Abstract Repair B37 Parking Lot.pdf

PDF 230 KB Posted

Attached to
Repair of Building 37 Parking Lot
Solicitation number
W50S7X-20-B-0001
Issued by

About this file

This document is an abstract of offers for a federal construction contract to repair a parking lot. The solicitation number is W50S7X-20-B-0001 and is for removing an existing 38,800 square foot asphalt parking lot at Building 37 and installing a new 6-inch concrete parking lot along with curb and gutter work and handicap ramp installation at McConnell Air Force Base. Offers were due by April 16, 2020 and six offers were received ranging from $280,222.35 to $446,881.67. The awarded contractor was Andale Construction at $280,222.35. The required work includes adjusting the base course, providing nuclear density testing, striping parking stalls, and complying with the attached specifications. The contracting agency is the Department of the Army National Guard.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER 2. DATE ISSUED 3. DATE OPENED PAGE OF

PAGES

4. ISSUING OFFICE

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

SIGNATURE DATE SIGNED

5. PROJECT TITLE

6. NUMBER

7A.

ITEM NO. 7B. DESCRIPTION OF OFFERED ITEMS 7C. EST.

QUANTITY

8. GOVERNMENT ESTIMATE

(Check A, B, or C and complete D, E, and F.)

A. HIRED LABOR

B. REASONABLE CONTRACT

(Without profit)

C. REASONABLE CONTRACT

(Including profit)

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

9. OFFERS

NO. 1

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

NO. 2

A. OFFEROR

B. BID SECURITY (Type and amount)

C. AMENDMENTS ACKNOWLEDGED

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

NSN 7540-01-150-0987 501419-101 NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 11-88 Prescribed by GSA-FAR (48 CFR 53.236-1)

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when, more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE

3. CONTRACT ITEMS

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT

4. OFFERS (Continued)

NO.

A. OFFEROR

B. BID SECURITY (Type and Amount)

C. AMENDMENTS ACKNOWLEDGED

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

NO.

A. OFFEROR

B. BID SECURITY (Type and Amount)

C. AMENDMENTS ACKNOWLEDGED

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

NO.

A. OFFEROR

B. BID SECURITY (Type and Amount)

C. AMENDMENTS ACKNOWLEDGED

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

NO.

A. OFFEROR

B. BID SECURITY (Type and Amount)

C. AMENDMENTS ACKNOWLEDGED

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

NSN 7540-01-280-5502 501419-101 OPTIONAL FORM 1419A 11-88

Prescribed by GSA-FAR (48 CFR 53.236-1)

