This document is an amendment to a solicitation for replacement of light fixtures in Building 825 at Selfridge Air National Guard Base. The amendment incorporates Addendum 01 to update the statement of work and drawing, and adds the wage determination from General Decision Number MI20210091 dated August 20, 2021. The project involves removing existing light fixtures and installing new high-efficiency LED fixtures in specified areas of the building, reusing existing lighting controls and occupancy sensors. Work will be conducted in construction line item numbers by area and must be completed within one year. The contractor must comply with all applicable regulations and standards and provide operation and maintenance documentation and a one-year warranty upon completion.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F8Y36P1140AW01

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to make the follow ing changes in accordance w ith the enclosed Summary of Changes:

Incorporate Addendum 01 into the Statement of Work to include the revised draw ing: CLIN MAP 01 Amended.

Incorporate General Decision Number: MI20210091 08/20/2021 into the terms and conditions of this solicitation and any subsequent contract.

There are no other changes and all other terms and conditions shall remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 20

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Aug-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S8521B0014

X 9B. DATED (SEE ITEM 11)

10-Aug-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Aug-2021

CODE

USPFO MI 127 MISSION SUPPORT CONTRACTING

43200 MAPLE ST

SELFRIDGE ANGB MI 48045-5213

W50S85 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S8521B0014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The following have been modified:

SECTION 00010 NOTES

SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK SECTION 00010 - BID SCHEDULE, NOTES

SECTION 00100 - INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

SECTION 00600 – REPRESENTATIONS & CERTIFICATIONS

SECTION 00700 - CONTRACT CLAUSES

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

ATTACHMENT 1 – “SOW Building 825 Lighting Project” ATTACHMENT 3- “04 - AF Form 66 – Repair B 825 Lighting” ATTACHMENT 3- “02-Michigan National Guard Construction Division 01 Specifications” ATTACHMENT 4: CLIN MAP 01 Amended

All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://www.SAM.gov.

1. Facsimile transmission of bid is not authorized. Electronic submission, to include emailing of bids, will

NOT

be accepted.

2. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://www.SAM.gov. For security reasons, all potential offerors, plan rooms and printing companies are required to be registered in the GSA System for Award Management (SAM) database. Firms can register via the SAM internet site at https://www.sam.gov/portal/public/SAM/. Interested bidders are required to submit their representations and certifications at the same site.

3. A complete bid package must contain the following:

(a) Offer, Standard Form (SF) 1442 front and back signed

(b) Section 00010 Line Items- all items must be priced

(c) A Bid Bond and Power of Attorney is required along with the bid on the due date.

A copy of the bond and POA may be submitted with the proposal, with the original signed copy with Seal to be submitted WITH THE BID. The bid bond must be on a SF24 form. Rejection of a bid bond shall be in accordance with FAR 28.101-4 Noncompliance with bid guarantee requirements.

(d) Section 00600, Representations and Certifications, completed and return only additional certifications found in this section In addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications at www.sam.gov.

(e) When completing the “Offeror” portion of the SF 1442 (Blocks 14 – 20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102. One copy of the SF1442 is required to have an original signature.

(f) All amendments to the solicitation must be acknowledged.

(g) Mark the front of the envelope with the following: “BID No. W50S85-21-B-0014 REPLACE LIGHTS BUILDING 825”, and the Name and Address of Bidder. See Block 13A of SF 1442 for required number of copies.

4. Joint Venture Requirements - Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with FAR 4.102(d). Each joint venture partner shall submit evidence satisfactory to the Contracting Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the System for Award Management (SAM) database.

Applicable to set-aside solicitations: Joint Ventures must meet applicable size standards (See FAR Subpart 19.1).

Submit with the proposal any size determination for the Joint Venture entity received from the Small Business Administration. A Joint Venture where-in one party is not a small business may be referred to the Small Business Administration ( IAW FAR 19.302 (b)) to determine eligibility. All questions regarding Joint Ventures must be directed to the Small Business Administration (SBA) and not the Contracting Officer.

