Amendment 01 W50S8524B010.pdf
PDF 186 KB Posted
- Attached to
- VGLZ222007 Install new generator Building 32
- Solicitation number
- W50S8524B0010
About this file
This document is an amendment to a federal solicitation for VGLZ222007 to install a new 300 kW generator at Building 32 at Selfridge Air National Guard Base in Michigan. The key details are:
The solicitation is set aside for 100% small businesses under NAICS code 238210 with a contract value between $250,000 - $500,000. The contract period of performance is 180 calendar days from notice to proceed. The amendment updates the Statement of Work to specify a 300 kW generator, updates the wage determination, and makes no other changes. Proposals are due by the date listed in the solicitation and any amendments. A pre-bid site visit is required. The solicitation and all information on this opportunity will be posted on SAM.gov.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F8Y36P4016A001-0001 VGLZ 222007
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amdendment is to make the follow ing changes in accordance w ith the enclosed "Summary of Changes"
1. Updtate project SOW in regard to paragraph 3 in SOW. The generator is to be 300KW
2. Update the Wage Determination to General Decision Number: MI20240091 07/26/2024
3. There are no other changes and all other terms and conditons shall remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 15
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Aug-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S8524B0010
X 9B. DATED (SEE ITEM 11)
16-Jul-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Aug-2024
CODE
USPFO MI 127 MISSION SUPPORT CONTRACTING
43200 MAPLE ST
SELFRIDGE ANGB MI 48045-5213
W50S85 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S8524B0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been modified:
WAGE DETERMINATION
"General Decision Number: MI20240091 07/26/2024
Superseded General Decision Number: MI20230091
State: Michigan
Construction Type: Building
County: Macomb County in Michigan.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,|
| | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2024 1 01/19/2024 2 04/05/2024 3 05/31/2024 4 07/05/2024 5 07/12/2024 6 07/26/2024
ASBE0025-002 06/01/2023
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 37.98 34.27
BOIL0169-001 01/01/2024
Rates Fringes
BOILERMAKER......................$ 39.65 35.68
BRMI0001-001 06/01/2022
Rates Fringes
BRICKLAYER.......................$ 38.87 25.18
TILE FINISHER....................$ 30.75 22.67
TILE SETTER......................$ 37.88 22.67
CARP0687-003 06/01/2023
Rates Fringes
CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Form Work, Metal
Stud Installation & Scaffold Building)........................$ 40.98 30.22
* CARP1045-001 06/01/2024
Rates Fringes
CARPENTER (Floor Layer - Carpet, Resilient, & Vinyl Flooring)........................$ 34.09 20.81
* CARP1102-002 06/01/2024
Rates Fringes
MILLWRIGHT.......................$ 36.47 40.52
ELEC0058-001 07/21/2022
Rates Fringes
ELECTRICIAN (Low Voltage Wiring and Installation of Alarms) Installer...................$ 30.12 14.57 Technician..................$ 39.33 14.95
ELECTRICIAN......................$ 48.52 26.11
ELEV0036-002 01/01/2024
Rates Fringes
ELEVATOR MECHANIC................$ 62.36 37.885+a+b
FOOTNOTES:
A. PAID HOLIDAYS: New Years Day; Memorial Day; Independence Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
B. Employer contributes 8% basic hourly rate for 5 years or more of service of 6% basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ENGI0324-017 06/01/2024
Rates Fringes
OPERATOR: Power Equipment
GROUP 1....................$ 49.54 25.35
GROUP 2....................$ 48.04 25.35
GROUP 3....................$ 46.54 25.35
GROUP 4....................$ 46.24 25.35
GROUP 5....................$ 45.42 25.35
GROUP 6....................$ 44.56 25.35
GROUP 7....................$ 43.59 25.35
GROUP 8....................$ 41.88 25.35
GROUP 9....................$ 31.79 25.35
FOOTNOTES:
Tower cranes: to be paid the crane operator rate determined by the combined length of the mast and the boom. If the worker must climb 50 ft. or more to the work station, $.25 per hour additional.