JF01: W50S7X-20-B-0001
JF02: 16 Mar 20
JF03: 16 Apr 20
JF04: 1
JF05: 2
JF06: 184 MSG/MSC - Contracting 52955 Jayhawk Dr Bldg 65 McConnell AFB, KS 67221
JF07: PRQE 172475 Repair Bldg. 37 Parking Lot
JF08:
JF09: 0001
JF10: Base Bid
JF11: 1
JF12: JA
JF13: 350000
JF14: 350000
JF09_2: 0002
JF10_2: CMRA
JF11_2: 1
JF12_2: JA
JF13_2: 0.00
JF14_2: 0.00
JF09_3:
JF10_3:
JF11_3:
JF12_3:
JF13_3:
JF14_3:
JF09_4:
JF10_4:
JF11_4:
JF12_4:
JF13_4:
JF14_4:
JF09_5:
JF10_5:
JF11_5:
JF12_5:
JF13_5:
JF14_5:
JF09_6:
JF10_6:
JF11_6:
JF12_6:
JF13_6:
JF14_6:
JF09_7:
JF10_7:
JF11_7:
JF12_7:
JF13_7:
JF14_7:
JF09_8:
JF10_8:
JF11_8:
JF12_8:
JF13_8:
JF14_8:
JF09_9:
JF10_9:
JF11_9:
JF12_9:
JF13_9:
JF14_9:
JF09_10:
JF10_10:
JF11_10:
JF12_10:
JF13_10:
JF14_10:
JF09_11:
JF10_11:
JF11_11:
JF12_11:
JF13_11:
JF14_11:
JF09_12:
JF10_12:
JF11_12:
JF12_12:
JF13_12:
JF14_12:
JF09_13:
JF10_13:
JF11_13:
JF12_13:
JF13_13:
JF14_13:
JF09_14:
JF10_14:
JF11_14:
JF12_14:
JF13_14:
JF14_14:
JF15:
JF16:
JF17: X
JF18: Darin l Brun - Contracting Officer
JF19: 16 Apr 20
JF20: Andale Construction
JF22: Bond 20%
JF23: Bond 10%
JF22_2: 2
JF23_2: 1
JF24: 280222.35
JF25: 280222.35
JF26: 377666.50
JF27: 377666.50
JF24_2: 0.00
JF25_2: 0.00
JF26_2: 0.0
JF27_2: 0.0
JF24_3:
JF25_3:
JF26_3:
JF27_3:
JF24_4:
JF25_4:
JF26_4:
JF27_4:
JF24_5:
JF25_5:
JF26_5:
JF27_5:
JF24_6:
JF25_6:
JF26_6:
JF27_6:
JF24_7:
JF25_7:
JF26_7:
JF27_7:
JF24_8:
JF25_8:
JF26_8:
JF27_8:
JF24_9:
JF25_9:
JF26_9:
JF27_9:
JF24_10:
JF25_10:
JF26_10:
JF27_10:
JF24_11:
JF25_11:
JF26_11:
JF27_11:
JF24_12:
JF25_12:
JF26_12:
JF27_12:
JF24_13:
JF25_13:
JF26_13:
JF27_13:
JF24_14:
JF25_14:
JF26_14:
JF27_14:
2020-04-16T12:03:34-0500
BRUN.DARIN.L.1149519250
JF21: Green Dream International
AJF01: W50S7X-20-B-0001
AJF02: 2
AJF03: 2
AJF04: PRQE 172475 Repair Bldg. 37 Parking Lot
AJF05: 3
AJF06: Snodgrass & Sons Const. Co. Inc.
AJF07: Bond 20%
AJF08: 2
AJF09: 0001
AJF09_2: 1
AJF28: JA
AJF13: $304,700.00
AJF14: $304,700.00
AJF09_3: 0001
AJF09_4: 1
AJF28_2: JA
AJF13_2: $0.00
AJF14_2: $0.00
AJF09_5:
AJF09_6:
AJF28_3:
AJF13_3:
AJF14_3:
AJF09_7:
AJF09_8:
AJF28_4:
AJF13_4:
AJF14_4:
AJF09_9:
AJF09_10:
AJF28_5:
AJF13_5:
AJF14_5:
AJF09_11:
AJF09_12:
AJF28_6:
AJF13_6:
AJF14_6:
AJF09_13:
AJF09_14:
AJF28_7:
AJF13_7:
AJF14_7:
AJF09_15:
AJF09_16:
AJF28_8:
AJF13_8:
AJF14_8:
AJF09_17:
AJF09_18:
AJF28_9:
AJF13_9:
AJF14_9:
AJF09_19:
AJF09_20:
AJF28_10:
AJF13_10:
AJF14_10:
AJF09_21:
AJF09_22:
AJF28_11:
AJF13_11:
AJF14_11:
AJF09_23:
AJF09_24:
AJF28_12:
AJF13_12:
AJF14_12:
AJF09_25:
AJF09_26:
AJF28_13:
AJF13_13:
AJF14_13:
AJF09_27:
AJF09_28:
AJF28_14:
AJF13_14:
AJF14_14:
AJF05_2: 4
AJF06_2: Complete Concrete
AJF07_2: Bond 100%
AJF08_2: 2
AJF13_15: $180,000.00
AJF14_15: $180,000.00
AJF13_16: $40,000.00
AJF14_16: $40,000.00
AJF13_17:
AJF14_17:
AJF13_18:
AJF14_18:
AJF13_19:
AJF14_19:
AJF13_20:
AJF14_20:
AJF13_21:
AJF14_21:
AJF13_22:
AJF14_22:
AJF13_23:
AJF14_23:
AJF13_24:
AJF14_24:
AJF13_25:
AJF14_25:
AJF13_26:
AJF14_26:
AJF13_27:
AJF14_27:
AJF13_28:
AJF14_28:
AJF05_3: 5
AJF06_3: ALLCON Construction
AJF07_3: Bond 20%
AJF08_3: 2
AJF24: $446,881.67
AJF25: $446,881.67
AJF24_2: $0.00
AJF25_2: $0.00
AJF24_3:
AJF25_3:
AJF24_4:
AJF25_4:
AJF24_5:
AJF25_5:
AJF24_6:
AJF25_6:
AJF24_7:
AJF25_7:
AJF24_8:
AJF25_8:
AJF24_9:
AJF25_9:
AJF24_10:
AJF25_10:
AJF24_11:
AJF25_11:
AJF24_12:
AJF25_12:
AJF24_13:
AJF25_13:
AJF24_14:
AJF25_14:
AJF05_4: 6
AJF06_4:
AJF07_4:
AJF08_4:
AJF26: $338,689.00
AJF27: $338,689.00
AJF26_2: $109.00
AJF27_2: $109.00
AJF26_3:
AJF27_3:
AJF26_4:
AJF27_4:
AJF26_5:
AJF27_5:
AJF26_6:
AJF27_6:
AJF26_7:
AJF27_7:
AJF26_8:
AJF27_8:
AJF26_9:
AJF27_9:
AJF26_10:
AJF27_10:
AJF26_11:
AJF27_11:
AJF26_12:
AJF27_12:
AJF26_13:
AJF27_13:
AJF26_14:
AJF27_14:
LF__User:
LF__FormID:
Reset:

File details come from the government source that posted it. Updated .