Questions and Answers_as of 01 Sep 20.pdf

PDF 91 KB Posted

Attached to
Repair MOGAS Station
Solicitation number
W50S7T-20-R-0005
Issued by

About this file

This document contains questions and answers related to the solicitation for the Repair MOGAS Station project. The solicitation calls for the removal of two existing 5,000-gallon underground fuel tanks and associated dispensers, canopy, concrete island, and electrical and communications infrastructure at the fuel station site. Bidders should not supply or install new tanks as part of the project. The scope of work also includes installation of a new cantilever canopy with a standing seam roof but no wall panels, as well as eight bollard posts following tank removal. Provisions for contaminated soil removal are included, to be treated as a differing site condition. The document provides clarification on project details, such as tank and infrastructure locations and removal requirements, canopy specifications, and stormwater management revisions eliminating proposed inlets and roads.

View the file

Other files

File Type Posted
W50S7T-20-R-9998 - Bid Opening Sign In Sheet.pdf PDF
W50S7T-20-R-9998 - Abstract.pdf PDF
W50S7T-20-R-0005-Repair MOGAS Station Solicitation_26 Aug 20.pdf PDF
Attachment 10 Ufc_3_301_01_2019.pdf PDF
W50S7T-20-R-0005 - Amendment 1 - Repair MOGAS Station_26 Aug 20.pdf PDF
Attachment 16 Fac. 820 - E6 - Schedules & Details.PDF PDF
Attachment 7 Mogas Markup Final.pdf PDF
Attachment 12 DLA Joint Sealant Procedures.pdf PDF
Attachment 13 Concrete Details.pdf PDF
Attachment 15 Fac. 820 - H7 - Fuel Tank Plan & Details.PDF PDF
Attachment 11 UFGS 32 01 19.61.pdf PDF
Attachment 14 - Bollards Detail.pdf PDF
Attachment 8 ufc_3_460_01_2019_c1.pdf PDF
Statement of Work_Repair MOGAS Station_Revised 25 Aug 20.pdf PDF
Attachment 17 Artist rendition of desired cantilever canopy.pdf PDF
Attachment 9 ufc_1_200_01_2019.pdf PDF
Questions and Answers_Repair MOGAS Station_as of 26 Aug 20.pdf PDF
Pre-Bid_Site Visit Sign-In Sheet - W50S7T-20-R-0005.pdf PDF
Pre-Bid Slides - Repair MOGAS Station - W50S7T-20-R-0005.pdf PDF
SOW_Repair MOGAS Station.pdf PDF
Attachment 1_MOGAS Station Layout_12 December 2019_1 Page.pdf PDF
Attachment 6_Site Utilities_12 December 2019_1 Page.pdf PDF
Attachment 4_MOGAS Storm Drains_12 December 2019_1 Page.pdf PDF
Attachment 2_MOGAS Station Trenching_12 December 2019_1 Page.pdf PDF
AF Form 66_ Repair MOGAS Station.pdf PDF
Attachment 5_Site Utilities_12 December 2019_1 Page.pdf PDF
Attachment 3_Curb Detail_13 December 2019_1 Page.pdf PDF
W50S7T-20-R-0005-Repair MOGAS Station Solicitation_05 Aug 20.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: W50S7T‐20‐R‐0005 Project Title: Repair MOGAS Station Project Number: 202002657 Current a/o 01 Sep 2020

Questions and Answers

Number Question Answer 1 Please provide quantity, size, depth, and location of existing tanks that need to be removed.

There are 2 ea 5000 gal tanks directly south of the island and pumps.

Reference Attachment 15 Drawing Fac. 820 - H7 - Fuel Tank Plan & Details

2 Confirm that existing underground tanks, dispensers, canopy and concrete island are to be removed

Yes – They are all to be removed

3 Confirm if any existing electrical/comm need to be removed. If yes, please indicate where they are located.

Yes, remove all existing electrical and comm. Reference Attachment 16 Fac. 820 - E6 - Schedules & Details

4 Confirm that we are NOT to supply or install new tanks Contractor is not to supply tanks.

5 Confirm if any work is required for future piping beneath the new tank slab There is no requirement for future underground piping.

6 Confirm if any steel bollards should be installed at the new tank pad 8 ea Bollards are to be installed following tank installation as Option 1.

Reference Attachment 14 for details

7 Please provide location, size and height of new canopy Location, size and dimensions of new canopy are on Attachment 7.

8 Can you provide the sizes and locations of the three sliding/raising gates The three sliding/rising gates have been removed from the project.

Reference Modified SOW. New manual sliding gates referenced in Attachment 7 are each 18 feet.

It seems there may be an existing light pole that is located in the new roadway.

Can you confirm. If yes, I assume the pole/fixture should either be relocated or just removed. Please advise.

The modified statement of work eliminates the new roadway. The light pole is to remain. Reference Statement of Work_Repair MOGAS Station_Revised 25 Aug 20

10 Please indicate the number of storm inlets that should be installed All storm inlets have been removed from the project and replaced with storm gutters that will drain into existing POL yard as indicated in Attachment 7.

11 Please indicate approximate location of the inlets (i.e. new access road, existing asphalt removal, etc)

All storm inlets have been removed from the project and replaced with storm gutters that will drain into existing POL yard as indicated in Attachment 7.

12 We noticed some other existing cantilever canopies on site constructed with structural steel columns and beams with standing seam roof and wall panels.

Is this how the new canopy should be constructed?

Canopy should be cantilever design with standing seam roof. No wall panels are required. Reference attachment 17 (not to scale).

Solicitation Number: W50S7T‐20‐R‐0005 Project Title: Repair MOGAS Station Project Number: 202002657 Current a/o 01 Sep 2020

Questions and Answers

Statement of Work indicates to “Excavate if required to remove all contaminated soil”. It is very difficult to provide an accurate cost for this since it is unclear if the soil is contaminated and if it is, the quantity that has contamination is unknown. Can a allowance amount determined by the military be included in our bid instead?

If contaminated soil is encountered during construction, it will be treated as a differing site condition.

14 What is the height requirement for the canopy? Reference revised statement of work para 2.1 (F) – 20’ tall

END OF QUESTIONS AS OF 01 Sep 20