Derrick and cranes where the operator must climb 50 ft. or more to the work station, $.25 per hour additional to the applicable crane operator rate.
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Crane with boom and jib or leads 400' or longer
GROUP 2: Crane with boom and jib or leads 300' or longer
GROUP 3: Crane with boom and jib or leads 220' or longer
GROUP 4: Crane with boom and jib or leads 140' or longer
GROUP 5: Crane with boom and jib or leads 120' or longer
GROUP 6: Regular crane operator, and concrete pump with boom operator
GROUP 7: Backhoe/Excavator/Trackhoe, bobcat/skid Loader, broom/sweeper, bulldozer, grader/blade, highlift, hoist, loader, roller, scraper, tractor & trencher
GROUP 8: Forklift & extend-a-boom forklift
GROUP 9: Oiler
IRON0025-019 06/01/2024
Rates Fringes
IRONWORKER
REINFORCING.................$ 33.43 37.15
STRUCTURAL..................$ 35.55 35.83
IRON0025-022 06/01/2022
Rates Fringes
IRONWORKER STRUCTURAL (Metal Building Erection Only)..........$ 25.81 26.43
LABO0259-002 08/01/2023
Rates Fringes
LABORER: Asbestos Abatement (Removal from Floors, Walls & Ceilings)........................$ 34.53 15.47
LABO0334-005 06/01/2024
Rates Fringes
LABORER: Landscape & Irrigation
GROUP 1.....................$ 28.60 11.60
GROUP 2.....................$ 26.34 11.60
CLASSIFICATIONS
GROUP 1: Landscape specialist, including air, gas and diesel equipment operator, lawn sprinkler installer, skidsteer (or equivalent)
GROUP 2: Landscape laborer: small power tool operator, material mover, truck driver and lawn sprinkler installer tender
LABO1191-002 06/01/2024
Rates Fringes
LABORER
Common or General; Grade Checker; Mason Tender - Brick/Cement/Concrete;
Pipelayer; Sandblaster......$ 35.34 17.75
PAIN0022-003 06/01/2022
Rates Fringes
PAINTER: Brush and Roller.......$ 32.85 20.41 PAINTER: Drywall Finishing/Taping.................$ 32.85 20.41 PAINTER: Spray..................$ 26.86 17.66
PAIN0357-002 06/01/2023
Rates Fringes
GLAZIER..........................$ 38.66 20.98
PAID HOLIDAYS: New Year's Day, Decoration Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day;
provided that the employee has worked the last full regular scheduled work day prior to the holiday, and the first full regular scheduled work day following the holiday, provided the employee is physically able to work.
PLAS0067-001 04/01/2014
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 30.63 14.07
PLAS0067-004 04/01/2014
Rates Fringes
PLASTERER........................$ 30.63 14.07
PLUM0098-001 06/01/2023
Rates Fringes
PLUMBER, Excludes HVAC Pipe and Unit Installation............$ 35.79 28.28
PLUM0636-003 06/05/2023
Rates Fringes
PIPEFITTER, Includes HVAC Pipe and Unit Installation.......$ 44.70 35.37
ROOF0149-001 07/01/2021
Rates Fringes
ROOFER...........................$ 38.16 25.91
SFMI0704-001 08/01/2023
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 49.16 32.86
SHEE0080-004 06/01/2024
Rates Fringes
SHEET METAL WORKER (Including HVAC Duct Installation;
Excluding HVAC System Installation)....................$ 42.51 35.77
TEAM0247-002 06/01/2024
Rates Fringes
TRUCK DRIVER
GROUP 1
Dump; Flatbed; Pickup......$ 30.35 0.70+a+b
GROUP 2
Semi.......................$ 30.50 0.70+a+b
GROUP 3
Lowboy.....................$ 30.60 0.70+a+b
PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day. If any of the above holidays fall on a Sunday, the following Monday shall be considered the holiday and, if work is performed, the rate shall be double time.
