B25 Fire Suppression- Pull Boxes.pdf
PDF 5 MB Posted
- Attached to
- Demo HEF
- Solicitation number
- W50S7L-22-R-0004
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B25 FP 210 revised pdf.pdf | ||
| B8-Questions and Answers 8_29_22.docx | DOCX document | |
| SOW - Demolish HEF System B25 and B76.pdf | ||
| B8-Questions and Answers 7_11_22.pdf | ||
| B8-Questions and Answers 7-7-22.pdf | ||
| B25 FP 201.pdf | ||
| B25 FP 211.pdf | ||
| B25 FP 210.pdf | ||
| B25 FP 200.pdf | ||
| B25 FP 000.pdf | ||
| B76 HEF System.pdf | ||
| SOW - Demolish HEF System B25 and B76.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STAIRS
S004
PRTCTN
RISER RM
A115
JANITOR
A116
ACC
OFFICE
B118D
PNEUDRALIC
B118
ISO
PHASE
B128
FLGT LINE
CONF.
B135
TOOL RM/
BENCH STOCK
B122A
JOAP
X RAY
ROOM
B113
B112
FILM
VIEWING
B111
STAIRS
SHOP
CORD.
SHOP
STAIRS
BREAK
ROOM
B127
TOOL
CRIB
MENS
LATRINE
B126
WOMENS
LATRINE
B125
COR.
STAIRS
S001
TIRE
TIRE SHOP
SPRVSR
S002
B119
B123
S003
SHOP
AVIOICS
ECM
MTL TECH
SHOP
ELECTRO ENVIRO
SHOP
FLIGHT LINE
B130
B101A
B101
B122B
B107A
B105
B106
B104
B109
SUPERVISOR
B118A
PNEUDRALIC
SIPR
B105B
104B
MSL
OFFICE
ISO
SPVSR
B128A
ISO
OFFICE
B128B
B130
FLIGHT LINE
STRG
B124
TIRE SHOP
OFFICE
B101B
TRAINING
B102
B104A
AVIOICS
TRAINING
AVIONICS
SPRVSR
B119B
ELECTRO
TRAINING
TEST STND
B118C
B118B
PNEUDRALIC
TRAINING
B100
MAINTENANCE
HANGAR BAY
MACH.
ELEV
NDI
SHOP
COR.
B123
VEST.
B123A
ACCESS
B129
ACCESSACCESS
TUG
B105A
ECM
OFFICE
FIRE
OFFICE
B131
OFFICE
B132
OFFICE
B133
FILM
DVLPNT
H
R
R
A T
E D
W
A L L
H
R
R
A T
L L
1 HR RATED WALL
1 HR RATED WALL
H
R
R
A T
L L
1 HR
1 HR
1 HR RATED WALL
1 HR
H
R
R
A T
L L
H
R
1 HR RATED WALL 1 HR1 HR 1 HR RATED WALL
STORAGE
B134
ACCESS
B103
ACCESSACCESS
TUG
HEF PULL
STATION
HEF PULL
STATION
HEF PULL
STATION
HEF PULL
STATION
HEF PULL
STATION
HEF PULL
STATION
DATE
B U
I L
D I N
G
F
L O
O R
P
L A
N
5/20/2020
F L
O O
R
P
L A
N
M O
N T
A N
A
A
I
N
T
I O
N A
L
G
A U
R D
I R
P O
T
V
B
G R
E A
T
F
A L
L S
M
T
SHEET
OF
1 1
SCALE
SCALE
TITLE
DRAWN BY
SRA MATTHEW AMMONS
PLAN VIEW
120 AW CES
APPROVAL/REVISION
NUM DATEAPPROVED BY
1246779410N Rectangle
1246779410N Rectangle
1246779410N Rectangle
1246779410N Rectangle
1246779410N Rectangle
1246779410N Cross-Out
1246779410N Text Box Perform the following Electrical Demo at the 5 locations shown:
- Demolish Pull Sation, Blue HEF Strobe, up to J-box, and remove wire back to the releasing panel in the Fire Riser Room.
- Plug holes in J-box
-Demolish "Start Foam Systems" sign
-Touch up Paint
1246779410N Line
1246779410N Text Box B25 Hangar