Solicitation Amendment W50S7T25BA0050001 SF 30.pdf
PDF 3 MB Posted
- Attached to
- Replace Fire Hydrants
- Solicitation number
- W50S7T25BA005
About this file
This is an Invitation for Bid (IFB) for a federal contract to replace fire hydrants and a water meter at the 182nd Airlift Wing in Peoria, Illinois. The project, numbered FY25_LSRM_08, requires the contractor to replace four existing fire hydrants base-wide and remove and replace the Illinois American Water Company water meter that supplies the main base feed. The solicitation is set aside 100% for small businesses, with a pre-bid conference and site visit scheduled for 30 July 2025. Contractors must submit bids with specific requirements, including a bid bond, representations and certifications, and complete documentation. The government intends to award a firm fixed-price contract to the most advantageous bidder, considering only price. The project involves excavation, utility coordination, concrete pad installation, and demonstration of hydrant operability, with specific requirements for underground utility location, soil disposal, and surface restoration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.
If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Section 00 00 00 - Procurement and Contracting Requirements
The following changes have been made:
INFORMATION FROM TO
Contract Description
Replace 5 failed fire hydrants across the base and install new Illinois American Water meter
Replace Fire Hydrants. The contractor shall provide all materials, tools, equipment, labor, and supervision to replace fire hydrants. There are four existing fire hydrants on base that are not functioning or have been damaged and are in need of replacement. Infrequent use and sediment buildup has led to corrosion and deterioration of the fire hydrants.
Hydrants need to be serviceable to prevent loss of life and material damage in the event of a fire. Additionally, the existing water main serving the base is in need of replacement. Last year, Illinois American Water replaced the lines leading to the base providing new service to the feed. Replacing the 2 existing meters with one larger meter will increase the flow to the facility by 175% of existing capacity. This increased flow will prevent frequent pressure drops during high volume usage and maintain consistency for mechanical equipment throughout the base.
Section 00 01 10 - Table of Contents
Miscellaneous text in this section has been modified to:
TABLE OF CONTENTS
SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK
SECTION 00 10 00 - BID SCHEDULE, NOTES
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS AND NOTICES TOOFFERORS
SECTION 00 45 00 - REPRESENTATIONS & CERTIFICATIONS
SECTION 00 70 00 - CONTRACT CLAUSES
SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS
SECTION 01 00 00 - GENERAL REQUIREMENTS
W50S7T25BA0050001
ATTACHMENT 1 - SOW Hydrants dated 25Jul25
ATTACHMENT 2 - G12A - Fire Protection Systems_markup15Aug25
ATTACHMENT 3 - Bollards Detail
ATTACHMENT 4 - Main Water Valve Drawing
SECTION 00 10 00 NOTES
NOTES
1. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://www.SAM.gov.
2. Facsimile transmission of bid is not authorized. Electronic submission of bids will not be accepted.
3. All information relating to this IFB, including pertinent changes/amendments and information will be posted on web site: http://www.SAM.gov. For security reasons, all potential offerors, plan rooms and printing companies are required to be registered in the GSA System for Award Management (SAM) database. Firms can register via the SAM internet site at https://www.sam.gov/portal/public/SAM/.
Interested bidders are required to submit their representations and certifications at the same site.
4. Delete if there is no Cost Limitation. Reference DFARS Provision 252.236-7006, Cost Limitation- There is a $XXX limitation on CLIN insert [1] Exceeding this amount will make your bid non-responsive.
5. A complete bid package must contain the following:
(a) Offer, Standard Form (SF) 1442 front and back signed
(b) Section 00 10 00 Bid Schedule - all items must be priced
(c) A Bid Bond and Power of Attorney is required along with the bid on the due date. In accordance with DoD Deviation2020-O0016, electronic signatures and electronic, mechanically applied, or printed dates may be used and shall be considered original signatures and dates. The bid bond must be on a SF24 form.
Rejection of a bid bond shall be in accordance with FAR 28.101-4Noncompliance with bid guarantee requirements.
(d) Section 00 45 00, Representations and Certifications completed and return only additional certifications found in this section In addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications at www.sam.gov.
(e) When completing the "Offeror" portion of the SF 1442(Blocks 14 - 20), an official having the authority to contractually bind the company must sign the SF 1442 in accordance with FAR 4.102. One copy of the SF1442 is required to have an original signature.
(f) All amendments to the solicitation must be acknowledged.
(g) Mark the front of the envelope with the following: "BID No. W50S7T-25-B-A005", and the Name and Address of Bidder. See Block 13A of SF 1442 for required number of copies.
6. Joint Venture Requirements - Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with FAR4.102(d). Each joint venture partner shall submit evidence satisfactory to the Contracting Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the System for Award Management (SAM)database. Applicable to set-aside solicitations: Joint Ventures must meet applicable size standards (See FAR Subpart 19.1). Submit with the proposal any size determination for the Joint Venture entity received from the Small Business Administration. A Joint Venture where-in one party is not a small business may be referred to the Small Business Administration (IAW FAR 19.302 (b)) to determine eligibility. All questions regarding Joint Ventures must be directed to the Small Business Administration (SBA) and not the Contracting Officer.
