RFI Building 119_31 Aug 22.docx

DOCX document 25 KB Posted

Attached to
Building 119 Renovation
Solicitation number
W50S7Z--B-0002
Issued by

About this file

This document contains a request for information (RFI) regarding a building renovation project and related federal contract opportunity. The RFI seeks clarification on lighting fixture installation details, sizing requirements for electrical equipment, and specifications for lighting controls and contactors. Additional documents were provided on separate dates to supplement the original solicitation but did not constitute formal amendments. The related federal contract opportunity is for the Building 119 Renovation project located at a Louisiana Army National Guard facility. The project value is estimated between $1-5 million. The requirement has a 100% set-aside for small businesses with a size standard of $39.5 million. Responses are due September 9th, 2022 at 10:00am CST. The NAICS code is 236220 and site visits were encouraged for August 12th.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

· Drawing E-101 keynote 2 and 3 calls for light fixture type P and PE to be mount at different elevation. Luminaire schedule on drawing E-611 call for the P and PE to me mounted at 13-foot 4-inch AFF. Which is the correct mounting height for the P and PE light fixtures?

Schedule calls “PENDANT, MT 13'-4'' AFF, UIO”. If the room has no keynote the mounting height is what is listed in the schedule. If it has a keynote with a different height, mount to that.

· Drawing E-101 the type V wall mounted light fixture in restroom There no luminaire requirements requirement shown in drawing. Please provide the luminaire for type V light fixture.

Vanity Fixture Basis of Design:

1. HOUSING, FINISH & REFLECTORS - - BRUSHED NICKEL HOUSING WITH SQUARE ACRYLIC DIFFUSER.

2. LAMPS - LED LAMP TO HAVE 3000K KELVIN COLOR TEMPERATURE OF LIGHT WITH A CRI OF 80 OR GREATER AND AN L70 OF 50,000 HOURS OR GREATER PRODUCING 1300 LUMENS.

3. DRIVER - LED DRIVER TO BE 277 VOLT. FIXTURE TO HAVE A DIGITALLY ADDRESSABLE DRIVER AND/OR LOW VOLTAGE DIGITAL ADDRESSABLE CONTROL DEVICE.

4. CERTIFICATION - UL LISTED FOR DAMP LOCATION SPACE.

5. WARRANTY - PROVIDE A MINIMUM 10-YEAR WARRANTY BY MANUFACTURER.

6. FIXTURE TYPE -TYPE ' V ‘- 1300 LUMENS, 2’ VANITY

· Drawing ES 101 detail B4 is showing a wire gutter to be install on top of the MDP for the service entrance conductors. There six additional feeders for panelboard and transform that must enter the top of the MDP. What size wire gutter is required to accommodate the service entrance conductors and feeders?

Service entrance laterals must be in their own raceway.

· Drawing E-402 key note 8 is calling for providing external power interrupter for under-voltage. The no information provided on the drawings or specification provided for external power interrupter for under-voltage. Please all information required to include manufactures, voltage and amperage for the external power interrupter for under-voltage?

Provide an external power interrupter that meets the requirements of equipment.

· Drawing E-601 electric one line for transformer T-NP3 is showing a 350-line load breaker ahead of the transformer and 150amp on the secondary side of the transformer feeding panelboard NP3B. Is this correct? Or should the 150amp breaker be ahead of the 112.5kva transformer and the 350amp breaker be on the secondary side of the transformer feeding both panelboard NP3A and NP3B?

Refer to NP4C for primary side breaker size. Secondary side is double tapped to feed NP3A and NP3B ECB.

· The light control matrix and the interior lighting specification are not clear on the intent for the lighting control for this project. Are the ceiling mounted vacancy and occupancy sensor line voltage or 24dc?

Refer to control diagram detail A3/E-502. Intent is to have low voltage control wiring from power pack to sensor.

· Can low voltage switches (cat5e) be used instead of the line voltage single pole, 3way and 4-way switches shown on the drawings?

No, Specification 26 51 00 2.5.1 requires line-voltage for toggle switches

· Can low voltage four button on/off raise /low with 0-10v power pack, instead of slide or rotator dimmers?

Provide what is shown on construction drawings.

· Can a detail drawing be provide showing equipment and wiring be provided light controls for each area as per the luminaire control schedule?

Provide design that is compliant with luminaire control schedule.

· Drawing E-401 keynote 6 is call for a light contractor with astronomical time switch. There is not detail showing the number of poles required, amperage of light contractor or if the light contactor is electric held or mechanical held. Or what light fixture are control be the light contractor. Please provided all information for lighting contractor.

Refer to C5/E-611 for lighting contactor schedule. Refer to specification 26 51 00 2.5.4 for lighting contactor requirements.

· There were additional documents added to the solicitation on 08/12, 08/23, and 08/30 but no official amendment. Do these three additions need to be acknowledged on the SF1442 as an amendment?

These do not need to be acknowledged. There was no change in scope and no amendment is needed.

· Can you confirm that the original bid bond should be sent separately (delivered by 09/05) from the bid response which is due on 09/09? Reference page 4 of 92 of the solicitation, 4. C.

Bid bond should be submitted with the rest of the solicitation package which is due 9 Sep 22 at 10:00am