PRQE 222015
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Please see continuation sheet.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jul-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S7X22B0002
X 9B. DATED (SEE ITEM 11)
06-Jul-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jul-2022
CODE
184 KS AIR NATIONAL GUARD
184 MSG CONTRACTING OFFICE - WAWF W912JC
52955 JAYHAWK DRIVE STE 153
MCCONNELL AFB KS 67221-9000
W912JC 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S7X22B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
CONTINUATION SHEET
A. NECESSITY FOR CHANGE: An updated wage determination and questions that arose during the site visit requires this amendment to allow contractors to accurately bid the project.
B. DESCRIPTION OF CHANGE: This amendment is being issued to incorporate the following into the solicitation:
1. Add new wage rate determination – General Decision Number : KS20220057 Dated 07/08/2022
2. Revised drawings MD-1 & M-1. New sheets are clouded and marked REVISED SHEET
3. Revised Statement of Work (SOW) dated 14 July 2022.
C. TIME: The solicitation date and time is unchanged
D. WAGE RATES: The wage rates applicable to this solicitation has been updated.
E. POSTING: New wage determination and SOW will be attached to the SF 30. The addenda drawings will be posted at SAM (https://sam.gov/content/home) for the contractor to retrieve.
UPDATED STATEMENT OF WORK
STATEMENT OF WORK
KANSAS AIR NATIONAL GUARD, McCONNELL AFB PRQE222015 Repair Bldg 54 #2 CRAC Unit Revised 14 July 2022
SW-1 LOCATION: McCONNELL Air Force Base, Wichita, KS. Arrangements for entrance onto the Base must be made by contacting Base Engineering at (316) 759-7477 between the hours of 7:00 a.m. and 4:00 p.m., Monday through Friday.
SW-2 SCOPE OF WORK: The work covered in this contract consists of furnishing all plant, labor, expertise, equipment, materials, facilities, transportation, and appliances necessary to perform operations in connection with the work described in paragraph SW-3. It is the intent of the government for the contractor to provide a complete and useable system. Any relevant details required for a complete system that are omitted in the contract plans and specifications will be provided by the Contractor at no cost to the government.
SW-3 SUMMARY OF WORK: Work shall consist of but is not limited to the following:
Task 1: Replace and reroute a portion of the existing copper refrigerant line sets on two existing 30 Ton Liebert Computer Room Air Conditioning (CRAC) Units. Each Liebert Unit has two R-22 refrigerant circuits each having approximately 120 pounds of refrigerant. Due to operational requirements of the server farm, only one circuit of one Liebert Unit can be down at a time. R-22 Freon can be recycled for #1 and #3 CRAC units if the acid content is acceptable, otherwise new Freon shall be used. If new refrigerant is needed, the KSANG will either provide the refrigerant or initiate a change order to purchase new refrigerant. CRAC-2 will be completely replaced with a new unit. Completely replace the refrigerant lines for the new CRAC-2 and charge the system. Each of the 6 existing line sets is comprised of one 1 inch line and one 1¼ inch line (see drawings for new and existing routing).
Replacement lines will use ACR copper piping and will be insulated with Rubatex insulation. Provide insulation blocks at pipe supports and aluminum jacket around exterior piping to protect insulation. There will be combination isolation/shraeder valves installed at the condenser end of the new portion of the line sets as well as isolation/shraeder valves installed on the linesets just outside the indoor unit (Evaporator) approximately 4 feet above the finished floor. The result will be two isolation/shraeder valves on each of the six lines. Include installation of replaceable filters and liquid line dryers and assemblies on all six circuits. Linesets will exit the building through the concrete precast wall at approximately 12 feet high. Lines will be supported by pipe stands or hangers keeping at least a 12 foot clearance above the ground until they reach the condensing units.
Note: The contractor will help ensure cooling to the server farm is maintainted during the performance of this work by only having one circuit of each CRAC unit down at a time. Air conditioning must be sufficient to keep the server farm continuously at 73 degrees +/- 2 degrees.
Task 2: Replace CRAC-2 in its intirety. The new unit will consist of an interior 30 Ton Precision Cooling System CRAC Unit with a new 30 Ton DX Air-Cooled Microchannel Condensing Unit. The new units will be installed in the same locations as the old interior/exterior systems. Due to the criticality of the server farm, it is critical the demolition of the existing CRAC only occur immediately prior to the installation of the new unit. Install combination isolation/shraeder valves at the condenser end of the line sets as well as just outside the indoor unit (Evaporator) approximately 4 feet above the finished floor.
It is understandable that there may be a long lead time on the new CRAC Unit. Tasks 1 can occur immediately after the Notice to Proceed is provided or wait until the new CRAC unit has been delivered.
