Grid 9 JAN 2026.pptx

PPTX presentation 2 MB Posted

Attached to
REPAIR Airfield Apron - 126 ARW, Scott AFB, IL
Solicitation number
W50S7S26
Issued by

About this file

This is an airfield ramp inspection grid document dated January 8, 2026, that identifies deficiencies requiring repair across four zones (A, B, C, and D) at Scott Air Force Base, Illinois for the 126 Air Refueling Wing. The grid systematically catalogs pavement distress and infrastructure issues using a standardized legend: vegetation (V), pavement cracks/distress (C), light outages or broken fixtures (L), missing bolts (B), faded or obscured markings (F), and other deficiencies (O).

The inspection reveals significant longitudinal cracking requiring attention across multiple zones. Zone A encompasses areas A1 through A8 with cracking extending 157.9 feet; Zone B covers areas B1 through B3 with 139 linear feet of longitudinal cracking; Zone C spans areas A3 through A5 with 680 feet of cracking extending from zone 40 to 87; and Zone D includes areas A1 and A2 with additional 680-foot cracking from zone 40 to 87. All zones require comprehensive repainting of markings, including fuel pits. Various pavement cracks are noted at specific measurements (ranging from 2 inches to 13.4 inches), and vegetation growth is documented throughout. This grid serves as a detailed baseline assessment supporting the comprehensive repair requirement for concrete apron, asphalt shoulders, and airfield markings outlined in the associated solicitation W50S7S26 by the Department of the Army National Guard.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A D C B A8 A6 A7 A5 A4 A3 A2 A1 B2 B3 B1

LEGEND

V=Vegetation C=Pavement Distress/Crack L=Light Out/ Broke B= Missing Bolt F= Faded/Chipped/ Obscure Marking / Lines O=Other

GUIDE

Mark appropriate letter in block on grid.

On side of page, identify zone and letter with details of issue and specific location G

RAMP INSPECTION GRID

Current as of 8 Jan 2026

ZONE A

A6 A7 A8

GRID

C F F F F F C C F F C 157.9 ft C 3.2 x2 C C V V V V V V V V Note:

All paint needs to be repainted;

including fuel pits Note:

Longitudinal crack from zone 13-26 157.9ft

ZONE B

B2 B3 B1

C 139ft C C 13.4in C 3.4in C 12.6in V V V V V V V V V V V Note:

All paint needs to be repainted;

including fuel pits Note:

Longitudinal crack from B2 past B1 (139ft)

ZONE C

A5 A4 A3

Note:

All paint needs to be repainted;

including fuel pits C (680ft) C (680ft) Note:

Longitudinal crack from zone 40 to zone 87 (680ft) C V V V

ZONE D

A2 A1

G G Note:

All paint needs to be repainted;

including fuel pits V V V V V V V V V V V V V V V V C (680ft) C C C Note:

Longitudinal crack from zone 40 to zone 87 (680ft) C C image1.png image2.png image9.png image3.png image4.png image5.png image6.png image7.png image8.png image13.png image10.png image100.png image11.png image12.png image14.png image15.png image16.png image17.png image160.png image18.png

File details come from the government source that posted it. Updated .