FOOTNOTE:
a. $456.70 per week, plus $67.10 per day.
* SUMI2011-016 02/01/2011
Rates Fringes
INSTALLER - OVERHEAD DOOR........$ 27.98 0.00
IRONWORKER, ORNAMENTAL...........$ 18.48 7.93
TRUCK DRIVER: Tractor Haul Truck............................$ 13.57 ** 1.18
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
State Adopted Rate Identifiers
Classifications listed under the ""SA"" identifier indicate that the prevailing wage rate set by a state (or local) government was adopted under 29 C.F.R §1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
01/03/2024 reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
SECTION 01 00 00 - GENERAL REQUIREMENTS
The following have been modified:
STATEMENT OF WORK
STATEMENT OF WORK
FOR
VGLZ222007
Install new generator Building 32
Selfridge Air National Guard Base, Michigan
All work described herein shall be performed in fullest compliance with Construction Standard policy of Selfridge ANGB Design Compatibility Guidelines, comply with base standards, latest OSHA, IES, NEC, NEMA, IEEE, UFC and all local rules and regulations for the design and other guidance stated in the following scope of work.
Construction shall be conducted in a quality workmanlike manner. Completed work shall exhibit superior quality for completed work.
To protect workers, contractor work areas shall be isolated and access by Air Force personnel restricted, unless working in conjunction with the contractor. If this is impractical or cannot be accomplished, the on-site supervisor shall assure the contractor‘s compliance with proper work procedures, energy isolation procedures and contractor employee.
The purpose of this Statement of Work (SOW) is to install new 300 kW, 480/277 volt, 3 phase, 4 wire generator, and new 480/277 volt, 3 phase, 4 wire, 4 pole CTTS ATS. The new generator is required for the vital functions of ADAL Bldg. 32.
The Contractor shall obtain field dimensions, equipment materials cost to provide the Government with a complete Cost proposal to perform the required demolition and installation. Contractor is responsible for all materials and labor in order to provide an acceptable final product that meets the requirements of this Statement of Work (SOW) and drawings. All work performed under this SOW shall be conducted in accordance with all applicable state and federal laws, regulations, and codes, ANG policies and regulations, Specifications, and the SOW as outlined below:
The contractor shall coordinate with the COR to de-energize the source of electrical supply and follow all safety lock out and tag out procedure for all electrical work including demolition and new work And perform the following:
1. The contractor shall provide temporary power for the facility for duration of construction to avoid loss of power, notify COR with two (2) weeks’ notice for power interruptions. The shutdown shall occur during the weekend, and it should not be scheduled during a drill weekend. The contractor shall provide all necessary equipment including but not limited to temporary generator(s), fuel, load center, cables, conduits, raceways, disconnects, breakers, etc… for temporary electrical power supply for short term.
Model G981682 Itron Centron Polyphase electric meter (with RF)
2. The contractor shall provide and install new outdoor rain tight, watertight 300 kW, 480/277 volt, 3 ph, 4 W diesel generator with new battery, new battery charger, muffler, new double wall base tank, space heater as required and all required equipment and materials and hardware and software for supplying emergency backup power.
Generator must be EPA certified. The contractor shall provide a copy of the manufacturer EPA certification to the Selfridge Environmental Division Manager. The Contractor shall provide and install minimum 430-gallon double wall above ground base tank sized for at least 24 hours of operation without the need of refueling. Tank must be in accordance with secondary containment requirements (if > greater than 55 gallons), 40 CFR Part 112. The engines for the new emergency generator will need to be certified by the EPA for stationary emergency use in a accordance with the SANGB AQMP. The generator unit engine must be certified by the EPA for the intended use per 40 CFR Part 60.
2.a. Pursuant to 40 CFR Part 60, Subpart IIII, §60.4211(c), "If you are an owner or operator of a 2007 model year and later stationary compression ignition (CI) internal combustion engine and must comply with the emission standards specified [in 40 CFR Part 60, Subpart IIII], , The offerd equipment shall comply these emission standards…."