Once work has started on replacing the refrigerant lines and removing the CRAC Unit, it shall be the contractors responsibility to assist the KSANG in ensuring the server farm temperature remains below 75 F by limiting the amount of time any one refrigerant circuit is down and also responding to issues related to the contract work in a timely manner. Upon request and in the event of an emergency, the KSANG will install and maintain a portable, trailer mounted 50 ton Roof Top Air Conditioning System. Also, Roughly 10 tons of building air can also be diverted to the server farm via the DDC controls as well. KSANG will service the existing CRAC Units to ensure function and respond to system failures 24/7/365. The contractor must be available in the event their work is causing the failure/issue leading to higher temperatures in the server farm.
Computer Room Air Conditioning Unit Specifications:
Computer Room Air Conditioning (CRAC) Unit Precision Cooling System – INDOOR UNIT Specifications ꞏ Capacity: Nominal 105kW (30 Ton) ꞏ Configuration: Air Cooled / Upflow ꞏ Voltage: 460 Volt, 60Hz, 3 Phase, 65,000 amps RMS Short Circuit Current Rating ꞏ Locking Disconnect Switch ꞏ Supply Air Configuration: Exits top of cabinet – shall be connected to existing ductwork via flexible/canvus duct ꞏ Return Air Configuration: Front return w/ grille ꞏ Humidifier: Infrared w/ automatic flush cycle; Capacity: 22 lbs/hr ꞏ Reheat: Three-stage, Finned tubular, 304/304 stainless steel electric; Capacity: 25kW ꞏ Refrigerant: R-407C or R-410A; field supplied and field charged on air-cooled units ꞏ Condensate Pump: factory installed dual float w/ unit alarm and high water shutdown. Rated for 100GPH at 20 ft head ꞏ Provide with leak detection, provide link for alarm on BMS and local display ꞏ Plenum: no, unit shall be connected to existing ductwork by others ꞏ Floorstand: yes, may reuse existing if it is compatible with new unit ꞏ Frame: 14 gauge, welded frame, with protective A-coating or E-coating.
ꞏ Frame can be field separated into three sections for transport through small areas (Unit shall be brought into the building through a standard 4’x7’ door opening) ꞏ Front Service Access
ꞏ Exterior panels insulated & powder coated ꞏ 4" filters, MERV 8 rating ꞏ Centrifugal blower, minimum 200,000 hours L3 permanently lubricated pillow-block bearings. Static regain duct attached to bottom of blower ꞏ Dual fixed-pitch motor sheaves, dual fixed-pitch fan pulleys, dual belts and automatic belt-tensioning system ꞏ Open Drip Proof NEMA Premium Efficiency Motor ꞏ Dual refrigeration circuits with liquid line filter driers, refrigerant sight glasses, expansion valves, and liquid line solenoid valves ꞏ Two (2) independent Digital Scroll Compressors provide variable capacity, increased part-load energy efficiency, and reduced compressor cycling ꞏ A-frame Evaporator coil with stainless steel drain pan ꞏ Digital Controls with High Definition Display ꞏ Universal Building Management System communication w/ SNMP and BACnet IP (Ethernet Port); Ensure compatibility with existing BMS by Coordinating with Sandifer Engineering, Wichita, KS
Air-Cooled Microchannel Condensing Unit – OUTDOOR UNIT ꞏ Voltage: 460 Volt, 60Hz, 3 Phase, 65,000 amps RMS Short Circuit Current Rating ꞏ Legs: 18.0” aluminum, minimum ꞏ Microchannel aluminum coil ꞏ Variable Speed EC Fans
- Low Ambient temperature contols ꞏ Premium electronic control board providing communication with interior unit and BMS ꞏ Aluminum exterior panels ꞏ Dual refrigerant circuit condenser ꞏ R-407C or R-410A Refrigerant
Factory Services ꞏ Parts Warranty: One Year Manufacturer’s warranty ꞏ Labor Warranty - Installation: One year to be provided by installer ꞏ Extended Compressor Warranty: Five year parts only, Labor not included ꞏ CAT5/6 networking cable(s) for BMS communication to be provided and installed by controls contractor
SW-4 CODES & STANDARDS: All work performed under this contract shall be in accordance with federal, state and local codes & standards, as well as widely accepted industry standards, including but not limited to:
International Building Codes, International Mechanical Code, International Plumbing Code, American Institute of Architects, American Concrete Institute, American Institute of Electrical Engineers, American Institute of Steel Construction, American National Standards Institute, American Society of Heating, Refrigerating and Air- Conditioning Engineers, American Society of Mechanical Engineers, American Society of Testing Materials, National Bureau of Standards, National Electric Code, American Welding Society, Brick Institute of America, Building Officials and Code Administrators, Federal Aviation Administration, National Fire Protection Association, Occupational Safety & Health Administration, Rubber Manufacturers Association, Underwriters Laboratories, and the Kansas DOT. standard specification. Additionally, all requirements of the Kansas Department of Health must be satisfied in their entirety for any work performed or materials bought under this contract. Failure to comply with any of the aforementioned codes and standards shall be considered as a failure to comply to contract specifications.