SECTION 00700 - CONTRACT CLAUSES

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

ATTACHMENT 1 – “SOW Building 825 Lighting Project” ATTACHMENT 3‐ “04 ‐ AF Form 66 – Repair B 825 Lighting” ATTACHMENT 3‐ “02‐Michigan National Guard Construction Division 01 Specifications” ATTACHMENT 4: CLIN MAP 01 Amended

(End of clause)

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

STATEMENT OF WORK

Addendum 01

For

Replace Lights Building 825 Selfridge Air National Guard Base, Michigan

1. Replace CLIN MAP 00 with CLIN MAP 01 – As revised for clarity on Area 5 and Area 6.

2. Refer to RFI 01 with answers to (7) specific questions. Please incorporate these specific RFI answers into the scope of work for this project. See Below:

RFI 01- REPONSES

1) The updated drawing does not show Area 6 but it shows two Area 5's.

Answer: The area 5 that is between area's 1 and 7 should not be included in the work (the mechanical & main electrical room lights are not being replaced). The other area 5 between area's 4 and 9 on the original CLIN map should have been labeled "Area 6" and is shown correctly on the amended CLIN Map for building 825.

2) Are you aware if any of the fixtures in the scope, share a ballast?

Answer: Please refer to the lighting schedule document as we are not aware of any shared ballast. All new light fixtures being installed shall be LED.

3) SF 1442, CLIN 1 does not mention any areas, however on page 4 of the SOW, it explicitly states Areas 1, 2, and 3. Please clarify if the two CLIN's are the same.

Answer: The two CLIN 1's are the same areas of 1, 2, and 3. Page 4 of the SOW does list the areas as 1, 2, and 3 but it was left off the SF1442.

4) According to SOW page 5 item 7, we are to maintain the existing controls. If the existing levels are achieved by alternating fixtures that turn on and off together (checkerboard pattern) then this is possible. However if different lamp groups turn on within the same fixture (AB switching) then it is not possible with LED fixtures.

Please clarify which one of the two schemes you currently use for achieving two light levels you.

Answer: The alternating fixtures that turn on and off together (checkerboard pattern) would be acceptable but please plan for 60/ 40 split of light fixtures for the training rooms for presentations (with the lights off in front of the projector screens for the 40 split).

5) What is the height of the highest ceiling in the scope?

Answer: The Atrium area has light fixtures at the 13 feet to 15 feet level. The rest of the building lighting is at the 9 to 10 feet drop ceiling level.

6) Especially in the mechanical rooms, are any of the fixtures blocked by equipment installed afterwards?

Answer: The mechanical room lights in area 5 are not being replaced. There are other areas that have cubicles or dental chairs/ equipment and other trade fixtures that will have to be worked around. Other material on a limited basis will be moved by medical staff with proper notice (at least 3 weeks) subject to approval of the building manager otherwise it will be the contractor's responsibility to work around installed equipment and provide protective covering of equipment.

7) Can the base provide temporary storage for the materials delivered and removed during construction?

There is very limited area in the building for storage of materials and the contractor will be required to receive and store materials. Selfridge can provide a laydown area in the parking lot for the contractor's storage unit(s). The old light fixtures once taken down should not be stored in the building and the work to properly separate the hazardous material in the old light fixtures shall not be done in the building.

STATEMENT OF WORK

For

Replace Lights Building 825 Selfridge Air National Guard Base, Michigan

All work described herein shall be performed in the fullest compliance with the construction standard policy of the Selfridge Air National Guard Base (SANG Base), latest OSHA, NEC, NEMA, IEEE, UFC, General Specifications and Selfridge Design Standards and all other rules and regulations for the design and other guidance stated in the following scope of work. The construction shall be conducted in a quality workmanlike manner. The completed work shall exhibit superior quality and have a finished look.

The contractor shall schedule and perform a construction task for the replacement existing lighting fixtures in selected areas on the interior of building 825 at the Selfridge Air National Guard Base, Harrison Twp. MI. The pricing for this contract will be submitted in the CLINs as specified and

The Contractor will provide a complete and operable LED lighting system retrofit at Building 825 reusing existing lighting controls and occupancy sensors. The replacement light fixtures will need to consist of various types and sizes and all shall be high efficiency LED type fixtures. The design basis for these lights shall be direct replacement of existing light fixtures. The project shall include but is not limited to removing old light fixtures, properly disposing of old light fixtures according to Selfridge Environmental Standards, installing new high efficiency LED light fixtures, properly install all lighting controls and occupancy sensors. The work will require some minor electrical wiring modifications.

