B37 Parking Lot Submittal Sheet.pdf
PDF 62 KB Posted
- Attached to
- Repair of Building 37 Parking Lot
- Solicitation number
- W50S7X-20-B-0001
- Issued by
-
Department of the Army National Guard
About this file
This submittal sheet outlines material requirements for the repair of Building 37 parking lot project. The contractor must submit base course material, dowel bars/pins, expansion material, joint sealant, and concrete test reports to the project engineer for approval within 10 days of the pre-construction meeting. Additional items such as traffic paint must also be submitted.
The related federal contract opportunity is a solicitation from the Department of the Army National Guard to remove and replace approximately 38,800 square feet of asphalt parking lot with 6 inches of concrete. The work includes adjusting the base course, providing nuclear density testing, removing curb and gutter, and installing one handicap ramp. The parking stalls will be striped with white paint. Bids are due by the date specified in the solicitation.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule of Material Submittals Project title:
TOC Number: DAHA Project Number: PRQE 172475 To be completed by Project Engineer Number Of Required To be completed by Contracting Officer Approval Item or Description of Item Copies days after pre-con Submittal Date CE approval date Disapproval date
1 1 10 2 1 10 3 1 10 ` 4 1 10 5 1 10 6 1 10
Repair Parking lot bldg 37
Base Course Material
Dowel bars/pins
Expansion material
Joint Sealant
Concrete Test Reports
Taffic Paint