Similarly, for spark ignition ICOM, pursuant to 40 CFR Part 60, Subpart JJJJ §60.4243(a) "If you are an owner or operator of a stationary spark ignition (SI) internal combustion engine that is manufactured after July 1, 2008, and must comply with the emission standards specified [in 40 CFR Part 60, Subpart JJJJ], All offered equipment shall be certified to this standard.
Manufactures obtain certifications from the EPA. More information is available at the following web site:
https://www.epa.gov/ve-certification Documentation that the engines are certified to operate as stationary emergency power generation must be provided and labeling must be affix to the engines of the stationary emergency generator prior to acceptance:
3. The contractor shall remove the existing metering from the exiting metering compartment and provide and install new 480/277 volt, 3 ph, 4W, 4 pole CTTS (Close Transition Transfer Switch) service entrance rated ATS with maintenance with new multimemters and CTs. in the existing metering compartment in the existing MDP.
4. The contractor shall provide and install generator running alarm and indication and connect to existing Monaco Fire Alarm panel and program the existing Monaco Fire Alarm Panel to send “generator running alarm and indication” signal to the Fire Station. All Fire Alarm work shall be done by Simplex.
5. The Contractor shall deenergize the source of supply, follow safety lock out and tag out procedure per OSHA requirement. The contractor shall provide and install, 600 voltage THHN/THWN copper cables, pull boxes, RGS conduits, EMT conduits PVC conduits and all raceways for all new and existing electrical equipment. All new underground conduits shall be PVC schedule 40 and above ground new conduits shall be rigid galvanized steel. All new conduits inside the building shall be EMT.
6. The contractor/sub and manufacturer shall perform the factory testing of the 300-kW generator, and ATS per UFC, IEEE/ANSI standard. The contractor/sub and manufacturer shall submit the certified test report before shipping generator, and ATS to the site.
7. The contractor shall provide and install grounding including ground wire, and minimum four (4) ground rods (¾” X 10’-0” copper) for the new generator and new ATS and connect it to the existing ground loop per NEC and UFC 3-500-0. The contractor shall test new grounding system and if the ground resistance is higher than NEC requirement, the contractor shall provide and install additional ground rods. The contractor shall submit the certified test report.
8. The contractor/sub/manufacturer shall perform field testing of new 300 kW generator, and new ATS, and all new equipment and materials provided under this contract during the weekend by loading generator for 24 hrs.
The field test shall run minimum one (1) day. The contractor shall submit the certified test report.
9. The Contractor shall provide training for up to 5 individuals from electrical maintenance shop at the project site on each piece of equipment installed on the building system.
10. All electrical work including area classification shall be per National Electrical Code (NEC). The new generator, and new ATS shall be UL listed.
11. The contractor shall provide O & M manuals of Generator, and ATS. in pdf format.
12. APPLICABLE STANDARDS: Latest published versions shall be used.
1. ANGETL 15-01-05, May 2015
2. UFC 3-550-01 – Exterior Electrical Power Distribution
3. National Electric Code, NFPA No. 70
4. National Electric Safety Code (ANSI C2).
5. National Fire Protection Association (NFPA 101) Life Safety Code.
6. IEEE 142 – IEEE Recommended Practice for Grounding Industrial and Commercial Power Systems
7. IEEE 80 – IEEE Guide for Safety in AC Substation Grounding
8. IEEE 81 – IEEE Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Grounding System
9. International Building Code (IBC).
10. Uniform Federal Accessibility Standard (UFAS)
11. Applicable State, City and County codes and regulations.
12. Occupational Safety and Health Administration standards
13. Michigan Occupational Safety and Health Administration standards
14. Hardware and equipment shall be comprised of new products the manufacturer is currently manufacturing, have spare parts available for at least five years after completion of contract.