To protect workers, contractor work areas shall be isolated and access by Air Force personnel restricted. The contractor’s on-site supervisor shall be responsible for all safety procedures and assure the contractor‘s compliance with proper work procedures, energy isolation procedures and contractor employee compliance per AFMAN 91- 203, para 21.8.3. When contractor personnel are engaged in activities covered by this instruction (AFMAN 91-203), the on-site supervisor and contractor shall inform each other of their respective lockout/tag out procedures. The on-site supervisor shall ensure his/her personnel understand and comply with the contractor‘s energy control procedures. Air Force and contractor personnel conducting joint lockout/ tag out operations shall use requirements in this standard AFMAN 91-203, para 21.8.

All existing fluorescent, high pressure sodium, and incandescent light fixtures as specified in the areas of this SOW of building 825 will be replaced, with the exclusion of all exit signs and all wall mounted emergency light packs.

This will require the contractor to accurately survey all existing fixtures in the specified areas of building 825. This will require some lighting and electrical wiring modifications. Existing lights with 2 light switches (for two level brightness) will need to be replaced with high efficiency LED light fixtures that can accommodate two level brightness using existing wiring and controls.

The Contractor shall obtain all lighting fixture counts, field dimensions, equipment and materials to provide the Government with a complete plan to perform the required LED replacement work. The contractor shall submit plans to de-energize the source of electrical supply and follow all OSHA safety lock out and tag out procedure for all electric work. The contractor shall coordinate with the customer and request the power outage time and date in advance. The contractor shall take all precautions and follow all OSHA safety lock out and tag out procedures for the areas of work.

The (POP) period of performance shall be (365) days. The contractor will submit a detailed work schedule prior to construction that documents the completion in (365) working days or less within (4) weeks of the contract NTP.

Weekend and off shift hours work may be required for this construction but is not preferred.

Selfridge will provide building 825 existing lighting floor plan and the existing luminaire schedule but the contractor will be responsible to verify the accuracy of the documents.

The existing lights inside and outside of building 825 will be demoed and the new LED light fixtures will be installed in approximately the same position of the existing light fixtures. Light fixtures may be relocated slightly to avoid any obstructions in the ceiling area. This work might require some finishing work for canister lights and other lighting fixtures.

Installation drawings and design drawings are NOT provided for this installation work. The contractor and any subcontractors will perform site visits and site assessments prior to bidding and construction to cover all cost of building 825 lighting replacements and installation. The contractor is responsible for a complete assessment of all site conditions prior to bids and all cost will be included in the bid.

Scheduling for demolition and replacement of the light fixtures in specific areas of the building will be approved by the KO/COR to impact building operation as little as possible. New light fixture installation phasing plans will need to be scheduled with approval by the KO/COR. The contractor will submit phasing plans for approval prior to any construction. Work will be required to be scheduled and completed within the period of performance.

The installation work will be routinely inspected by the 127 CES for quality management and for safety. Any deficiencies will be addressed by the contractor as they occur. A final punch list will also be generated by the COR.

The contractor shall remove the electrical fixtures and components, and dispose and/or recycle per federal, state, and local policies. Solid waste, universal waste, and hazardous waste disposal fees, sampling activities, and/or laboratory analytical requirements are at cost to the Contractor. All hazardous waste generated from the project shall be disposed offsite. The contractor shall make the COR aware of all hazardous waste through the Hazmat disclosure process and provide all required documentation. Recycle all fluorescent lamps, HID lamps, mercury (Hg) -containing thermostats and ampoules, and PCBs-containing ballasts and electrical components as directed. Do not crush lamps on site as this creates a hazardous waste stream with additional handling requirements.

Contractor is responsible for all work effort in order to provide an acceptable final product that meets the requirements of the original system, the drawings and this Statement of Work (SOW). The LED lighting replacement project will meet design intent of the lighting system for the building. All work performed under this SOW shall be conducted in accordance with all applicable local, state and federal laws, regulations, and codes, ANG policies and regulations, Selfridge Base Standards, and the SOW as outlined below:

1. The contractor will provide bid and cost data per Contract Line Item Number (CLIN) as specified by the SOW. Contract Line Item Number (CLIN) Items areas of this SOW are as follows:

CLIN 1 - Areas 1, 2 and 3 of the included CLIN Area drawing. CLIN 2 - Areas 7, 8 and 9 of the included CLIN Area drawing. CLIN 3 - Areas 4 of the included CLIN Area drawing.

