This document provides questions and answers related to a solicitation for repair work at a MOGAS fuel station. The solicitation seeks a contractor to remove two existing 5,000 gallon underground fuel tanks and associated dispensers, canopy, concrete island and electrical systems at the station. The contractor is also to install a new cantilever canopy with a standing seam roof but no wall panels. Other work includes installing bollards and manual sliding gates. The statement of work has been revised to remove requirements for a new roadway, storm inlets and three sliding gates. Contaminated soil removal is to be addressed as a differing site condition if encountered during construction. The document aims to clarify project scope and requirements for interested contractors.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: W50S7T‐20‐R‐0005 Project Title: Repair MOGAS Station Project Number: 202002657 Current a/o 26 Aug 2020
Questions and Answers
Number Question Answer 1 Please provide quantity, size, depth, and location of existing tanks that need to be removed.
There are 2 ea 5000 gal tanks directly south of the island and pumps.
Reference Attachment 15 Drawing Fac. 820 - H7 - Fuel Tank Plan & Details
2 Confirm that existing underground tanks, dispensers, canopy and concrete island are to be removed
Yes – They are all to be removed
3 Confirm if any existing electrical/comm need to be removed. If yes, please indicate where they are located.
Yes, remove all existing electrical and comm. Reference Attachment 16 Fac. 820 - E6 - Schedules & Details
4 Confirm that we are NOT to supply or install new tanks Contractor is not to supply tanks.
5 Confirm if any work is required for future piping beneath the new tank slab There is no requirement for future underground piping.
6 Confirm if any steel bollards should be installed at the new tank pad 8 ea Bollards are to be installed following tank installation as Option 1.
Reference Attachment 14 for details
7 Please provide location, size and height of new canopy Location, size and dimensions of new canopy are on Attachment 7.
8 Can you provide the sizes and locations of the three sliding/raising gates The three sliding/rising gates have been removed from the project.
Reference Modified SOW. New manual sliding gates referenced in Attachment 7 are each 18 feet.
It seems there may be an existing light pole that is located in the new roadway.
Can you confirm. If yes, I assume the pole/fixture should either be relocated or just removed. Please advise.
The modified statement of work eliminates the new roadway. The light pole is to remain. Reference Statement of Work_Repair MOGAS Station_Revised 25 Aug 20
10 Please indicate the number of storm inlets that should be installed All storm inlets have been removed from the project and replaced with storm gutters that will drain into existing POL yard as indicated in Attachment 7.
11 Please indicate approximate location of the inlets (i.e. new access road, existing asphalt removal, etc)
All storm inlets have been removed from the project and replaced with storm gutters that will drain into existing POL yard as indicated in Attachment 7.
12 We noticed some other existing cantilever canopies on site constructed with structural steel columns and beams with standing seam roof and wall panels.
Is this how the new canopy should be constructed?
Canopy should be cantilever design with standing seam roof. No wall panels are required. Reference attachment 17 (not to scale).
Solicitation Number: W50S7T‐20‐R‐0005 Project Title: Repair MOGAS Station Project Number: 202002657 Current a/o 26 Aug 2020
Questions and Answers
Statement of Work indicates to “Excavate if required to remove all contaminated soil”. It is very difficult to provide an accurate cost for this since it is unclear if the soil is contaminated and if it is, the quantity that has contamination is unknown. Can a allowance amount determined by the military be included in our bid instead?
If contaminated soil is encountered during construction, it will be treated as a differing site condition.
END OF QUESTIONS TO DATE