A small business joint venture offeror must submit, with its offer, the representation required in paragraph (c) of FAR solicitation provision 52.212-3, Offeror Representations and Certifications- Commercial Products and Commercial Services, and paragraph (c) of FAR solicitation provision 52.219- 1, Small Business Program Representations, in accordance with 52.204-8(d)and 52.212-3(b) for the following categories:
(A) Small business;
(B) Service-disabled veteran-owned small business;
(C) Women-owned small business (WOSB)under the WOSB Program.
(D) Economically disadvantaged women-owned small business under the WOSB Program; or
(E) Historically underutilized business zone small business.
End of Section 00 10 00
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
The following CLIN(s) / SLIN(s) / ELIN(s) were modified:
INFORMATION FROM TO CHANGED BY
Product Service Code J045 Product Service Code Y1PZ
INFORMATION FROM TO CHANGED BY
Product Service Code J045 Product Service Code Y1PZ
INFORMATION FROM TO CHANGED BY
Product Service Code J045 Product Service Code Y1PZ
INFORMATION FROM TO CHANGED BY
Product Service Code J045 Product Service Code Y1PZ
INFORMATION FROM TO CHANGED BY
Product Service Code J045 Product Service Code Y1PZ
Section 00 21 00 - Instructions
Miscellaneous text in this section has been modified to:
1. Description of the Project: Replace Fire Hydrants. The contractor shall provide all materials, tools, equipment, labor, and supervision to replace fire hydrants. There are four existing fire hydrants on base that are not functioning or have been damaged and are in need of replacement. Infrequent use and sediment buildup has led to corrosion and deterioration of the fire hydrants. Hydrants need to be serviceable to prevent loss of life and material damage in the event of a fire. Additionally, the existing water main serving the base is in need of replacement. Last year, Illinois American Water replaced the lines leading to the base providing new service to the feed. Replacing the 2 existing meters with one larger meter will increase the flow to the facility by 175% of existing capacity. This increased flow will prevent frequent pressure drops during high volume usage and maintain consistency for mechanical equipment throughout the base.
2. Instructions to Bidders:
2.1. You are invited to submit a bid in response to our Invitation for Bids (IFB) entitled W50S7T-25-B- A005 entitled Replace Fire Hydrants, Project Number FY25_LSRM_08, at 182nd Airlift Wing, 2416 S. Falcon Blvd, Peoria, IL 61607.
2.2. As a result of this solicitation, the Government intends to award a Firm Fixed Price (FFP) contract resulting from this solicitation to the responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.
2.3. This solicitation is set-aside 100% for small businesses.
3. NOTICEOF PRE-BID CONFERENCE AND SITE VISIT:
3.1. A pre-bid conference will be conducted on 30 July 2025 1000 hours for the purposes of briefing on the bid requirements and answering questions regarding this solicitation. This conference will be held at 182nd Airlift Wing, 2418 S. Mustang St, Building 728 Base Supply, Peoria, IL 61607.
Interested Contractors are highly encouraged to attend the pre-bid conference. The site visit will be held following the conference.
3.2. Due to security conditions, all offerors must register to attend this conference and site visit. Email the following information for all attendees to SMSgt Ben Yeutson or Mr. Jason Shallenberger at the following addresses: benjamin.yeutson@us.af.mil or jason.shallenberger@us.af.mil Firm Name and Telephone Number Visitor's Name and Social Security No.
Drivers License Citizenship
3.3. This information must be provided in advance,2 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government's denial of your access to the pre-bid conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.
3.4. Visitors must pick up their passes at the Installation's Main Entry Gate prior to arrival. You will be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid REAL ID and Driver's License, (3) Proof of Insurance for Vehicle, (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
3.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
3.6. A record of the conference shall be made and furnished to all prospective bidders via posting at www.SAM.gov. The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
4. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS:
4.1. Submit all questions in the format shown below by email to the contracting office at the addresses show below. Do NOT contact A-E or Engineering personnel directly. Doing so will only delay your answer. All questions must come through the Contracting Office.
Subject Line: Reference No. SOLICITATION WXXXXX-XX-B-XXXX Email: INSERT 2 EMAIL ADDRESSES
PRE-BID INQUIRY FORMAT
Date of Bid Inquiry: _______________ From: ______________________________ Company Name: _____________________________ Address:_____________________________________________________________________ Phone Number: _____________________________ Email address:__________________________________________________________________ Bid Inquiry: (Please clearly state your question) (If sent via an attachment word docs are preferred to facilitate posting of answers to the master Q&A document.)
4.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc.
must be requested in writing and with sufficient time allowed for a reply to reach bidders before the submission of their bid.
4.3. All questions and requests for information (RFI) must be received NOT LATER THAN the fifth working day at noon prior to bid opening.
OFFERORS ARE STRONGLY ENCOURAGED TO SUBMITQUESTIONS EARLY IN THIS
PROCESS.
4.4. Any changes to the drawings, specifications, etc. will be issued in the form of an amendment.
However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment but rather as a response to the RFI on SAM.gov at https://www.
SAM.gov.
4.5. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of bids.
4.6. [1] For security reasons, all technical and engineering data related to this solicitation will be distributed using the Contract Opportunities (SAM.gov) system. Plans and specifications are locked on SAM.gov and require Contractors to request explicit access from the Contracting Officer OR export-controlled access through DLA. See complete instructions on SAM.gov. SAM.gov is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with SAM.gov before accessing the system.
4.6.1. Amendments, if/when issued will be posted to www.SAM.govfor electronic downloading. This will normally be the only method of distributing amendments prior to closing; therefore, it is the offerors responsibility to check the website periodically for any amendments to the solicitation. Websites are occasionally inaccessible due to various reasons.
