements, and evaluation criteria.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALPENA CRTC
Pre-Proposal Conference TDVG242001 – Repair Main ECP Overhang
Solicitation No. W50S8624R0002
11 April 2024
Agenda
• Admin Matters/Contact Information
• Process for Questions and Answers (Requests for Information)
• Project Overview
• Notable Items
• Proposal Schedule
• Proposal Requirements and Submission Requirements
• Proposal Evaluation & Award
• Questions
Administrative Matters – Attendance Roster/Contacts
• Ensure you sign the attendance roster
• We plan to post the roster and this presentation on SAM.gov to facilitation communication amongst potential suppliers and subcontractors.
• No other site visits will be granted.
CONTACTS
• Contracting Officer – MSgt Thomas Emery
• Thomas.emery.2@us.af.mil
• Contract Specialist – MSgt Timothy Frasier
• Timothy.frasier@us.af.mil
RFI Process
•Submit questions (Requests for Information) to MSgt Frasier. See Section 00 21 00 for instructions.
•Questions and Answers will be posted on SAM.gov on a non-attributional basis with solicitation at https://sam.gov
•Submit questions not later than the fifth working day prior to solicitation close date.
•Any changes to the drawings, specifications, etc. will be issued in the form of an amendment. However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment.
** DO NOT CONTACT THE COR/PM WITH QUESTIONS. **
Project Overview
Project Title: TDVG242001 – Repair Main Entry Control Point (ECP) Driving Lane Overhang.
Magnitude: Less than $25,000.00
Set Aside: Requirement is set aside 100% for Small Business NAICS: 238160 – Sheet Metal Roofing, Size Standard is $19.0M
A Firm Fixed Price contract will be awarded. The Government intends to make award without discussions.
Period of Performance (PoP): 180 Calendar Days after issuance of Notice to Proceed (NTP)
The Notice to Proceed will be issued after formal approval of any applicable bonds.
Project Overview
Project Requirements Include:
The contractor shall coordinate with COR, (who will communicate with Security Forces) prior to starting work. The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair t he existing Main Entry Control Point (ECP) covered drive outlined in this Statement of Work. The contractor shall perform t he work in accordance with standards specified in the contract.
Notable Items
Brand Name Requirements: N/A
DFARS 252.204-7020 NIST SP 800-171 DoD Assessment Requirements- -Contracting Officer shall verify..... prior to award (DFARS
204.7303 (b)(1))
-Complete the Assessment in the Supplier Performance Risk System (SPRS)
Request the SPRS vendor role: https://piee.eb.mil
SPRS Access and NIST Quick Entry Guide:
https://www.sprs.csd.disa.mil/pdf/NISTSP800-171QuickEntryGuide.pdf
SPRS Frequently Asked Questions:
https://www.sprs.csd.disa.mil/faqs.htm#nist
Proposal Schedule/Info
Solicitation Close is 30 April 2024, 11:00 AM Local Time
Proposal Submission Requirements can be found in section 00 21 00 of the solicitation
Note: The solicitation allows for electronic proposals. Hand carried proposals will be accepted but must be received by the date and time in the solicitation. Delays at the main gate are expected and late proposals may not be considered.
Proposal Preparation Instructions can be found in section 00 21 16 of the solicitation.
OFFERORS ARE STRONGLY CAUTIONED TO READ THE
REQUIREMENTS OF THE SOLICITATION AND COMPLY
ACCORDINGLY. REFER TO THE SOLICITATION AND FAR 13.106-2(b), AND FAR 15 FOR DETAILS.
Proposal Eval & Award
The Government intends to award a single contract to a qualified Small Business Offeror deemed responsible whose proposal conforms to all the RFP's requirements and is judged to represent the Best Value to the Government
Best Value offer will be determined based off the results of the non-priced evaluation factors, past performance, and price evaluation.
The evaluation process will be conducted in accordance with FAR 13.106-2(b).
Evaluation factors for award are:
Technical & Past Performance Price
*SEE SECTION 00 22 16 FOR EVALUATION FACTORS AND
DESCRIPTIONS
Technical – 1 Factor, Construction Schedule/Work Plan
RATING
DescriptionAdjectival RatingColor Rating
Construction Schedule/Work Plan meets requirements and indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low.
OutstandingBlue
Construction Schedule/Work Plan meets requirements and indicates a thorough approach and understanding of the requirements. Proposal contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low.
GoodPurple
Construction Schedule/Work Plan Meets requirements and indicates an adequate approach and understand ng of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate.
AcceptableGreen
Construction Schedule/Work Plan does not clearly meet requirements and has not demonstrated an adequate approach and understanding of the requirements. The proposal has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is high.
MarginalYellow
Construction Schedule/Work Plan does not meet requirements and contains one or more deficiencies. Proposal is not awardable.UnacceptableRed
Past Performance –
IAW FAR 13.106-2(b)(3)(ii), evaluation of past performance will be based on one or more of the following:
The contracting officer’s knowledge; Customer surveys, and past performance questionnaire replies; The Government wide Past Performance Information Retrieval System (PPIRS); or Any other reasonable basis
RATING – Relevant/Not Relevant
RELEVANT: Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
NOT RELEVANT: Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
Price - The proposed price will be evaluated per FAR 13.106-3(a). IAW FAR 4.102.
One copy of the SF 1442 is required to have an original signature. Section 00 10 00 – Insert the price/cost associated with the project in the line items. All line items (CLINs) must be priced.
Questions
Questions will not be answered at the site visit.
Please ensure that the Request for Information process is utilized.