CLIN 4 - Areas 6 of the included CLIN Area drawing.

2. The tasks of this SOW are:

Part A- Demo and Replace Building 825 - Inside Light Fixtures

1. The contractor will provide and execute and plan for demolition and replacement of the existing lighting fixtures as specified by the (4) CLIN items in building 825. The contractor will provide replacement plan and phasing of replacements for each of the CLIN items area light fixtures that will be approved by the KO/COR to impact building operation as little as possible in those areas. This work will be coordinated with the building occupants.

2. The contractor will NOT replace any wall side mounted emergency backup lights or and exit signs. The contractor will not replace and lights in the mechanical, electrical or comms rooms. For CLIN Item 01 the contractor will not replace the 16’-0” long hanging lights in the atrium area.

3. The replacement high efficiency LED light fixtures will need to be UL certified and comply with the Made in America Act. All LED replacement light fixtures will submitted and be subject to approval of the KO/COR. It is preferred that there be a minimum number of types of light fixtures and the flat panel design is the preferred design type.

4. The work (existing light fixture removal and new LED light fixture installation) will be completed in sections or zones with the schedule subject to approval of building occupants and KO/COR.

5. The quantity of battery back-up lights will be REDUCED from the original plan for the building. Battery backup lights will only be installed in the hallways and other rooms as a minimum for emergency egress path illumination per the code requirements. Some battery backup lights in halls offices and classrooms will be replaced with standard powered fixtures.

6. All new LED light fixtures installation will have a finished look and function with the existing controls. No damage is expected but any ceiling, ceiling tiles, wall, or drywall issues due to installation will be repaired by the contractor.

7. Minor electrical wiring modifications will or may need to be completed to ensure the building inside lights work with existing lighting controls and occupancy sensors. Existing lights with 2 light switches (for two level brightness) will need to be replaced with high efficiency LED light fixtures that can accommodate two level brightness using existing wiring and controls.

8. All above-mentioned work will be required to follow the latest edition of the National Electric Code, UFC, IEEE, NETA, and NFPA.

9. The contractor shall provide and approved plan to de-energize the source of electrical supply and follow all

OSHA safety lock out and tag out procedure for all electric work.

10. Work will be completed safely with proper equipment with staff being trained to inspect and use equipment safely. All MIOSHA and OSHA standards will be followed. The contractor will submit a safety plan for the work prior to the start of work.

11. Work zones will be cordoned off and secured to prevent building occupants or anyone else from walking into the work zones.

12. Contractor is responsible for the proper disposal of the demoed light fixtures and will track the light bulbs, batteries, and ballasts as solid waste as required from the Selfridge ANG Base Environmental Engineering Department. Contact is Mary Perkins

13. The installation work will be routinely inspected by the 127 CES for quality management and for safety.

Any deficiencies will be addressed by the contractor as they occur. A final punch list will also be generated by the

COR.

14. All new LED light fixtures installation will have a finished look and function with the existing controls. No damage is expected but any ceiling, ceiling tiles, wall, or drywall issues due to installation will be repaired by the contractor.

3. General Repair guidelines include, but are not limited to the following specifications and regulations:

1. Unified Facilities Criterion for DOD construction.

2. APPLICABLE STANDARDS: Latest published versions shall be used.

3. Mechanical systems – ASHRAE and SMACNA Standards, Including ASHRAE 90.1.

4. National Electric Code, NFPA No. 70

5. National Electric Safety Code (ANSI C2).

6. National Fire Protection Association (NFPA 101) Life Safety Code.

7. International Building Code (IBC).

8. Uniform Federal Accessibility Standard (UFAS)

9. International Mechanical Code (IMC).

10. International Plumbing Code (IPC).

11. Applicable State, City and County codes and regulations.

12. ANG Design Policy -Tab D, ANG ETL 01-1, Jan 2003 (Revised March 2004)

13. Selfridge ANG Base Design Standards

14. Occupational Safety and Health Administration standards

15. Michigan Occupational Safety and Health Administration Standards

4. Drawings and or stamped drawings by a Professional Engineer (P.E.) or a Registered Architect (R.A.) are not required for this project.