5. BID REPOSITORY AND BID OPENING:
5.1 Hand Carried Proposals/ Invitations
5.1.1 Hand carried proposals must be mailed or carried to:
182 Airlift Wing/ Base Contracting
2416 S. Falcon Blvd
Peoria, IL 61607
5.2 Offerors are strongly cautioned that approval to enter the base must be obtained prior tot he closing date for receipt of proposals. Follow the procedures outlined in paragraph 3.2 for entry. Delays are probable at the entry point and should be accounted for. Late receipt of proposals due to base entry delays may not be deemed excusable and the Contracting Officer may declare the proposal late and remove it from consideration.
5.2.1. The Government will not be responsible for bid submissions delivered to any location or by any method other that stated above. Offerors are responsible for submitting bids in sufficient time to be received by the Government in accordance with the instructions provided.
5.2.2. Bids that are considered late will be processed in accordance with FAR 14.304(b).
5.3 The bid opening will occur at the time and date specified in Block 13 of the SF1442 at 2418 S.
Mustang St, Building 728, Room 18 LRS
. All interested offerors and their major subcontractors are encouraged to Classroom, Peoria, IL61607 attend the bid opening.
6. WAGE DETERMINATION:
Construction Wage Rates are applicable to this project are general decision numberIL20250014 modification 4 dated 17 July 2025 as shown in Section 00 73 00.
7. BID PREPARATION EXPENSES AND PRE-CONTRACT COSTS:
This IFB does not commit the Government to pay costs incurred in preparation and submission of bids or for other costs incurred prior to award of a formal contract.
8. NG AGENCY PROTEST PROGRAM:
NG Agency Protest Program is intended to encourage interested parties to seek resolution of their concerns with the National Guard (NG) as an Alternative Dispute Resolution forum, rather than filing a protest with the Government Accountability Office (GAO) or other external forum Contract award or performance is suspended during the protest to the same extent, and within the same time periods as if filed at the GAO. The NG protest decision goal is to resolve protests within 35 calendar days from filing. An agency protest may be filed with either the Contracting Officer or the NG Agency's Protest Decision Authority, but not both, in accordance with NG protest procedures.
To be timely, the protests must be filed with the periods specified in FAR 33.103. To file a protest under the NG Agency Protest Program, the protest must request resolution under that program and be sent to the address below:
National Guard Bureau Office of the Director of Acquisitions/ Head of Contracting Activity
ATTN: NGB-AQ-O
111 S. George Mason Dr.
Arlington, VA 22204
Email: ng.ncr.ngb-arng.mbx.ngb-task-order-ombudsman@mail.mil
All other agency-level protests should be sent to the Contracting Officer for resolution at the address in the solicitation. See FAR clause 52.233-2.
NG Public-facing, general Protest information is found at:
https://www.nationalguard.mil/Leadership/Joint-Staff/Special-Staff/Director-of-Acquisitions/
Directorate of Acquisitions information for the contracting enterprise is found at https://gko.portal.ng.mil/ngb/STAFF/D01/D01/OI/Protests%20and%20Complaints/Forms/AllItems.aspx
Section 00 72 00 - General Conditions
The following clauses were modified:
252.236-7001Contract Drawings and Specifications.Aug 2000 hereby reads as follows:
W50S7T25BA0050001
https://www.nationalguard.mil/Leadership/Joint-Staff/Special-Staff/Director-of-Acquisitions/
CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall-
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
Attachment 1 - SOW_Hydrants
Attachment 2 - G12A - Fire Protection Systems_markup15Aug25
Attachment 3 - Bollards Detail
Attachment 4 - Main Water Valve Drawing
Word Document - Same name
PDF Document - Same name
PDF Document - Same name
PDF Document - Same name
Attachmen t 1
Attachmen t 2
Attachmen t 3
Attachmen t 4
(End of clause)
Section 00 73 00 - Supplementary Conditions
Miscellaneous text in this section has been modified to:
"General Decision Number: IL20250014 08/15/2025
Superseded General Decision Number: IL20240014
State: Illinois
Construction Types: Heavy and Highway
Counties: Fulton, Hancock, Henderson, Knox, McDonough, Mercer, Peoria, Stark, Tazewell and Warren Counties in Illinois.
