SOW ADDENDUM 01 - TDVG222031 Repair Troop Quarters Roofs.pdf

PDF 93 KB Posted

Attached to
TDVG222031 - Repair Troop Quarters Roofs - Alpena CRTC, MI
Solicitation number
W50S8624B0001
Issued by

About this file

This document is a Statement of Work (SOW) Addendum for the project titled "TDVG222031 Repair Troop Quarters Roofs" at the Alpena Combat Readiness Training Center in Alpena, MI. The addendum revises the original scope of work to focus on repairing the roofs of Buildings 401, 402, and 405 instead of the initial 10 buildings. The contractor is required to provide all necessary personnel, equipment, tools, materials, supervision, and quality control to complete the roof repairs and create complete, operable roof systems for the 3 specified buildings. The work must be performed in accordance with applicable laws, regulations, codes, and specifications. The related federal contract opportunity is a small business set-aside solicitation (W50S86-24-B-0001) with an estimated contract value between $500,000 and $1,000,000. Prospective bidders are encouraged to attend a pre-bid conference and site visit, and bids are due by the date specified in the solicitation.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(CUI)

ADENDEDUM 01

Project Title: Repair Troop Quarters Roofs Project Number: TDVG222031

1.1. Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair Troop Quarters Roofs outlined in this Statement of Work at the Alpena Combat Readiness Training Center; Alpena, MI 49707. The contractor shall perform work in accordance with standards specified in the contract. The Contractor will provide complete repairs to create complete and operable roof systems Buildings 306, 307, 308, 325, 326, 328, 401, 402, 405, and 407.

ADDENDED to 1.1. Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to repair Troop Quarters Roofs outlined in this Statement of Work at the Alpena Combat Readiness Training Center; Alpena, MI 49707. The contractor shall perform work in accordance with standards specified in the contract. The Contractor will provide complete repairs to create complete and operable roof systems Buildings 401, 402, and 405.

1.4.3. Place and Performance of Services: The places of performance are Buildings 306, 307, 308, 325, 326, 328, 401, 402, 405, and 407at the Alpena Combat Readiness Training Center, 5884 A Street, Alpena, MI, 49707.

ADDENDED to 1.4.3. Place and Performance of Services: The places of performance are Buildings 401, 402, and 405 at the Alpena Combat Readiness Training Center, 5884 A Street, Alpena, MI, 49707.

5.1.1. The contractor shall schedule and perform a construction task for the repair the Troop Quarters roofs of Buildings 306, 307, 308, 325, 326, 328, 401, 402, 405, and 407 at the Alpena Combat Readiness Training Center, Alpena, MI. The Contractor will provide complete repairs to create complete and operable roof systems on Buildings 306, 307, 308, 325, 326, 328, 401, 402, 405, and 407 in accordance with the SOW and specifications.

ADDENDED to 5.1.1. The contractor shall schedule and perform a construction task for the repair the Troop Quarters roofs of Buildings 401, 402, and 405 at the Alpena Combat Readiness Training Center, Alpena, MI. The Contractor will provide complete repairs to create complete and operable roof systems on Buildings 401, 402, and 405 in accordance with the SOW and specifications.

5.1.2. The intent of this contract shall be purchasing, delivery, installation, and disposal of building materials to Repair Asphalt Shingle Roofs Troop Quarter Buildings 306, 307, 308, 325, 326, 328, 401, 402, 405, and 407 for the Alpena CRTC. Contractor is responsible for all remaining work effort in order to provide an acceptable final product that meets the requirements of this Statement of Work (SOW). All work performed under this SOW shall be conducted in accordance with the latest applicable state and federal laws, regulations, codes, ANG policies, the latest UFC requirements, and specifications.

ADDENDED to 5.1.2. The intent of this contract shall be purchasing, delivery, installation, and disposal of building materials to Repair Asphalt Shingle Roofs Troop Quarter Buildings 401, 402, and 405 for the Alpena CRTC. Contractor is responsible for all remaining work effort in order to provide an acceptable final product that meets the requirements of this Statement of Work (SOW). All work performed under this SOW shall be conducted in accordance with the latest applicable state and federal laws, regulations, codes, ANG policies, the latest UFC requirements, and specifications.

5.1.2.1. Repair Asphalt Shingle Roofs on Ten (10) troop quarter facilities at the Alpena CRTC. Building 401 is a single wing troop quarter facility with a mechanical room/restroom wing. Building 402 is a single wing troop quarter facility with one (1) vestibule entrance. Buildings 326, 328, 405 are H-Shaped troop quarter facilities with four (4) vestibule entrances. Building 325, 407 are single wing troop quarter facilities with two (2) vestibule entrances and mechanical room/restroom wing. Buildings 306, 307 and 308 are single wing troop quarter facilities with two (2) vestibule entrances. See attached Building Floor Plans.

ADDENDED to 5.1.2.1. Repair Asphalt Shingle Roofs on three (3) troop quarter facilities at the Alpena CRTC. Building 401 is a single wing troop quarter facility with a mechanical room/restroom wing.

Building 402 is a single wing troop quarter facility with one (1) vestibule entrance. Building 405 is a H- Shaped troop quarter facilities with four (4) vestibule entrances. See attached Building Floor Plans.

5.1.2.2. This Project will have one (1) CLIN Base Bid consisting of all ten (10) Buildings.

ADDENDED to 5.1.2.2. This Project will have one (1) CLIN Base Bid consisting of all three (3) Buildings.

5.1.3. The Contractor shall Remove and dispose of existing asphalt shingle roofs at Buildings 306, 307, 308, 325, 326, 328, 401, 402, 405, and 407.

ADDENDED to 5.1.3. The Contractor shall Remove and dispose of existing asphalt shingle roofs at Buildings 401, 402, and 405.

5.1.4. The Contractor shall Remove and dispose of existing shingles, waterproofing underlayment, drip edge, fascia board and aluminum, and soffit at Buildings 306, 307, 308, 325, 326, 328, 401, 402, 405, and 407.

ADDENDED to 5.1.4. The Contractor shall Remove and dispose of existing shingles, waterproofing underlayment, drip edge, fascia board and aluminum, and soffit at Buildings 401, 402, and 405.

End of Addendum