5. Electrical inspection is required of the completed system and the installation will be compliant with the Electrical Code. The contractor will promptly correct any deficiencies found in the inspection at no added cost.

6. All hardware and equipment shall be comprised of new products based on what the manufacturer is currently manufacturing and have a spare parts pipeline available for at least five years after completion of contract.

7. Operation and Maintenance Manuals shall be provided, to include (but not limited to) spare parts list, operator’s manual, and contractors’ contact information and preventative maintenance schedules and recommendations. The contractor will include 3 binders to contain all the information/ warranties and one electronic copy.

8. Warranty: Contractor shall provide a one year warranty on workmanship of the entire construction project in addition to any manufacturer’s warranty on materials installed. The contractor will provide any commercial warranty on materials or equipment included in the construction that exceeds this one-year, all-inclusive warranty.

The commercial warranty will be issued to the Government.

9. Submittals: Material submittals shall be submitted, reviewed, and approved prior to installation. The Government will review the submittals and provide comments/approval within 14 days. All comments shall be addressed prior to beginning construction. Also, any shop drawings that are required shall be submitted for Government review. The shop drawings review will be returned to the contractor within 14 days. Refer to AF Form 66 for any additional submittals.

10. There will be a site visit, prior to award to allow for site investigation. Any site visits post award shall be coordinated with the Government.

11. Record and or design drawings may be provided to the contractor as a courtesy at the discretion of the Government, but their accuracy is not guaranteed. The contractor shall do his own field investigations of the utilities and other items in the area and base his work accordingly. The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government.

Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract. These record drawings bear no such representation or understanding.

12. Contractor shall conduct an intensive field survey of all existing conditions. The contractor should survey existing conditions and correlate their work requirements accordingly. Contractor shall verify all dimensions, calculations and code requirements for all elements of work. The contractor is ultimately responsible for constructability and providing a complete and usable product at the completion of the project.

13. The disturbance of Asbestos-Containing Building Material (ACBM) is not anticipated during this project.

However, if suspected ACBM is encountered, work in the immediate vicinity must stop and the Contracting Officer (CO) notified. After consultation with base personnel, the CO will direct further action to be taken. Work should proceed uninterrupted in unaffected areas of the project.

14. Based on the age of the buildings at Selfridge ANG Base, there is the potential for the presence of lead on painted surfaces. Best management practices must be employed to minimize dust and adequately protect workers from LBP exposure in accordance with OSHA and MIOSHA standards.)

15. The contractor shall submit to the Contracting Officer a coordinated schedule indicating the sequence of operations for review prior to commencement of the work. Currently base is open from Monday thru Friday 0630- 1700 only. Any work outside these hours and on Federal Holidays must be requested at least 72 business hours in advance and then approved by the contracting officer. The federal holidays are listed below:

1. January 1st – New Year’s Day

2. Third Monday in January – Martin Luther King Jr. Day

3. Third Monday in February – Washington’s Birthday

4. Last Monday in May – Memorial Day

5. June 19-Juneteenth National Holiday

6. July 4th – Independence Day

7. First Monday In September – Labor Day

8. Second Monday in October – Columbus Day

9. November 11th – Veterans Day

10. Last Thursday in November – Thanksgiving Day

11. December 25th – Christmas Day

16. The facility will be occupied during this project. The Contractor shall fully cooperate with the other contractors and with Government employees and shall carefully adapt scheduling and performing the work under this contract to accommodate the additional work (of others), heeding any direction that may be provided by the Contracting Officer. The Contractor shall not commit or permit any act that will interfere with the performance of work by any other contractor or by Government employees.

17. Temporary utilities (power, and lighting) will be required to support building use and functions during this project.

18. Egress: Do not close or obstruct walkways, corridors, or other occupied facilities without written permission from the contracting officer.

19. Life Safety

1. The contractor will have a safety official and will submit a safety plan prior to construction and that safety plan will be modified as required by the contractor to ensure safety of all workers and building occupants.