KNOX, PEORIA, TAZEWELL (N 1/3) & WARREN COUNTIES:
HEAVY CONSTRUCTION PROJECTS (including Sewer & Water Line
Construction & Drainage Projects) & HIGHWAY CONSTRUCTION
PROJECTS (excluding tunnels, building structures in rest area projects, and railroad construction; bascule, suspension & spandrel arch bridges; bridges designed for commercial navigation; bridges involving marine construction, other major bridges).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |. Executive Order 14026 |
|into on or after January 30, | generally applies to the |
|2022, or the contract is | contract. |
|renewed or extended (e.g., an |. The contractor must pay |
|option is exercised) on or | all covered workers at |
|after January 30, 2022: | least $17.75 per hour (or |
| | the applicable wage rate |
| | listed on this wage |
| | determination, if it is |
| | higher) for all hours |
| | spent performing on the |
| | contract in 2025. |
|If the contract was awarded on|. Executive Order 13658 |
|or between January 1, 2015 and| generally applies to the |
|January 29, 2022, and the | contract. |
|contract is not renewed or |. The contractor must pay all|
|extended on or after January | covered workers at least |
|30, 2022: | $13.30 per hour (or the |
| | applicable wage rate listed|
| | on this wage determination,|
| | if it is higher) for all |
| | hours spent performing on |
| | that contract in 2025. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the
Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/03/2025
1 02/21/2025
2 05/30/2025
3 06/13/2025
4 07/18/2025
5 08/15/2025
CARP0004-009 05/01/2025
HENDERSON and MERCER COUNTIES
Rates Fringes
CARPENTER........................$ 38.00 35.16
CARP0174-003 05/01/2025
STARK COUNTY
Rates Fringes
CARPENTER........................$ 40.28 38.95
CARP0237-003 05/15/2020
FULTON and TAZEWELL (Southern 2/3) COUNTIES
Rates Fringes
CARPENTER........................$ 36.16 30.07
CARP0237-013 05/15/2020
FULTON, KNOX, PEORIA, AND TAZEWELL (Northern 1/3) COUNTIES
Rates Fringes
CARPENTER........................$ 36.16 30.07
PILEDRIVERMAN....................$ 36.16 30.07
CARP0270-010 05/15/2020
MCDONOUGH AND WARREN COUNTIES
Rates Fringes
CARPENTER........................$ 37.66 28.57
PILEDRIVERMAN....................$ 37.66 28.57
CARP0270-011 05/15/2020
HANCOCK COUNTY
Rates Fringes
CARPENTER........................$ 35.05 28.57
PILEDRIVERMAN....................$ 35.05 28.57
ELEC0034-006 03/01/2018
FULTON (Fairview, Farmington, Joshua, Canton, Orion, Putnam, Buckheart, Banner, Farmers, Bernadotte, Lewistown, Liverpool, Vermont, Pleasant, Isabel, Waterford, Astoria, Woodland, and
Kerton Twps), PEORIA, STARK (West Jersey, Essex, and Valley
Twps), & TAZEWELL Counties
Rates Fringes
ELECTRICIAN......................$ 36.51 21.19
ELEC0034-007 06/01/2022
FULTON (Cass, Deerfield, Ellisville, Harris, Lee, Union, Young, & Hickory Twps), HENDERSON, KNOX, MCDONOUGH (Blandinsville, Prairie City, Emmet, Tennesee, Scotland, Sciota, Bushnell, Chalmers Twps), MERCER (Ohio Grove, North Henderson, and Suez twps), and WARREN Counties
Rates Fringes
ELECTRICIAN......................$ 38.32 24.24
ELEC0051-002 01/01/2024
FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, MERCER (N.
Henderson & Suez Twps), PEORIA, STARK, TAZEWELL, and WARREN
COUNTIES
Rates Fringes
Line Construction
Groundman/Equipment
Operator (All crawler type equipment larger than D-4, 15 ton crane or larger).....$ 52.63 32.5%+7.25
Groundman/Truck Driver......$ 39.92 32.5%+7.25
Lineman and Substation
Technician..................$ 58.58 32.5%+7.25
* ELEC0145-006 06/02/2025
MERCER COUNTY (Except Ohio Grove, North Henderson, and Suez
Twps)
Rates Fringes
CABLE SPLICER....................$ 47.00 28.64
ELECTRICIAN......................$ 46.00 28.56
ELEC0145-007 12/04/2023
MERCER COUNTY (Except North Henderson and Suez Twps)
Rates Fringes
Line Construction
Cable Splicer...............$ 53.12 33%+7.00
Dynamiter...................$ 43.92 33%+7.00
Groundman Equipment
Operator....................$ 41.61 33%+7.00
Groundman Truck Driver......$ 36.15 33%+7.00
Groundman...................$ 34.64 33%+7.00
Lineman, Technician, Heavy
Equipment Operator..........$ 52.67 33%+7.00
FOOTNOTE:
A. PAID HOLIDAYS: Memorial Day, Independence Day, Labor Day, and Thanksgiving Day
ENGI0150-021 06/01/2024
MERCER COUNTY
Rates Fringes
OPERATOR: Power Equipment
Group 1.....................$ 42.75 39.45
Group 2.....................$ 40.75 39.45
Group 3.....................$ 38.10 39.45
Group 4.....................$ 37.05 39.45
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Crane (Friction or Hydraulic, regardless of size or attachments); Tow or Push Boat
GROUP 2: Asphalt Heater-Planer Unit; Asphalt Paver; Asphalt
Paver Screed; Asphalt Plant; Automatic Curbing Machine;
Backfiller (throw bucket); Blastholer Self-Propelled Rotary
Drill or Similar Machines; Boom Tractor or Side Boom;
Boring Machine (Directional, Vertical or Horizontal);
Building Hoist (1,2 or 3 drums); Caisson Auguring Machines;
Central Redi-Mix Plant; Chip Spreader; Cleaning & Priming
Machine; Combination Backhoe Front End Loader; Combination
Concrete Finishing Machine and Float; Concrete Breaker or
Hydro-Hammer; Concrete Conveyor or Pump; Concrete Paver;
Concrete Spreader; Concrete Wheel Saw (Large self-propelled); Crusher (Stone, Concrete, Asphalt, etc.);
Curing-Tinning Machine; Dipper Dredge Crane man; Dipper
Dredge Operator; Dual Purpose Truck (Boom, Winch, etc.);
Excavator; Farm-Type Tractor Operating Scoop or Scraper or with Power Attachment; Forklift (6000 lb. capacity);
Grader, Motor Grader, Motor Patrol, Auto Grader, Form
Grader, Pull Grader, Sub Grader, Elevating Grader; Group
Equipment Greaser; Guard Rail Post Driver; Hoists;
Hydraulic Dredge Leverman or Engineer; Hydro-Vac Truck
Mounted or Pull Type, and Similar Equipment; Laser Screed;
Loader (Track, Rubber Tire or Articulated); Locomotive
Engineer; Mechanic-Welder; Mechanical Loaded Log Chippers or Similar Machines; Milling Machine; Mucking Machine; Pile
Driver; Pipe Bending; Pug Mill; Road Widener-Shoulder
Spreader; Scraper (self-propelled); Self-Propelled Roller or Tire Roller (on Asphalt or Blacktop), Sheep Foot or Pad
Foot Compactor; Shovel; Slip Form Paver; Steel Track-Type
Tractor (Dozer, Push Cat, etc.); Transfer or Shuttle Buggy;
Trenching Machine (40 H.P. & over); Work Boat.