SW-5 UTILITIES: Contractors shall coordinate with all local utilities having jurisdiction: Kansas Gas and Electric, Wichita Water Dept., Southwestern Bell, AT&T, Wichita Sewer Dept. and the Base Engineers Office.
SW-6 CALL BEFORE YOU DIG: All contractors shall be responsible for “Call Before You Dig” for any excavations or penetrations into the ground greater than 4” deep. In addition, all contractors shall apply for a digging permit to the Base Engineers Office for any excavations or penetrations into the ground, greater than 4” deep. The contractor should expect a minimum of 7 days from the date of the request to the issuance of a permit.
The Contractor is encouraged to attend the Digging Permit Meeting. These meetings are scheduled for every Tuesday at 10:00 A.M.
SW-7 CONFINED SPACE: The Contractor shall provide a confined space entry permit to the Base Engineers Office prior to any entry into a permit-required confined space. The following steps shall be accomplished to acquire authorization to open or enter a confined space:
1. The Contractor shall provide written notice to the Contracting Office Technical Representative, (COTR) defining exact location of space requiring entry.
2. A KANG Confined Space Supervisor shall brief the Contractor on the following:
a. The contents of the space and known hazards that make the space permit-required.
b. The precautions and procedures that have been implemented by the organization to protect KANG personnel.
c. Emergency rescue responsibilities to determine whether the Contractor supplies the rescue team or if the installation fire department is expected to supply a rescue function.
d. It is the Contractor’s responsibility to contact the Fire Chief on the installation if the Contractor is planning to use the installation fire department as a rescue function.
e. Standard procedures if the project requires a combined effort involving both KANG and contracted personnel to access the space at the same time.
f. Contractor shall follow Air Force Occupational Safety and Health Standard 91-25 and
Occupational Safety and Health Administration 29 CFR 1910.146.
3. A written record of the briefing shall be signed by the Contractor and Confined Space Supervisor and kept on file in the project folder.
4. The Contractor accepts full responsibility at this point to initiate and maintain the permit and supply all material, equipment and labor to test, monitor, enter and exit the space in a safe manner.
5. The Contractor’s Confined Space Entry Permit shall be kept on site during entry to the space. A copy of the Contractor’s Permit shall be returned to the COTR at the completion of the project.
SW-8 MATERIALS: The materials shall conform to specifications, applicable industry codes and standards and the manufacturer's recommendations, which ever is more stringent. Certificates of compliance and Technical Data Sheets are required for all materials supplied.
SW-9 SITE INSPECTION: The Contractor is required to acknowledge, at time of Bid Opening that said contractor has inspected, and is fully cognizant of conditions at the site. No allowance or consideration will be given after award for any condition(s) which was(were) existing at the time of the site visit.
SW-10 BASE ACCESS: The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations. The contractor shall be provided an electronic Base Access Form to be filed out and submitted electronically to the Project Manager. The security check process can take up to 5 days to be processed by the 22nd Security Forces. The Project Manager will notify the General Contractor once the requests have been processed. Approved individuals must provide picture identification and if driving they will need a valid driver’s license, auto registration and proof of insurance at the time they pick up their Badges at the Visitor Center located at the East Gate off Rock Road. After Contractors have their Badge they should enter the Base at the West Gate.
Access is limited to locations noted on the Badge. All other areas are off limits. Vehicle Passes are not transferable to other vehicles. The Government reserves the right to deny access to any person, with no consequence to the contract.
SW-11 SAFETY: Compliance with OSHA and other applicable laws and regulations for the protection of employees is exclusively the obligation of the commercial contractor. Government employees must comply with
AFOSH.
SW-12 CLEAN-UP: Clean-up and remove debris generated by this contract to an approved off-base location. Two
(2) copies of the receiving (tipping or dumping) tickets, with a cover letter from the Prime Contractor stating the full name and address of the location to which debris was taken.
SW-13 GOVERNMENT RESOURCES: No Government resources shall be made available to the contractor, unless otherwise stated in this Statement of Work. The contractor shall provide for all necessary resources to provide a complete and usable facility or systems as described in the contract documents. The contractor shall not obligate Government resources in any manner. The Government shall seek remedy for any obligation or encumbrance imposed by the Contractors actions. Government resources include, but are not limited to, government owned materials, equipment, tools, vehicles, personnel and facilities.
