B25 FP 210 revised pdf.pdf
PDF 4 MB Posted
- Attached to
- Demo HEF
- Solicitation number
- W50S7L-22-R-0004
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B8-Questions and Answers 8_29_22.docx | DOCX document | |
| SOW - Demolish HEF System B25 and B76.pdf | ||
| B8-Questions and Answers 7_11_22.pdf | ||
| B8-Questions and Answers 7-7-22.pdf | ||
| B25 FP 211.pdf | ||
| B25 FP 210.pdf | ||
| B25 FP 200.pdf | ||
| B25 FP 000.pdf | ||
| B76 HEF System.pdf | ||
| SOW - Demolish HEF System B25 and B76.pdf | ||
| B25 Fire Suppression- Pull Boxes.pdf | ||
| B25 FP 201.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1246779410N Rectangle
1246779410N Rectangle
1246779410N Text Box -Demolish all HEF Piping, Generators, and Test Header back to Hangar floor CMU block Fire wall.
- Abandon in place HEF supply line over teh office areas to Fire Riser room and cap both ends of the line outside the Fire Riser room wall and at Hangar Floor CMU block wall.
-Demolish tank and all associated piping in fire riser room per drawing FP 200.
- Demolish HEF Pull Stations