GROUP 3: Articulated Off-Road Haul Unit; Asphalt Booster;
Boiler (Engineer or Fireman); Conveyor Over 20 H.P.;
Distributor; Driver on Truck Crane or Similar Machines;
Elevator; Farm-Type Tractor (Without Power Attachment);
Fireman & Pump Operator at Asphalt Plant; Forklift (Less than 6000 lb. capacity); Grout Pump; Light Plant;
Mechanical Broom; Mud Jack; Self-Propelled Roller (Other than listed in Group 2); Straddle Carrier; Trench Machine
(Under 40 H.P.).
GROUP 4: Air Compressor (400 C.F.M. or over); Compact
Loader (Rubber Tire, Track & Utility); Engine Driven
Welding Machine; Mechanical Heater (other than steam boiler); Small Outboard Motor Boat (Safety Boat & Life
Boat); Water Pump (More than one well point pump).
ENGI0649-002 04/01/2025
FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, PEORIA, STARK,
TAZEWELL, and WARREN COUNTIES
Rates Fringes
OPERATOR: Power Equipment
Group 1.....................$ 47.79 43.42+A
Group 2.....................$ 44.09 43.42+A
Group 3.....................$ 38.03 43.42+A
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Cranes: Overhead Cranes; Hydro Crane; Shovels;
Crane type Backfiller; Tower Cranes-Mobile, Crawler, Stationary; Derricks, Hoist (3 drum); Draglines; Drott
Yumbo & similar types considered as Cranes; 360 Degrees
Swing Excavator, Backhoe; Derrick Boats; Pile Driver and
Skid Rigs; Clam Shell; Locomotive Cranes; Road Pavers
(Single Drum, Dual Drum, Tri Batcher); Motor Patrol & Power
Blades (Dunmore, Elevating & similar types); Mechanics;
Central Concrete Mixing Plant Operator; Asphalt Batch Plant
Operator and Plant Engineer; Gradall; Caisson Rigs; Skimmer
Scoop, Koehring Scooper; Dredges (all types); Hoptoe; All
Cherry Pickers; Work Boat; Ross Carrier; Helicopter; Dozer;
Tournadozer; Tournapulls (all & similar types); Concrete and all recycle machines, Multiple Unit Earth Movers; 75 cents per hour for each scoop over one; Scoops (all sizes);
Pushcats; Endloaders (all types); Asphalt Surfacing
Machine; Slip Form Paver; Rock Crusher; Material Crusher
(outside pits and quarries); Screening Plants (outside pits and quarries); Tunnel Boring Machine; Heavy Equipment
Greaser (Top Greaser on Spread); CMI, Auto Grade, CMI Belt
Placer (3 track & similar types); Side Booms; Starting
Engineer on Pipeline or Construction (eleven 11 pieces or more); Asphalt Heater & Planer Combination; Wheel Tractors with Dozer, Hoe or End Loader attachements; CAT Earthwork
Compactors and similar types; Blaw Knox Spreader & similar types; Trench Machines; Pump Crete, Belt Crete, Squeeze
Crete, Screw Type Pumps & Gypsum; Creter Crane; Concrete
Pump Truck; Formless Finishing Machines; Flaherty Spreader or similar types; Screedman on Laydown Machine; Vermeer
Concrete Saw; Laser Screed; Span Saw; Dredge Leverman;
Dredge Engineer; Lull or similar type; Hydro-Boom Truck;
Guard Rail Machine.
