PRQE 222012 - Drawings.pdf

PDF 276 KB Posted

Attached to
Replace CRAC Unit#2 Building 54 - 184 Wing, Kansas Air National Guard
Solicitation number
W50S7X-22-B-0002
Issued by

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOUNT PIPING CLOSE

AGAINST EXTERIOR OF WALL.

PIPING SHOWN AWAY FROM

WALL FOR CLARITY ONLY.

\ □ (E)ACU-4 \

®1L ___ rE lA c c

-1

L ___ rE lA c c

-3

'-=, ==LJ============a�

� I I I I I I I I I I I I I

I I I I I I I I I I I

I I I I I I I I I I I

I I I I I I I I I I I

I I I I I I I I I I I

I I I I I I I I I I I I

I I I trn □

I I I I I I I I

DN

DC

MECHANICAL DEMO PLAN

1/8" = 1'-0"

®DUCT ABOVE

�1 G)

76" lt-------122"--------<

EXIST. CRAG FRONT

EXIST. CABINET DIMENSIONS

1/8" = 1'-0"

DEMOLITION PLAN NOTES:

(D REMOVE EXISTING LIEBERT CRAC UNIT #2.

@ EXISTING DUCTWORK TO REMAIN. MODIFY DUCT AS REQUIRED TO RECEIVE NEW

CRAC UNIT.

@ REMOVE EXISTING REFRIGERANT PIPING AS SHOWN. THIS WORK SHALL BE DONE

ONE CIRCUIT AT A TIME AND SCHEDULED WITH CONTRACTING OFFICER

REPRESENTATIVE. SALVAGE R-22 REFRIGERANT, TEST FOR IMPURITIES AND REUSE

AFTER NEW PIPING IS INSTALLED. RETURN EXCESS REFRIGERANT TO KSANG. PATCH

AND SEAL EXISTING WALL PENETRATIONS.

@) SECTION OF EXISTING REFRIGERANT PIPING TO REMAIN.

@ REMOVE EXISTING #2 CONDENSING UNIT. EXISTING HOUSE KEEPING PAD AND

ELECTRICAL TO REMAIN FOR NEW UNIT, MODIFY AS REQUIRED FOR NEW INSTALL

@ EXISTING CONDENSING UNIT SHALL REMAIN

(f) EXISTING DOMESTIC WATER PIPING TO CRAC UNITS TO REMAIN

@ REMOVE CRAC-2 REFRIGERANT LINES. SUPPORTS MAY BE REUSED FOR NEW PIPING

GENERAL NOTES:

1. REPAIR ALL DAMAGE TO WALLS AND CEILING DUE TO DEMOLITION.

2. EXISTING CEILING TO REMAIN IN TACT DURING CONSTRUCTION. MINIMIZE

DIRT IN ROOM BY VACUUMING CEILING CAVITY AROUND AREAS OF DIRECT

WORK WITH HEPA FILTERED VACUUM.

3. FIELD VERIFY ALL EXISTING CONDITIONS.

4. ONCE CONTRACT IS AWARDED AND WORK STARTS, IT IS THE CONTRACTORS

RESPONSIBILITY TO MAINTAIN COOLING IN THE SERVER FARM.

5. PROVIDE A DETAILED PLAN OF HOW THE INSTALLATION OF THE NEW CRAG

UNIT AND RELOCATION OF THE REFRIGERANT LINES WILL OCCUR PRIOR TO

STARTING DEMOLITION.

6. REFER TO THE STATEMENT OF WORK FOR ADDITIONAL REQUIREMENTS.

1-----------122"---------I r 2" f 118"

1" •i----+1----- PLENUM-------___, 35,, 32" FLANGE

PLENUM

L

FLANGE G)

l=::::::::::::

j

EXIST. CRAG TOP

� FLEX DUCT ITYPl

4' 8'

SCALE: 1/8" = 1'

16" EB NORTH

184th CES

Kansas Air National Guard McConnell AFB Wichita KS

Project Name:

BUILDING 54 -

REPLACE CRAG

UNIT#2

Project No.

PRQE222015

ACAD File:

P222015 M-1.DWG

Designer:

Lt. Col. Brock J. Sissel Drawn by: Check by:

J.K.B. D.C.

Date: Scale:

06-15-2022 As Noted Sheet Name:

B54 - DEMO CRAC UNIT

#2 AND COOLANT LINES

Sheet:

M 0_ 1 Sheet No. 1 of2

MOUNT PIPING CLOSE

AGAINST EXTERIOR OF WALL.

PIPING SHOWN AWAY FROM

WALL FOR CLARITY ONLY.

®-0 (E)ACU-4

'-=, ==LJ============a�

� I I I I I I I I I I I I I

I I I I I I I I I I I

� I I I I I I I I I I I I I

I I I I I I I I I I I

� I I I I I I I I I I I I I

� I I I I I I I I I I I I I

I I I trn □

I I I I I I I I DN

DC

MECHANICAL PLAN - WEST MECHANICAL

1/8" = 1'-0"

ANGER ROD TO STRUCTURE I UNISTRUT

EAVY DUTY CLEVIS HANGER

SIZED FOR INSULATION THICKNESS

IPE INSULATION TO MATCH

EXISTING TYPE AND THICKNESS.