2. When demolition occurs in or near an occupied space, measures must be taken to protect the indoor air quality, reduce noise, limit vibration from cutting or chopping, reduce odors emanating from demolition debris, and mitigate dust infiltration from airborne particles and foot traffic.

3. Use water mist, temporary enclosures, and other suitable methods to limit dust and dirt rising and scattering in the air. Do not use water when it may damage existing construction or create hazardous or objectionable conditions such as ice, flooding, and pollution. Remove decayed, vermin- infested, or otherwise dangerous or unsuitable materials, and promptly dispose of them off-site. Maintain adequate ventilation when using cutting torches.

4. Avoid unsightly conditions by cleaning adjacent structures and architectural finishes. Eliminate tractable dirt by wet-mopping floors and wiping down walls and doors of the demolition enclosure. Provide walk- off mats from the area of work to prevent dust from being tracked onto adjacent floor finishes. Do not use public corridors, lobbies, or hallways as staging areas. Damage to adjacent construction during demolition must be repaired and restored within 48 hours by the contractor.

20. Locate, identify, disconnect, and seal or cap off any utilities as necessitated by the project. Do not interrupt existing utilities serving occupied or operating facilities unless authorized in writing by the contracting officer.

Arrange to shut off indicated utilities with respective providers. Provide at least 72 hours’ notice to the government if a shutdown of service is required during the changeover. Maintain services to remain and protect them against damage during the project.

21. At the conclusion of the project the Contractor will be responsible to compile and furnish to the Government, DD Form 1354, "TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY”, indicating all costs and quantity data of materials and systems furnished and installed. A draft DD1354 showing a list of items for which the costs and quantity data is required will be furnished to the Contractor.

WAGE DETERMINATION

"General Decision Number: MI20210091 08/20/2021

Superseded General Decision Number: MI20200091

State: Michigan

Construction Type: Building

County: Macomb County in Michigan.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.95 for calendar year 2021 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.95 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2021. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/01/2021 1 01/15/2021 2 01/29/2021 3 02/26/2021 4 04/30/2021 5 07/02/2021 6 08/13/2021 7 08/20/2021

ASBE0025-002 06/01/2021

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR........................$ 35.41 32.91

BOIL0169-001 03/01/2018

Rates Fringes

BOILERMAKER......................$ 38.65 26.22

BRMI0001-001 06/01/2020

Rates Fringes

BRICKLAYER.......................$ 36.24 22.74

TILE FINISHER....................$ 28.58 20.45

TILE SETTER......................$ 35.71 20.45

CARP0687-003 06/01/2020

Rates Fringes

CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Form Work, Metal Stud Installation & Scaffold Building)........................$ 34.20 28.82

CARP1045-001 06/01/2020

Rates Fringes

CARPENTER (Floor Layer - Carpet, Resilient, & Vinyl

Flooring)........................$ 30.60 24.58

CARP1102-002 06/01/2020

Rates Fringes

MILLWRIGHT.......................$ 35.30 34.10

* ELEC0058-001 07/21/2021

Rates Fringes

ELECTRICIAN (Low Voltage Wiring and Installation of Alarms) Installer...................$ 30.12 14.57 Technician..................$ 37.62 14.80

ELECTRICIAN......................$ 45.17 26.01

ELEV0036-002 01/01/2021

Rates Fringes

ELEVATOR MECHANIC................$ 55.46 36.365+a+b

ENGI0324-017 06/01/2020

Rates Fringes

OPERATOR: Power Equipment

GROUP 1....................$ 42.69 24.95

GROUP 2....................$ 41.19 24.95

GROUP 3....................$ 39.69 24.95

GROUP 4....................$ 39.39 24.95

GROUP 5....................$ 38.57 24.95

GROUP 6....................$ 37.71 24.95

GROUP 7....................$ 36.74 24.95

GROUP 8....................$ 35.03 24.95

GROUP 9....................$ 26.69 24.95

FOOTNOTES:

Tower cranes: to be paid the crane operator rate determined by the combined length of the mast and the boom. If the worker must climb 50 ft. or more to the work station, $.25 per hour additional.

