Site Visit Minutes Construct BCE Complex - 14 Jul 22.pdf
PDF 191 KB Posted
- Attached to
- 183 Construct BCE Complex
- Solicitation number
- W50S7U-22-B-0002
- Issued by
-
Department of the Army National Guard
About this file
This memorandum documents the minutes of a pre-bid conference and site visit for solicitation number W50S7U-22-B-0002 to construct a Base Civil Engineer Complex at the 183rd Wing in Springfield, Illinois. The conference provided an overview of project specifics and basis for award through a PowerPoint presentation, followed by a tour of the job site.
Key details include a contract period of 730 days to complete all work including options, cleanup and punch list items. Interested offerors must be registered in the System for Award Management to bid. The prime contractor will be responsible for providing web-based project software, and construction must attain a GBCI GP sustainability rating as determined by a third party. The pre-bid conference concluded with an emphasis on checking the solicitation website frequently for any amendments.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
14 July 2022
MEMORANDUM FOR RECORD
FROM: 183 MSG/MSC
SUBJECT: Minutes of Pre-Bid Conference and Site Visit, Solicitation W50S7U-22-B-0002, Construct Base Civil Engineer (BCE) Complex, 183d Wing, Springfield, Illinois.
Date: 14 July 2022 – Time 1300-1415 hours.
1. The list of contractors attending the meeting is shown on the attached sign-in sheet.
The following Government representatives attended the meeting:
Name Title
2d Lt Alicia Braun Base Contracting Officer
CMSgt Brent Keller Contracting Officer
Maj Eric Marks Deputy Base Civil Engineer/
Contracting Officer’s Representative
2. The following items were discussed during the Pre-Bid Conference:
a. The Contract period is 730 days. This includes all work to include options, cleanup, and punch list items. Following receipt and approval of bonds we will hold a pre-construction conference and issue the
Notice to Proceed (NTP).
b. Contractors should expect delays in gaining access to the base for security reasons. Every contractor that needs to gain entry to the installation will have their vehicles searched by Security Forces at the Main Gate. Persons who have submitted an SF 1705 for this site visit should not have to resubmit the SF 1705 for the bid closing date.
c. Interested offerors/bidders must be registered in System for Award Management (SAM). To register, go to: https://sam.gov/. You will need your Unique Entity ID number to register.
d. Stressed the importance of the need to “Request Access” for controlled documents on https://sam.gov for the solicitation posting under the attachments section.
3. A Power Point slide presentation on the project specifics and basis for award was presented to all attendees (Attached).
4. The Power Point presentation was followed by a tour of the subject job site.
5. If mailing your bid, notify the Contracting office of your intent so that our office can be regularly checking for it. If you fail to notify our office, your bid may potentially be help up somewhere else on base and not received on time.
https://sam.gov/ https://sam.gov/
6. Questions must be submitted in writing via email, especially technical questions to:
Alicia.Braun@us.af.mil and Brent.Keller.1@us.af.mil. DO NOT CONTACT the Design Engineers or the
Government Engineers. All questions must be routed through the Contracting Office. All Contractor questions when answered will be posted to the website. If a question arises that will result in a change to the plans or specifications, an official amendment will be issued. All correspondence, questions and answers, amendments, etc. will be issued/posted at https://sam.gov/.
7. Any amendments that are issued will be posted to the website. Contractors were advised to check the website frequently.
8. Maj Marks had the following comments:
a. Addendum 5 is expected early next week.
b. Take note of Division 00 Section 003126 Existing Hazardous Material Information. An existing hazardous materials (asbestos, soils and lead-based paint) survey report for Project, prepared by Environmental Design International Inc., dated August 12, 2019, is available, but are not a warranty of existing conditions.
c. The prime contractor is responsible for providing Web-Based Project Software.
d. This project has been designed for, and must be constructed to attain a sustainability rating of GBCI
GP Assessment Compliance. GBCI compliance will be determined by a third party.
e. Take note of cured in place piping Division 33 - Utilities Section 333150 Cured-In-Place Piping.
9. The pre-bid conference and site visit concluded at 1415 hours (2:15PM CDT).
ALICIA C. BRAUN, 2d Lt, ANG
Base Contracting Officer
Attachments
Sign-In Sheet
Power Point Slides mailto:Alicia.Braun@us.af.mil mailto:Brent.Keller.1@us.af.mil https://sam.gov/
| 2022-07-15T13:15:59-0500 | |
| BRAUN.ALICIA.CAROLYN.1086423290 |
File details come from the government source that posted it. Updated .