B25 FP 210 revised pdf.pdf

PDF 4 MB Posted

Attached to
Demo HEF
Solicitation number
W50S7L-22-R-0004
Issued by

View the file

Other files

File Type Posted
B8-Questions and Answers 8_29_22.docx DOCX document
SOW - Demolish HEF System B25 and B76.pdf PDF
B8-Questions and Answers 7_11_22.pdf PDF
B8-Questions and Answers 7-7-22.pdf PDF
B25 FP 211.pdf PDF
B25 FP 210.pdf PDF
B25 FP 200.pdf PDF
B25 FP 000.pdf PDF
B76 HEF System.pdf PDF
SOW - Demolish HEF System B25 and B76.pdf PDF
B25 Fire Suppression- Pull Boxes.pdf PDF
B25 FP 201.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1246779410N Rectangle

1246779410N Rectangle

1246779410N Text Box -Demolish all HEF Piping, Generators, and Test Header back to Hangar floor CMU block Fire wall.

- Abandon in place HEF supply line over teh office areas to Fire Riser room and cap both ends of the line outside the Fire Riser room wall and at Hangar Floor CMU block wall.

-Demolish tank and all associated piping in fire riser room per drawing FP 200.

- Demolish HEF Pull Stations