These are electrical engineering drawings for Building 5046 at the 126th Air Refueling Wing, dated 12/02/2013. The three-page document includes an electrical site plan, electrical power floor plan, and electrical lighting floor plan for a facility with multiple storage areas, offices, and an open bay. Key electrical modifications include: disconnecting and removing existing pad mount transformer and meter socket, providing new meter socket and CT cabinet, installing a new main switchboard (MSB) with service entrance rating, creating new ductbanks, and installing a new 5kV pad mount transformer with a 4-position primary switch. The floor plans detail the electrical infrastructure for various 48-768 square foot spaces such as unisex restrooms, storage areas, mechanical rooms, communications areas, and an open bay measuring 9,238 square feet. The drawings specify electrical equipment like exhaust fans (EF-1, EF-2) and provide detailed routing and coordination instructions for electrical installations.

View the file

Other files

File Type Posted
Site Visit Log.pdf PDF
Site Visit MFR.pdf PDF
Bldg. 5046 Fire Protection Plan.pdf PDF
Bldg. 5046 Mechanical HVAC & Piping Plan.pdf PDF
Bldg. 5046 Plumbing Plans.pdf PDF
RFI Version 1.pdf PDF
PWS REPAIR 126ARW Resilience Center B5046.pdf PDF
Solicitation W50S7S25Q0025.pdf PDF
Wage Determination.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

t h

A

I R

E F

U E

L I N

G

W

I N

G

C

E

S

Q U

A D

R O

N

M B

P L

J N

1 3

B

L D

G

E

C T

R I C

A

S

T

P

A

N

KEY PLAN NOTES:

1. DISCONNECT AND REMOVE EXISTING PAD MOUNT

TRANSFORMER. PRIMARY FEEDER TO BE REMOVED BY

OTHERS.

2. DISCONNECT AND REMOVE EXISTING METER SOCKET AND CT

CABINET, AND ASSOCIATED CONDUIT AND WIRE, FROM

TRANSFORMER TO PANEL LPLV.

3. REMOVE EXISTING NEUTRAL TO GROUND BOND IN PANEL LPLV.

CONNECT PANEL TO 400A/2P C/B IN NEW MSB.

4. PROVIDE NEW 3#/500 KCMIL, 1#1/0 GND-3 1/2"C.

5. PROVIDE NEW 2 SETS OF 4#350 KCMIL, 1#2/0 GND-3 1/2"C.

6. PROVIDE NEW METER SOCKET AND CT CABINET WITH CT'S AND

WATTHOUR DEMAND METER. COORDINATE WITH BASE FOR

REQUIRED EQUIPMENT.

7. PROVIDE NEW 4#3, 1#8GND-1 1/4"C.

8. PROVIDE MAIN SWITCHBOARD MSB. SWITCHBORAD SHALL BE

SERVICE ENTRANCE RATED.

9. EXISTING PAD MOUNT SWITCH. PROVIDE SET OF 15kV FUSES IN

EXIST SPARE COMPARTMENT.

10. PROVIDE NEW TWO-WAY 5" CONCRETE ENCASED DUCTBANK.

PROVIDE 4#2/0 AND 1#4GND (15kV) AND 1#2/0 (600V) IN ONE DUCT.

11. EXISTING MANHOLES.

12. PROVIDE 4#2/0 AND 1#4GND (15kV) AND 1#2/0 (600V) IN EXISTING

SPARE DUCT.

13. PROVIDE NEW 225kVA 12,470 - 120/208V, 3Ø PAD-MOUNT

TRANSFORMER. TRANSFORMER SHALL BE EQUIPPED WITH

4-POSITION PRIMARY SWITCH AND CURRENT LIMITING FUSES.

TWO SETS OF BUSHINGS ARRANGED FOR LOOP FEED.

14. PROVIDE 3 1/2" RGS CONDUIT. STUB INTO SECONDARY SIDE OF

TRANSFORMER CABINET AND 3' PAST EDGE OF PAD AND CAP.

15. EXISTING COMMUNICATIONS MANHOLE.

16. TWO WAY 4" CONCRETE ENCASED DUCTBANK. OPEN CUT AND

PATCH ROAD TO MATCH EXISTING. STUB UP DUCTS IN ADDITION.

CABLE BY OTHERS

17. PIV - COORD. LOCATION WITH CIVIL DRAWINGS. CONNECT TO

CCT IN PANEL RP-1

18. EXISTING DUCT TO REMAIN.

NOTES:

1. COORDINATE EXACT LOCATIONS AND ROUTING OF

EQUIPMENT AND FEEDERS WITH SITE CONDITIONS.

2. COORDINATE ALL SITE ELECTRICAL WORK WITH BASE

ENGINEERING.

ELECTRICAL SITE PLAN

SCALE: 1" = 40'

F I L

E

P

A T

H

E1

E1

E1

E1

E1

E1

E1

E1

WP

WP

WP

WP

WP

WP

EF-2

120V., 1PH.,

1/2HP

EF-1

120V., 1PH.,

1/2HP

3 3

UNISEX

REST ROOMS

48 SF.

48 SF.

OPEN AREA

SYSTEM'S FURNITURE

785 SF.

STORAGE

165 SF.

STORAGE

558 SF.

STORAGE

260 SF.

OFFICE

294 SF.

MECHANICAL

ELECTRICAL

FIRE PROTECTION

151 SF.

COMM

127 SF.

STORAGE AREA

1D CEX

512 SF.

STORAGE AREA

1E MSG

256 SF.

STORAGE AREA 1F

SECURITY FORCES

1536 SF.

STORAGE AREA

1C COMM

STORAGE AREA

1B OPS

STORAGE AREA

1A FSS

768 SF. 768 SF. 768 SF.

OPEN BAY

9238 SF.

t h

A

F

U E

L I N

G

W

I N

G

C

E

S

Q U

A D

R O

N

M B

P L

J N

2 3

D

G

E

C T

R I C

O W

A

N

ELECTRICAL POWER FLOOR PLAN

SCALE: 3/32" = 1'-0"

F I L

E

P

A T

N O

Y P

I C

A L

E1

E1

E1

E1

E1

E1

E1

E1

EF-2

120V., 1PH.,

1/2HP

EF-1

120V., 1PH.,

1/2HP

3 3

UNISEX

REST ROOMS

48 SF.

48 SF.

OPEN AREA

SYSTEM'S FURNITURE

785 SF.

STORAGE

165 SF.

STORAGE

558 SF.

STORAGE

260 SF.

OFFICE

294 SF.

MECHANICAL

ELECTRICAL

FIRE PROTECTION

151 SF.

COMM

127 SF.

STORAGE AREA

1D CEX

512 SF.

STORAGE AREA

1E MSG

256 SF.

STORAGE AREA 1F

SECURITY FORCES

1536 SF.

STORAGE AREA

1C COMM

STORAGE AREA

1B OPS

STORAGE AREA

1A FSS

768 SF. 768 SF. 768 SF.

OPEN BAY

9238 SF.

t h

A

F

U E

L I N

G

W

I N

G

C

E

S

Q U

A D

R O

N

M B

P L

J N

3 3

D

G

E

C T

R I C

G

H T

I N

G

P

L A

N

ELECTRICAL LIGHTING FLOOR PLAN

SCALE: 3/32" = 1'-0"