04_VGLZ_222007_Form_AF_66_02_01_23.xls
XLS spreadsheet 46 KB Posted
- Attached to
- VGLZ222007 Install new generator Building 32
- Solicitation number
- W50S8524B0010
About this file
This document is a Schedule of Material Submittals (AF Form 66 Modified) for the project titled "Repair Hangar H36" under Solicitation/Contract No. VGLZ 202019. The document lists various items that the contractor must submit for approval, including product specifications, safety data sheets, equipment like diesel generators and automatic transfer switches, electrical components like cables and conduits, and testing reports. The required submittals span categories such as shop drawings, samples, manufacturer's recommendations, warranties, and operating instructions. The contractor must submit these items within 14 days after the Notice to Proceed.
The related federal contract opportunity is for the project "VGLZ222007 Install new generator Building 32", with a Solicitation Number of W50S8524B0010. The contract is a 100% Small Business set-aside with a NAICS code of 238210 - Electrical Contractors and Other Wiring Installation Contractors. The project magnitude is between $250,000-$500,000, and the period of performance is 180 calendar days after Notice to Proceed. Prospective bidders are encouraged to attend a pre-bid conference and site visit. The solicitation and amendments will be posted on SAM.gov, and an original bid bond is required with the bid submission.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| VGLZ 202019 | Repair Hangar H36 | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER
NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||||||||
| APPROVAL | REMARKS | ||||||||||||
| APPROVED | DISAPPROVED | ||||||||||||
| 1 | SANGB Form 23 | ||||||||||||
| 2 | Recycling and Disposal Form | ||||||||||||
| 3 | Affirmative Procurement Reporting Form | ||||||||||||
| 4 | DD Form 1354 | ||||||||||||
| 5 | Product specification cut-sheets | x | X | X | X | X | X | X | X | ||||
| 6 | Product Safety Data Sheets | x | x | x | x | x | x | x | |||||
| 7 | Diesel generator with diesel tank, battery, battery charger,diesel tank | x | x | x | x | x | x | x | x | ||||
| 8 | Automatic transfer switch with maintenance bypass | x | x | x | x | x | x | x | |||||
| 9 | Warranty of work | x | X | ||||||||||
| 10 | 600volt THHN/THWN Copper Cables | x | |||||||||||
| 11 | Pull Boxes, Junction Boxes and all raceways and hardwares | x | x | x | x | x | x | ||||||
| 12 | Grounding system including copper ground rods/copper ground cables | x | x | x | x | x | x | ||||||
| 13 | new power plan | x | |||||||||||
| 14 | new multimeter/ CTs/PTs | x | x | x | x | x | x | ||||||
| 15 | RGS, PVC and EMT conduits, pull boxes, junctionboxes, etc… | x | x | x | x | x | x | ||||||
| 16 | Certified signed field test reports | x | |||||||||||
| 17 | Certified signed factory test reports | x | |||||||||||
| 18 |
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| VGLZ 202019 | Repair Hangar H36 | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||
| APPROVAL | REMARKS | |||||
| APPROVED | DISAPPROVED | |||||
| 1 | ||||||
| 2 | ||||||
| 3 | ||||||
| 4 | ||||||
| 5 | ||||||
| 6 | ||||||
| 7 | ||||||
| 8 | ||||||
| 9 | ||||||
| 10 | ||||||
| 11 | ||||||
| 12 |
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| VGLZ 202019 | Repair Hangar H36 | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | |||||||
| APPROVAL | REMARKS | ||||||||||
| APPROVED | DISAPPROVED | ||||||||||
| 13 | pole riser | x | x | x | x | x | x | ||||
| 14 | insulators | x | x | x | x | x | x | ||||
| 15 | push button | x | x | x | x | x | x | ||||
| 16 | plc programming | ||||||||||
| 17 | arc flash/short ckt/coordination analysis | x | x | x | |||||||
| 18 | lighning arrestors/surge arrestors | x | x | x | x | x | x | ||||
| 19 | surge protection devices | x | x | x | x | x | x | ||||
| 20 | New MCC schedule | x | x | x | x | x | x | ||||
| 21 | New Panels schedule | x | x | x | x | x | x | ||||
| 22 | New control wiring diagrams | x | x | x | x | x | x | ||||
| 23 | |||||||||||
| 24 | |||||||||||
| 25 | |||||||||||
| 26 | |||||||||||
| 27 | |||||||||||
| 28 | |||||||||||
| 29 | |||||||||||
| 30 |
| SCHEDULE OF MATERIAL SUBMITTALS | ||||||||||||||||
| (AF Form 66 Modified) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||
| VGLZ 202019 | Repair Hangar H36 | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | ||||||||||||||||
| NO. OF COPIES REQUIRED | ||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE AND CLOSEOUT | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATIONS | MANUFACTURER'S WARRANTY | CATALOG DATA | OTHER MATERIAL or DATA | OPERATING INSTRUCTIONS | SUBMITTAL |
REQUIRED
BY 14 DAYS
AFTER NTP DATE
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGINEERING RETURN
SUSPENSION
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||
| APPROVAL | REMARKS | |||||
| APPROVED | DISAPPROVED | |||||
| 13 | ||||||
| 14 | ||||||
| 15 | ||||||
| 16 | ||||||
| 17 | ||||||
| 18 | ||||||
| 19 | ||||||
| 20 | ||||||
| 21 | ||||||
| 22 | ||||||
| 23 | ||||||
| 24 | ||||||
| 25 | ||||||
| 26 | ||||||
| 27 | ||||||
| 28 | ||||||
| 29 | ||||||
| 30 |
File details come from the government source that posted it. Updated .