GROUP 2: Bulker & Pump; Power Launches; Boring Machine &
Pipe Jacking Machine; Dinkeys; Carts, powered haul unit for a boring machine; P-H one Pass Soil Cement Machines and similar types: Wheel Tractor; Back Fillers; Euclid Loader;
Fork LIfts; Jeep with Ditching Machines or other attachments; Tuneluger; Automatic Cement & Gravel Batching
Plants; Mobile Drills Soil Testing and similar types);
Pugmill with Pump; All 1 and 2 Drum Hoists; De-watering
Systems; Straw Blower; Hydro Seeder; Bump Grinders, Self
Propelled; Assistant Heavy Equipment Greaser; Apsco
Spreader Tractors (Track-Type w/o Power Units pulling
Rollers); Rollers on Asphalt, Brick, or Macadam; Concrete
Breakers; Concrete Spreaders; Cement Strippers; Cement
Finishing Machines & CMI Texture & Reel Curing Machines;
Vibro-Tampers & similar types self-propelled; Mechanical
Bull-Floats; Self-Propelled Concrete Saw; Truck Mounted
Power Saws; Curb Cutters; Mixers over 3 bags to 27E; Winch
& Boom Trucks; Tractor pulling Power Blade or Elevating
Grader; Porter Rex Rail; Clary Screed; Mule pulling
Rollers; Pugmill w/o Pump; Barber Greene or similar
Loaders; Track Type Tractor with power unit attached;
Fireman; Spray Machine on paving; Curb Machine; Paved Ditch
Machine; Power Broom; Self-Propelled Sweepers; Self-
Propelled Conveyors; Power Subgrader; Oil Distributor;
Straight Tractor; Truck Crane Oiler; Truck Type Oilers;
Directional Boring Machine; Horizontal Directional Drill;
Articulating End Dump Vehicles; Starting Engineer (6 to 10 pieces).
GROUP 3: Straight Framed Truck and Truck Mounted Vac Unit, Starting Engineer (3 to 5 pieces); Trac Air Machine w/o attachments; Rollers, 5 tons & under on earth & gravel;
Form Grader; Bulk Cement Plant; Oilers.
- Escalated Rate on Crane, Derrick Booms, and Tower Cranes:
Additional $1.00 per hour over scale when Crane or Derrick is positioned 50 ft. or more above adjacent ground level or water level. $.05 per hour, per foot, over 90 feet including jib. $0.02 per hour, per ton - over 50-ton capacity.
- Operating engineers who operate Lattice Boom Crawler
Cranes, Lattice Boom Truck Cranes, Telescopic Boom Cranes less than 17.5 Tons, Tower Cranes, Overhead Cranes and have been Certified by hte National Commission for the
Certification of Crane Operators on the equipment they operate shall receive $1.60 per hour over scale.
A. On designated Hazardous Waste jobs, operators shall receive:
Level A add $4.00 to the appropriate group rate; Levels B and
C add $3.00 to the appropriate group rate; and Level D add
$2.00 to the appropriate group rate.
IRON0046-005 05/01/2024
FULTON COUNTY (Southern tip including Marbletown Astoria, &
Summum Twps)
Rates Fringes
IRONWORKER.......................$ 37.60 32.94
* IRON0111-004 07/01/2025
KNOX (Galesburg and area North thereof), MERCER (except
Southwest Part), and WARREN (Northwest Part) COUNTIES
Rates Fringes
IRONWORKER.......................$ 38.25 32.28
IRON0112-004 05/01/2025
FULTON (Eastern 2/3), KNOX (South and East of Galesburg), PEORIA, STARK, and TAZEWELL COUNTIES
Rates Fringes
IRONWORKER.......................$ 45.48 34.13
IRON0577-006 06/01/2024
FULTON (North of Summum & Marbletown Twps, West 1/3), HANCOCK, HENDERSON, KNOX (West and Southwest of Galesburg), McDONOUGH, MERCER, and WARREN (except Northwest Part) COUNTIES
Rates Fringes
IRONWORKER.......................$ 34.05 25.30
LABO0165-002 05/01/2024
PEORIA and TAZEWELL (Northwest) COUNTIES
Rates Fringes
LABORER
Group 1.....................$ 35.70 36.42
Group 2.....................$ 36.00 36.42
Group 3.....................$ 36.45 36.42
LABORER CLASSIFICATIONS
GROUP 1 - General Laborer - Laying of temporary gas, oil, air, and water lines; All Laborer Work pertaining to
Asphalt and Asphalt Plants if needed; Waterproofing
Membrane Systems for bridge decks and waterproofing for box culverts on site; Laying, placing, and installation of all steel casing, corrugated casings, multiple plate and precast concrete and all other material used for casing, tunnels and tunnel lining; Removal of snap ties, the placing and removing and tending of barricades, concrete barricade wall, flares and signal lights; Maintenance of
Nelson Heaters; Dirt fill jobs, spotter and grade employee and signal employee; Scaffolding; Temporary Fencing;
Placing of Concrete to grade by any mode or method;
Carpenter Tenders, the conveying, handling, unloading and loading, hoisting, assorting of all lumber, all laborer work required around carpenters including the clean up after carpenters; Horizontal Directional Drill Locator;
Waterproofing with cold stuff; Bricklayer Tenders; Cement
Mason Tender; Curing all concrete by hand method; Drive stakes and string lines for all machinery; Concrete Form
Dismantlers; Handling and maintaining all lights; flares and flasher flares; Flagman; Landscaping on all jobs, the loading, unloading, distribution, planting, and placing of trees, shrub, sod, and seeding on work covered by the agreement; Covering of Concrete in any manner; High
Pressure Nozzle (water blast); Pile Driver Tenders;
Surveyor Helper; Tool Crib Man; Water Carrier; Expansion joint assembler; All other excavating; Deck Hand, Dredge
Hand, and Shore Laborer; Unloading and Distributing of
Rebars; All Power Operated Tools and Chain Saws; Curb
Asphalt Maching Operator; Asphalt Kettlemen and Carriers;
Waterproofing with hot stuff; Cement Men and Sack Shakers;
Chipping Hammer Man; Kettlemen and Carriers or men handling hot stuff; Powder Man Helper; Power Concrete Saw; Power
Form Tampers; Rig Men; Signaling and spotting of rigs and equipment; Walk behind concrete breaker; Stripping Concrete
Forms with composite crew of laborers and carpenters; all other work not listed below
GROUP 2 - Skilled Laborer - Jackhammer & Drill Operator;
Gunite Pump and Pot Man; Puddlers, Vibrator Men; Wire
Fabric Placer; Sandblast Pump and Pot Man; Strike Off
Concrete; Unloading, handling and carrying of all creosoted piles, ties, or timer; Concrete Burning Bars; Power
Wheelbarrows or Buggies; Asphalt Raker; Bricksetters;
Cutting Torchmen (elec. and acetylene); Men setting lines to level forms; Form Setters; Gunite Nozzle Man and
Sandblasting Nozzle Man; Powder Man; Rip-rapping (by hand)
GROUP 3 - Abestos Abatement Worker; Hazardous Waste Worker
(including maintaining of manifest sheet); Lead Base Paint
Abatement Worker
LABO0231-002 05/01/2024
FULTON and TAZEWELL (Southeast) COUNTIES
Rates Fringes
LABORER..........................$ 38.50 33.45
LABO0231-005 05/01/2024
HANCOCK AND MCDONOUGH COUNTIES
Rates Fringes
LABORER..........................$ 33.50 30.13
LABO0309-003 01/01/2024
MERCER COUNTY
Rates Fringes
LABORER
GROUP 1.....................$ 33.77 23.60
GROUP 2.....................$ 34.27 23.60
GROUP 3.....................$ 34.90 23.60
LABORER CLASSIFICATIONS
GROUP 1: Flagman, Dumpman, Spotter, Broom Man, Removal of
Trees, Fencing Laborers, Cleaning of Forms or Lumber (In
Bone Yard), Moving and/or Maintenance of Flares and
Barricades, Operation of all Hand, Electric, Air, Hydraulic, or Mechanically Powered Tools Under the
Jurisdiction of the Laborers; Including Jackhammers, Tampers; Air Spades, Augers, Concrete Saws, Chains Saws, Utility Saws, Rock Drills, Vibrators, Mortar Mixer, Power and Hand Saw (When Cleaning Timber), General Laborers (Not
Elsewhere Covered), Craft-Tender, Material Checker, Material Handler, Form Handler, Concrete Dumper, Puddler, Explosives Handler, Center Strip, Reinforcing in Concrete, Wire Mesh Handler and Installer, Prime Mover or Any
Mechanical Device Taking the Place of Concrete Buggy or
Wheel-Barrow, Sandpoint Setter, Asphalt Kettleman, Sheeting
Hammer Drivers, Laying and Joining of telephone Conduit, Gas Distribution Men, Pipe Setter On laterals, Drain Tiles, Culvert Pipe, and Storm Sewer Catch Basin Leads, Catch
Basins, Manholes, Batch Dumpers, Tank Cleaners, Cofferdam
Worker, Bankman On Floating Plant, Jointman with
Pipelayers. Back-Up Man (Corker, Joint Maker) With Pipe
Setter on Sewer and Water Mains, Batterboard Man or Laser
Operator on Sewer and Water Main, Laborer in Ditch, or
Tunnel, on Sewer or Water Mains and Telephone Conduit, Cutters, Burners, Torchman, Gravel Box Man, Asphalt Plant
Laborer, Concrete Plant Laborer, Deck Hand, Unloading of
Steel and Rebar, Laser Beam Operator, Wrecking Laborers
GROUP 2 - Asphalt Raker or Luteman, Head Form Setter, Head
Dynamite Man (Powderman) Head String or Wireline Man (On
Paving), Pipe Setter On Sewer or Water Main, Gunnite Nozzie
Man, Asphalt Or Concrete Curb Machine Operator, Head Grade
Man, Head Tunnel Miner, Concrete Burning Machine Operator, Coring Machine Operator, Welder, Asbestos Abatement and
Hazardous Waste Workers
GROUP 3 - Concrete Specialist
LABO0538-001 05/01/2024
HENDERSON, KNOX, WARREN, AND STARK (WEST) COUNTIES
Rates Fringes
LABORERS
General Laborer.............$ 35.23 28.10
Skilled Laborer.............$ 36.23 28.10
LABORER CLASSIFICATIONS
General Laborer: All classifications not listed below.
Skilled Laborer: Flaggers; Traffic Control and all associated work; Handling of materials treated with oil, creosote, asphalt and/or foriegn material harmful to skin or clothing; Track Laborers; Chloride Handlers; Unloading and
Laborers with Steel Workers and Re-bars; Concrete Workers
(wet); Batch Dumpers; Mason Tenders; Kettle and Tar Men;
Plastic Installers; Scaffold Workers; Motorized buggies or motorized unit used for wet concrete or handling of building materials; Laborers with de-watering systems;
Sewer workers plus depth; Vibrator Operators; Motor Mixer
Operators; Cement Silica, clay, fly ash, lime and plasters, handlers (bulk or bag); Cofferdam Workers plus depth;
Concrete paving, placing, cutting and tying of reinforcing;
Deckhand, dredge hand and shore laborers; Backmen on floating plant; Asphalt Workers with machine and layers;
Grade Checker; Power Tools; Stripping of all concrete forms except paving forms, dumpmen and spotters, when necessary;
Caisson Workers plus depth; Gunnite Nozzle Men; Tunnel
Helpers in free air; Rod and Chainmen; Welders, Cutters, Burners, and Torchmen; Chainsaw Operator; Paving Breaker, Jackhammer and Drill Operator, Layout man and /or Tile
Layer; Steel Form Setters - street and highway, Air Tamping
Hammerman; Signalman on Crane Concrete Saw Operator;
Screedman on Asphalt Pavers; Front End Man on Chip
Spreader; Multiple Concrete Duct; Luteman, Asphalt Raker;
Curb Asphalt Machine Operator.
LABO0996-003 05/01/2024
STARK COUNTY (East)
Rates Fringes
LABORER
GROUP 1.....................$ 39.17 28.01
GROUP 2.....................$ 40.17 28.01
LABORER CLASSIFICATIONS
GROUP 1: All classifications not listed below
GROUP 2: Dynamite Man; Asbestos Abatement Worker and
Hazardous Waste Worker; and Lead Base Paint Worker
PAIN0030-010 06/01/2023
BUREAU, FORD, HANCOCK, LA SALLE, LIVINGSTON, MCDONOUGH, MCLEAN,
PUTNAM AND STARK COUNTIES
Rates Fringes
PAINTER
Brush, Roller, Pressure
Roller, Spray, Airless
Spray, Sandblasting, Taper, Drywall
Taper/Finisher, Structural
Steel, and Bridges..........$ 40.00 26.90
PAIN0157-001 06/01/2023
FULTON, MARSHALL, MASON, PEORIA, SCHUYLER, TAZEWELL AND
WOODFORD COUNTIES
Rates Fringes
PAINTER
Brush, Spray, Pressure
Roller, Sandblasting, Bridges, & New Structural
Steel Work..................$ 40.00 26.90
PAIN1178-003 06/01/2022
HENDERSON, KNOX, MERCER, and WARREN COUNTIES
Rates Fringes
PAINTER
Bridges.....................$ 32.00 17.37
Brush and Roller............$ 30.00 17.37
Spray, Structural Steel, &
Sandblasting................$ 30.50 17.37
PLAS0018-011 05/01/2017
FULTON (Northwestern Part), KNOX, MERCER (Southeastern Corner), and WARREN COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 29.00 20.10
PLAS0018-012 06/01/2015
STARK COUNTY
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 36.70 22.08
PLAS0018-013 05/01/2021
FULTON (Except Northwest Part), PEORIA, and TAZEWELL COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 32.98 30.70
PLAS0018-028 05/01/2016
HANCOCK, HENDERSON (Southern half), and MCDONOUGH COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 28.64 24.57
PLAS0018-037 01/01/2020
HENDERSON (Northern Half) and MERCER (Except Southeastern
Corner) COUNTIES
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 28.52 24.04
TEAM0371-003 05/01/2024
MERCER COUNTY
Rates Fringes
TRUCK DRIVER
Group 1.....................$ 43.31 24.56
Group 2.....................$ 43.89 24.56
Group 3.....................$ 44.21 24.56
Group 4.....................$ 44.56 24.56
Group 5.....................$ 45.67 24.56
CLASSIFICATIONS:
GROUP 1: Drivers on 2 axles hauling less than 9 tons; air compressor & welding machines and brooms, including those pulled by separate units; Truck Driver Helper, warehouse employees; Mechanic Helpers; greasers and tiremen; pick-up trucks when hauling material, tools, or workers to and from and on the job site; and forklifts up to 6,000 lb capacity.
GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks;
Vactor Trucks or similar equipment when used for transportation purposes; Forklift over 6,000 lb.capacity;
winch trucks; and four axle combiation units.
GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; mechanics and working forepersons.
GROUP 4: Low Boy and Oil Distributors.
GROUP 5: Drivers who require special protective clothing while employed on hazardous waste work.
TEAM0627-002 05/01/2024
FULTON, HANCOCK, HENDERSON, KNOX, MCDONOUGH, PEORIA, STARK,
TAZEWELL, and WARREN COUNTIES
Rates Fringes
TRUCK DRIVER
GROUP 1.....................$ 43.24 24.27
GROUP 2.....................$ 43.83 24.27
GROUP 3.....................$ 44.10 24.27
GROUP 4.....................$ 44.49 24.27
GROUP 5.....................$ 45.59 24.27
CLASSIFICATIONS:
GROUP 1: Drivers on 2 axles hauling less than 9 tons; air compressor & welding machines and brooms, including those pulled by separate units; Truck Driver Helper, warehouse employees; Mechanic Helpers; greasers and tiremen; pick-up trucks when hauling material, tools, or workers to and from and on the job site; and forklifts up to 6,000 lb capacity.
GROUP 2: 2 or 3 axles hualing more than 9 tons but hauling less than 16 tons; A-frame winch trucks; hydrolift trucks;
Vactor Trucks or similar equipment when used for transportation purposes; Forklift over 6,000 lb.capacity;
winch trucks; and four axle combiation units.
GROUP 3: 2, 3 or 4 Axles hauling 16 tons or more; 5-Axles or more combination units; drivers on water pulls; articulated dump trucks; mechanics and working forepersons.
GROUP 4: Low Boy and Oil Distributors.
GROUP 5: Drivers who require special protective clothing while employed on hazardous waste work.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year,…