NSULATION SADDLE SHIELD 14 GA

GALVANIZED x24" LONG

NOTE: FOR EXTERIOR OR WET

LOCATIONS USE GALVANIZED MATERIALS.

PIPE HANGER DETAIL

1/2" = 1'-0"

FLEX DUCT (TYP)

DUCT ABOVE /+") I

�r 132"

FLD J

� [Q] VF'v

G) 76" i I i I � 131"

NEW CRAG CABINET FRONT

(BASED ON LIEBERT DS COOLING SYSTEM)

CABINET DIMENSIONS

1/8" = 1'-0"

Alternate Ref Piping E rigerant ntrance rr=·1

LL

High Volt Conne ction(s)

PLAN NOTES:

())INSTALL NEW CRAC UNIT. CONNECT WATER, CONDENSATE DRAIN, AND DUCT WORK

TO UNIT AND ROUTE NEW REFRIGERANT PIPING TO UNIT. MODIFY EXISTING

ELECTRICAL SERVICE TO UNIT AS REQUIRED AND MAKE FINAL CONNECTION. PULL

NEW WIRES AS REQUIRED TO MEET CODE IF NECESSARY. CONNECT TO DUCT WITH

FLEX DUCT

® MODIFY DUCT AS REQUIRED TO RECEIVE NEW CRAC UNIT. CONNECT WITH FLEX

DUCT

® INSTALL UNISTRUT TO SUPPORT NEW REFRIGERANT PIPING, MOUNT TO EXTERIOR

WALL ABOVE DOORWAYS AND ELECTRICAL EQUIPMENT. PROVIDE FREE STANDING

PIPE STANDS AS REQUIRED.

@) INSTALL NEW REFRIGERANT PIPING ALONG THE EXTERIOR OF THE BUILDING TO

PENETRATE EXTERIOR WALL AT NEW LOCATION. THIS WORK SHALL BE DONE ONE

UNIT AT A TIME AND SCHEDULED WITH CONTRACTING OFFICER REPRESENTATIVE.

@) REATTACH NEW PIPING TO EXISTING PIPING FOR CRAC UNITS #1 AND #3

@) INSTALL NEW CONDENSING UNIT. MODIFY EXISTING ELECTRICAL SERVICE TO UNIT AS

REQUIRED AND MAKE FINAL CONNECTION. PULL NEW WIRES AS REQUIRED TO MEET

CODE IF NECESSARY

(j) NOT USED

@) EXISTING CONDENSING UNIT. CONNECT NEW REFRIGERANT LINES AND RECHARGE

SYSTEM

® CORE DRILL PRECAST WALL AND PROVIDE LINK SEAL AROUND PIPE TO SEAL

PENETRATION AIR TIGHT

@ PROVIDE 3 TEMPERATURE AND HUMIDITY SENSORS IN EACH ROW OF SERVERS.

PROVIDE LINK TO DDC PAGE WITH ALARM NOTIFICATION IF TEMP RISES ABOVE 78°F

(ADJ) OR HUMIDITY IS <30% OR >50%

<D) TIE DDC INTO NEW CRAC-2 AND PROVIDE MAXIMUM DATA AVAILABLE FOR THIS UNIT

ON THE DDC PAGES.

GENERAL NOTES:

1. REPAIR ALL DAMAGE TO WALLS AND CEILING DUE TO DEMOLITION.

2. EXISTING CEILING TO REMAIN IN TACT DURING CONSTRUCTION. MINIMIZE

DIRT IN ROOM BY VACUUMING CEILING CAVITY AROUND AREAS OF DIRECT

WORK WITH HEPA FILTERED VACUUM.

3. FIELD VERIFY ALL EXISTING CONDITIONS.

4. ONCE CONTRACT IS AWARDED AND WORK STARTS, IT IS THE CONTRACTORS

RESPONSIBILITY TO MAINTAIN COOLING IN THE SERVER FARM.

5. PROVIDE A DETAILED PLAN OF HOW THE INSTALLATION OF THE NEW CRAC

UNIT AND RELOCATION OF THE REFRIGERANT LINES WILL OCCUR PRIOR TO

STARTING DEMOLITION.

6. REFER TO THE STATEMENT OF WORK FOR ADDITIONAL REQUIREMENTS.

,__ ______ 105114" ______ ., Handle

Low Volt Connection(s)

NEW CRAG CABINET TOP

4' 8'

SCALE: 1/8" = 1'

16'

5/16" I

EB NORTH

184th CES

Kansas Air National Guard McConnell AFB Wichita KS

Project Name:

BUILDING 54 -

REPLACE CRAG

UNIT#2

Project No.

PRQE222015

ACAD File:

P222015 M-1.DWG

Designer:

Lt. Col. Brock J. Sissel Drawn by: Check by:

J.K.B. D.C.

Date: Scale:

06-15-2022 As Noted Sheet Name:

B54 - REPLACE CRAC

UNIT#2

Sheet:

M-1 Sheet No. 2 of2

1151126746N Typewritten Text

PROVIDE ALUMINUM JACKET ON EXTERIOR PIPING

1151126746N Line

PRQE 222012 - MD-1
PRQE 222012 - M-1

File details come from the government source that posted it. Updated .