This memorandum documents minutes from a pre-solicitation meeting and site visit for solicitation number W50S7Z-22-B-0002. The solicitation is for a Building 119 Renovation project with a period of performance of 18 months and estimated value between $1,000,000 to $5,000,000. The project location is 159th Fighter Wing, 400 Russell Ave, Building 24 in New Orleans, Louisiana. The requirement is 100% set aside for small business with a NAICS code of 236220 for commercial and institutional building construction and small business size standard of $39.5M. Key questions asked at the meeting involved supervision requirements, use of job trailers and existing facilities, and availability of water and power. The site visit concluded with an agreement for the government to provide a laydown area for materials and dumpsters. Prospective offerors were encouraged to attend the site visit on August 12, 2022 at 10:00am CST.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOUISIANA AIR NATIONAL GUARD

159TH FIGHTER WING

NAS JRB NEW ORLEANS LOUISIANA 70143-0027

12 Aug 2022

MEMORANDUM FOR RECORD

SUBJECT: Building 119 Site Visit Minutes

FROM: 159 MSC

(1) The purpose of this memorandum is to document the pre-solicitation meeting and site visit for W50S7Z-22-B-0002 for Building 119 Renovation

(2) The following was documented during the presolicitation meeting and site visit

a. Meeting began by contracting specialist getting attendees to sign in and going over basic scope of the project to include magnitude, proposal prep and bonding requirements

b. Opened the meeting up for questions, the following were asked and answered:

i. How often is supervision required? 100%

ii. Is a job trailer required? Not required, but welcome to have one

iii. Can bathrooms in existing facilities be used? Not allowed in other facilities, plan to use portajons

iv. Is water and power available to the building? Yes, both power and water is run to the building

v. A lay down area is not noted on drawings government will accommodate an area for materials and dumpsters

(3) Pre‐Solicitation meeting was concluded and all attendees went to look at the site

Greggory H. Price, MSgt, LA ANG Contracting Specialist

2022-08-23T15:54:15-0500
PRICE.GREGGORY.HILL.1250740596