13. Warranty: Contractor shall provide a one (1) year warranty on workmanship of the entire project in addition to any manufacturer’s warranty on materials installed. The contractor will provide any commercial warranty on materials or equipment included in the construction that exceeds this one-year, all-inclusive warranty.
The commercial warranty will be issued to the Government.
14. Submittals: Material submittals shall be submitted, reviewed, and approved prior to installation. The Government will review the submittals and provide comments/approval within 10 days. All comments shall be addressed prior to beginning work. Also, any shop drawings that are required shall be submitted for Government review. The shop drawings review will be returned to the contractor within 10 days. Refer to AF Form 66 for any additional submittals.
15. There will be a site visit, prior to award to allow for site investigation. Any site visits post award shall be coordinated with the Government.
16. Record drawings may be provided to the contractor as a courtesy at the discretion of the Government, but their accuracy is not guaranteed. The contractor shall do his own field investigations of the utilities and other items in the area and base his work accordingly. The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding, or representation is expressly stated in this contract. These record drawings bear no such representation or understanding.
17. Contractor shall conduct an intensive field survey of all existing conditions. The contractor should survey existing conditions and correlate their work requirements accordingly. Contractor shall verify all dimensions, calculations and code requirements for all elements of work. The contractor is ultimately responsible for constructability and providing a complete and usable product at the completion of the project.
18. The presence of lead on painted surfaces is not expected.
19. Period of Performance shall be 180 calendar days from notice to proceed. The contractor will submit a detailed work schedule prior to construction. Weekend and off shift hours work will be required for this construction and the contractor shall get approval from the contracting officer for dates of feeder shutdowns.
The contractor shall submit to the Contracting Officer a coordinated schedule indicating the sequence of operations for review prior to commencement of the work. The federal holidays are listed below: The contractor shall work on weekend with contracting officer approval and government oversight.
20.
a. January 1st – New Year’s Day
b. Third Monday in January – Martin Luther King Jr. Day
c. Third Monday in February – Washington’s Birthday
d. Last Monday in May – Memorial Day
e. June 19, Juneteenth Day
f. July 4th – Independence Day
g. First Monday In September – Labor Day
h. Second Monday in October – Columbus Day
i. November 11th – Veterans Day
j. Last Thursday in November – Thanksgiving Day
k. December 25th – Christmas Day
21. Life Safety
a. When demolition occurs in or near an occupied space, measures must be taken to protect the indoor air quality, reduce noise, limit vibration from cutting or chopping, reduce odors emanating from demolition debris, and mitigate dust infiltration from airborne particles and foot traffic.
b. Use water mist, temporary enclosures, and other suitable methods to limit dust and dirt rising and scattering in the air. Do not use water when it may damage existing construction or create hazardous or objectionable conditions such as ice, flooding, and pollution. Remove decayed, vermin-infested, or otherwise dangerous or unsuitable materials, and promptly dispose of them off-site. Maintain adequate ventilation when using cutting torches.
c. Avoid unsightly conditions by cleaning adjacent structures and architectural finishes. Eliminate tractable dirt by wet-mopping floors and wiping down walls and doors of the demolition enclosure. Provide walk-off mats from the area of work to prevent dust from being tracked onto adjacent floor finishes. Do not use public corridors, lobbies, or hallways as staging areas. Damage to adjacent construction during demolition must be repaired and restored within 48 hours by the contractor.
22. Locate, identify, disconnect, and seal or cap off any utilities as necessitated by the project. Do not interrupt existing utilities serving occupied or operating facilities unless authorized in writing by the contracting officer.
Arrange to shut off indicated utilities with respective providers. Provide at least 72 hours’ notice to the government if a shutdown of service is required during the changeover. Maintain services to remain and protect them against damage during the project.
23. At the conclusion of the project the Contractor will be responsible to compile and furnish to the Government, DD Form 1354, "TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY”, indicating all costs and quantity data of materials and systems furnished and installed. A draft DD1354 showing a list of items for which the costs and quantity data is required will be furnished to the Contractor.
END OF SOW.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .