W50S7T-20-R-0005 - Amendment 1 - Repair MOGAS Station_26 Aug 20.pdf

PDF 197 KB Posted

Attached to
Repair MOGAS Station
Solicitation number
W50S7T-20-R-0005
Issued by

About this file

This document summarizes an amendment to a federal solicitation for repair and site preparation services at a MOGAS fuel station. The amendment updates the statement of work to demolish existing fuel tanks, install new tanks, and return bollards at the site. Delivery for the tank and bollard installation is required within 90 days to the 182nd Airlift Wing at Peoria, Illinois. The solicitation was issued by the Department of the Army Illinois Army National Guard to support operations at the fuel station. Attachments to the original solicitation were also updated to provide specifications for the tank demolition and new installations.

The amendment modifies the solicitation to prepare the site for new fuel tanks rather than repair the existing MOGAS station. New contract line items were added for demolishing the old tanks, installing the new tanks, and returning bollards to the site. The inspection and acceptance terms were also updated to reflect the changes. Relevant contract clauses and drawings indexes were amended. The opportunity remains with the Department of the Army Illinois Army National Guard to support operations at the fuel station located in Peoria, Illinois.

View the file

Other files

File Type Posted
W50S7T-20-R-9998 - Bid Opening Sign In Sheet.pdf PDF
W50S7T-20-R-9998 - Abstract.pdf PDF
Questions and Answers_as of 01 Sep 20.pdf PDF
W50S7T-20-R-0005-Repair MOGAS Station Solicitation_26 Aug 20.pdf PDF
Attachment 10 Ufc_3_301_01_2019.pdf PDF
Attachment 16 Fac. 820 - E6 - Schedules & Details.PDF PDF
Attachment 7 Mogas Markup Final.pdf PDF
Attachment 12 DLA Joint Sealant Procedures.pdf PDF
Attachment 13 Concrete Details.pdf PDF
Attachment 15 Fac. 820 - H7 - Fuel Tank Plan & Details.PDF PDF
Attachment 11 UFGS 32 01 19.61.pdf PDF
Attachment 14 - Bollards Detail.pdf PDF
Attachment 8 ufc_3_460_01_2019_c1.pdf PDF
Statement of Work_Repair MOGAS Station_Revised 25 Aug 20.pdf PDF
Attachment 17 Artist rendition of desired cantilever canopy.pdf PDF
Attachment 9 ufc_1_200_01_2019.pdf PDF
Questions and Answers_Repair MOGAS Station_as of 26 Aug 20.pdf PDF
Pre-Bid_Site Visit Sign-In Sheet - W50S7T-20-R-0005.pdf PDF
Pre-Bid Slides - Repair MOGAS Station - W50S7T-20-R-0005.pdf PDF
SOW_Repair MOGAS Station.pdf PDF
Attachment 1_MOGAS Station Layout_12 December 2019_1 Page.pdf PDF
Attachment 6_Site Utilities_12 December 2019_1 Page.pdf PDF
Attachment 4_MOGAS Storm Drains_12 December 2019_1 Page.pdf PDF
Attachment 2_MOGAS Station Trenching_12 December 2019_1 Page.pdf PDF
AF Form 66_ Repair MOGAS Station.pdf PDF
Attachment 5_Site Utilities_12 December 2019_1 Page.pdf PDF
Attachment 3_Curb Detail_13 December 2019_1 Page.pdf PDF
W50S7T-20-R-0005-Repair MOGAS Station Solicitation_05 Aug 20.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A. This amendment alters W50S7T-20-R-0005, Repair MOGAS Station, 182AW, Peoria, IL.

B. The purpose of this amendment is to incorporate the new Statement of Work (SOW) dated 25 Aug 2020 w hich supersedes the previous SOW and add Attachments 7-17 into the solicitation.

C. All others terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Aug-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S7T20R0005

X 9B. DATED (SEE ITEM 11)

05-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Aug-2020

CODE

USPFO IL 182 MISSION SUPPORT CONTRACTING

2418 S MUSTANG ST BLDG 728

PEORIA IL 61607-5004

W50S7T 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S7T20R0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

Global Changes

CLIN 0001 -- CLIN 0002

The PSC code Z1AA has been deleted.

CLIN 0001

The CLIN description has changed from Repair MOGAS Station to Prepare Site for

New Tanks.

The CLIN extended description has changed from:

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and non-personal services to Repair MOGAS Station located in Peoria, IL in accordance with the contract Statement of Work and supporting documents.

To:

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and non-personal services to Prepare Site for New Tanks in accordance with the contract Statement of Work and supporting documents.

CLIN 0002

This CLIN has been renumbered to CLIN 0004.

CLIN 0002 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 1 Job Demolish and Remove Existing Tanks

FFP

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and non-personal services to Demolish and Remove Existing Tanks in accordance with the contract Statement of Work and supporting documents.

FOB: Destination

SIGNAL CODE: A

NET AMT

CLIN 0003 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0003 1 Job Return and Install Bollards

FFP

Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and non-personal services to Return and Install Bollards in accordance with the contract Statement of Work and supporting documents.

FOB: Destination

SIGNAL CODE: A

NET AMT

DELIVERIES AND PERFORMANCE

The following Delivery Schedule for CLIN 0003 has been added:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

90 dys. ANP 1 182 AIRLIFT WING CES (F8P3SR)

SMSGT BENJAMIN REED

2416 S. FALCON BLVD

PEORIA IL 61607-5023

309-633-5268 FOB: Destination

F8P3SR

The following Delivery Schedule for CLIN 0004 has been added:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

90 dys. ANP 1 182 AIRLIFT WING CES (F8P3SR)

SMSGT BENJAMIN REED

2416 S. FALCON BLVD

PEORIA IL 61607-5023

309-633-5268 FOB: Destination

F8P3SR

INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for CLIN 0002:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

The following Acceptance/Inspection Schedule was added for CLIN 0003:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Statement of Work, Repair MOGAS Station, 10 Jun 20, 5 pages Attachment 1 – MOGAS Station Layout, 12 Dec 19, 1 page Attachment 2 – MOGAS Station Trenchin, 12 Dec 19, 1 page Attachment 3 – Curb Detail, 13 Dec 19, 1 page Attachment 4 – MOGAS Storm Drains, 12 Dec 19, 1 page Attachment 5 – Site Utilities, 12 Dec 19, 1 page Attachment 6 – Site Utilities, 12 Dec 19, 1 page AF Form 66 – Schedule of Material Submittals, 10 Jun 20, 1 page

ADDED per Amendment 1:

Attachment 7 – MOGAS Markup Final Attachment 8 – UFC 3-460-01_2019_c1 Attachment 9 – UFC 1-200-01_2019 Attachment 10 – UFC 3-301-01_2019 Attachment 11 – UFGS 32-01-19.61 Attachment 12 – DLA Joint Sealant Procedures Attachment 13 – Concrete Details Attachment 14 – Bollards Detail Attachment 15 – Fac. 820 – H7 – Fuel Tank Plan & Details Attachment 16 – Fac. 820 – E6 – Schedules & Details Attachment 17 – Artist Rendition of desired cantilever canopy (End of clause)

(End of Summary of Changes)