SW-14 ATTACHMENTS
Building 54 Floor Plan with Construction Notes (2 Sheets)
-MD-1 DEMO #2 CRAC UNIT AND COOLANT LINES
-M-1 REPLACE #2 CRAC UNIT
UPDATED WAGE DETERMINATION
"General Decision Number: KS20220057 07/08/2022
Superseded General Decision Number: KS20210057
State: Kansas
Construction Type: Building
County: Sedgwick County in Kansas.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 |into on or after January 30, | generally applies to the |2022, or the contract is | contract.
|renewed or extended (e.g., an |. The contractor must pay |option is exercised) on or | all covered workers at |after January 30, 2022: | least $15.00 per hour (or | | the applicable wage rate | | listed on this wage | | determination, if it is | | higher) for all hours | | spent performing on the | | contract in 2022.
|If the contract was awarded on|. Executive Order 13658 |or between January 1, 2015 and| generally applies to the |January 29, 2022, and the | contract.
|contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least |30, 2022: | $11.25 per hour (or the | | applicable wage rate listed|
| | on this wage determination,| | | if it is higher) for all | | hours spent performing on | | that contract in 2022.
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.
Modification Number Publication Date 0 01/07/2022 1 02/04/2022 2 02/18/2022 3 02/25/2022 4 04/08/2022 5 06/03/2022 6 06/17/2022 7 07/08/2022
ASBE0027-005 10/01/2021
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (MECHANICAL (Duct, Pipe & Mechanical System Insulation)).....................$ 37.80 28.57
BRKS0015-011 06/01/2020
Rates Fringes
TILE SETTER......................$ 36.79 15.78
BRKS0015-014 06/01/2020
Rates Fringes
TILE FINISHER....................$ 17.99 .91
ELEC0271-002 05/28/2022
Rates Fringes
ELECTRICIAN (including Alarm Installation)....................$ 35.99 16.41
ELEV0012-004 01/01/2021
Rates Fringes
ELEVATOR MECHANIC................$ 51.68 35.825+a+b
a. VACATION PAY: 6% for 6 months to 5 years service; 8% with 5 or more years of service.
b. PAID HOLIDAYS: Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Friday after, and Christmas Day.
ENGI0101-040 04/01/2016
Rates Fringes
POWER EQUIPMENT OPERATOR:
Bobcat/Skid Steer/Skid
Loader......................$ 37.63 15.97 Oiler.......................$ 32.08 15.97 Paver (Asphalt, Aggregate, and Concrete)...............$ 38.44 15.97
IRON0010-018 04/01/2021
Rates Fringes
IRONWORKER
(Ornamental/Reinforcing).........$ 34.50 31.99
* IRON0024-005 06/01/2022
Rates Fringes
IRONWORKER, STRUCTURAL...........$ 26.49 13.48
PAIN2012-008 04/01/2020
Rates Fringes
PAINTER (Brush, Roller, and Spray)...........................$ 32.91 17.86
PLUM0441-014 06/01/2022
Rates Fringes
PIPEFITTER (HVAC Pipe Installation Only)...............$ 36.02 18.58
PLUM0533-012 06/01/2016
Rates Fringes
PIPEFITTER (Excludes HVAC Pipe Installation)...............$ 45.33 19.32
SFKS0669-002 04/01/2022
Rates Fringes
SPRINKLER FITTER (Fire Sprinkler).......................$ 37.30 23.92
TEAM0541-010 04/01/2020
Rates Fringes
TRUCK DRIVER (Lowboy Truck)......$ 34.29 15.25
TEAM0541-011 04/01/2020
Rates Fringes
TRUCK DRIVER (Semi-Trailer Truck)...........................$ 34.29 15.25
* SUKS2015-026 07/08/2015
Rates Fringes
BRICKLAYER, Excludes Tile Finisher and Tile Setter.........$ 21.85 3.04
CARPENTER........................$ 17.62 1.93
CEMENT MASON/CONCRETE FINISHER...$ 17.17 2.23
LABORER: Common or General......$ 13.16 ** 1.44
LABORER: Mason Tender - Brick...$ 19.91 6.88
LABORER: Mason Tender - Cement/Concrete..................$ 11.55 ** 1.67
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 20.50 3.49
OPERATOR: Bulldozer.............$ 33.12 13.96
OPERATOR: Crane.................$ 33.19 14.16
OPERATOR: Forklift..............$ 34.83 14.16
OPERATOR: Grader/Blade..........$ 29.58 11.51
OPERATOR: Loader................$ 30.35 12.04
OPERATOR: Roller................$ 33.78 13.64
PLUMBER..........................$ 23.12 6.86
ROOFER...........................$ 13.33 ** 1.66
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 24.84 6.82
SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 22.25 4.42
TRUCK DRIVER: Dump (All Types)...$ 19.63 5.26
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($15.00) or 13658 ($11.25). Please see the Note at the top of the wage determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example:
SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"