Derrick and cranes where the operator must climb 50 ft. or more to the work station, $.25 per hour additional to the applicable crane operator rate.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Crane with boom and jib or leads 400' or longer

GROUP 2: Crane with boom and jib or leads 300' or longer

GROUP 3: Crane with boom and jib or leads 220' or longer

GROUP 4: Crane with boom and jib or leads 140' or longer

GROUP 5: Crane with boom and jib or leads 120' or longer

GROUP 6: Regular crane operator, and concrete pump with boom operator

GROUP 7: Backhoe/Excavator/Trackhoe, bobcat/skid Loader, broom/sweeper, bulldozer, grader/blade, highlift, hoist, loader, roller, scraper, tractor & trencher

GROUP 8: Forklift & extend-a-boom forklift

GROUP 9: Oiler

IRON0025-019 06/01/2019

Rates Fringes

IRONWORKER

REINFORCING.................$ 30.98 27.99

STRUCTURAL..................$ 36.77 29.03

IRON0025-022 06/01/2019

Rates Fringes

IRONWORKER STRUCTURAL (Metal Building Erection Only)..........$ 36.77 29.03

LABO0259-002 08/01/2019

Rates Fringes

LABORER: Asbestos Abatement (Removal from Floors, Walls & Ceilings)........................$ 29.03 12.92

LABO0334-005 06/01/2019

Rates Fringes

LABORER: Landscape & Irrigation

GROUP 1.....................$ 20.75 7.10

GROUP 2.....................$ 18.75 7.10

CLASSIFICATIONS

GROUP 1: Landscape specialist, including air, gas and diesel equipment operator, lawn sprinkler installer, skidsteer (or equivalent)

GROUP 2: Landscape laborer: small power tool operator, material mover, truck driver and lawn sprinkler installer tender

LABO1191-002 06/01/2019

Rates Fringes

LABORER

Common or General; Grade Checker; Mason Tender - Brick/Cement/Concrete;

Pipelayer; Sandblaster......$ 28.55 16.85

PAIN0022-003 06/01/2015

Rates Fringes

PAINTER: Brush and Roller.......$ 26.06 17.66 PAINTER: Drywall Finishing/Taping.................$ 27.05 18.26 PAINTER: Spray..................$ 26.86 17.66

PAIN0357-002 06/01/2020

Rates Fringes

GLAZIER..........................$ 34.10 21.46

PAID HOLIDAYS: New Year's Day, Decoration Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day;

provided that the employee has worked the last full regular scheduled work day prior to the holiday, and the first full regular scheduled work day following the holiday, provided the employee is physically able to work.

PLAS0067-001 04/01/2014

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 30.63 14.07

PLAS0067-004 04/01/2014

Rates Fringes

PLASTERER........................$ 30.63 14.07

PLUM0098-001 06/01/2019

Rates Fringes

PLUMBER, Excludes HVAC Pipe and Unit Installation............$ 37.74 34.13

PLUM0636-003 06/05/2017

Rates Fringes

PIPEFITTER, Includes HVAC Pipe and Unit Installation.......$ 40.41 29.35

ROOF0149-001 07/01/2020

Rates Fringes

ROOFER...........................$ 36.97 24.93

SFMI0704-001 08/01/2021

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 45.19 30.65

SHEE0080-004 06/01/2020

Rates Fringes

SHEET METAL WORKER (Including HVAC Duct Installation;

Excluding HVAC System Installation)....................$ 44.13 26.27

TEAM0247-002 06/01/2018

Rates Fringes

TRUCK DRIVER

GROUP 1

Dump; Flatbed; Pickup......$ 26.71 0.70+a

GROUP 2

Semi.......................$ 26.86 0.70+a

GROUP 3

Lowboy.....................$ 26.96 0.70+a

PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day. If any of the above holidays fall on a Sunday, the following Monday shall be considered the holiday and, if work is performed, the rate shall be double time.

FOOTNOTE:

a. $456.70 per week, plus $67.10 per day.

SUMI2011-016 02/01/2011

Rates Fringes

INSTALLER - OVERHEAD DOOR........$ 27.98 0.00

IRONWORKER, ORNAMENTAL...........$ 18.48 7.93

TRUCK DRIVER: Tractor Haul Truck............................$ 13.57 1.18

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

(End of Summary of Changes)