C4 - Abstract 1419 - Construction.pdf

PDF 239 KB Posted

Attached to
Communication Facility HVAC Upgrades - 139th Federal contract opportunity
Solicitation number
W50S7G-25-B-A008
Issued by
Department of the Army National Guard

About this file

This is an Abstract of Offers - Construction document for a federal contract solicitation for a Communications Facility HVAC project (UYLB242014) issued by 139th AW Base Contracting in St. Joseph, MO. The solicitation number is W50S7G25BA008, with an issue date of 22 August 2025 and opening date of 23 September 2025. Five contractors submitted bids, including Jim Jam, Inc., Vazquez Commercial Contracting, LLC, Lee Grover Construction, and L&J Building Company LLC. The contract includes a base bid and an additional bid for an Uninterruptable Power Supply, with estimated government budget of $400,000. Bid prices ranged from $247,700 to $521,363, with all bidders providing a 20% bid security. The certifying official is CAPT Adam Danner from the 139th AW Base Contracting office.

View the file

Other files for this federal contract opportunity

Other files attached to Communication Facility HVAC Upgrades - 139th, newest first.
File Type Posted
sign in sheet.pdf PDF
Solicitation Amendment W50S7G25BA0080001 SF 30.pdf PDF
Amendment W50S7G25BA0080001 SF 30.pdf PDF
SOW Comm HVAC 18Sept2025.pdf PDF
Questions and Answers - 1.pdf PDF
Prebid Signin - Comm HVAC.pdf PDF
B7- Comm HVAC Pre-Bid Conference Slides.pdf PDF
Wage Rate - MO20250081 Mod 09 14AUG2025.txt TXT text file
SOW Comm HVAC - 22AUG2025.pdf PDF
2in PVC Drain Line.pdf PDF
EMDP-1.pdf PDF
Solicitation - W50S7G25BA008 COMM HVAC.pdf PDF
Comm Floor Plan.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. DATE ISSUED 22

AUG 2025

3. DATE OPENED

23 SEPT 2025

PAGE 1 OF

4. ISSUING OFFICE

X

7A.

ITEM

NO. 7B. DESCRIPTION OF OFFERED ITEM

7C. EST

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

1 BASE BID 1 JOB $250,000.00 247,700.00$ 268,299.00$

2 ABI #1 - Uninterruptable Power Supply 1 JOB 150,000.00$ 225,556.00$ 253,064.00$

A. HIRED LABOR

NO. 1 NO. 2

B. BID SECURITY (Type and Amount) Yes - 20%B. REASONABLE CONTRACT (Without Profit)

8. GOVERNMENT ESTIMATE

(Check A, B, or C and complete D, E, and F)

9. OFFERS

AMENDMENT(S) ACKNOWLEDGED: Yes

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER W50S7G25BA008

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIYING OFFICIAL (Type) CAPT ADAM DANNER

DATE SIGNED

A. OFFEROR: Jim Jam, Inc

AMENDMENT(S) ACKNOWLEDGED: Yes

5. Project Title:

C. REASONABLE CONTRACT

(Including Profit)

SIGNATURE

6. NO. OF AMENDMENTS ISSUED:

A. OFFEROR Vazquez Commercial Contracting, LLC

B. BID SECURITY (Type and Amount) Yes- 20%

139th AW Base Contracting 705 Memorial Dr.

St. Joseph, MO 64503

Communications Facility HVAC, UYLB242014

$400,000.00 $473,256.00 $ 521,363.00 AUTHORIZED FOR LOCAL REPRODUCTION NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)

PAGE 2 OF _2_ PAGES

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

1 1 JOB 232,560.00$ 500,000.00$

2 1 JOB 226,900.00$ 500,000.00$

-$ 459,460.00$ $1,000,000.00

AUTHORIZED FOR LOCAL REPRODUCTION OPTIONAL FORM 1419A (11-88)

4. OFFERS (Continued)

C. AMENDMENTS ACKNOWLEDGED

B. BID SECURITY (Type and Amount)

A. OFFEROR: A. OFFEROR

NO.

A. OFFEROR: Lee Grover Construction

B. BID SECURITY (Type and Amount) - Yes - 20% B. BID SECURITY (Type and Amount):

1. SOLICITATION NUMBER: W50S7G25BA008

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

NO. 3 NO. 5

C. AMENDMENTS ACKNOWLEDGED:

A.

ITEM

NO.

B. BID SECURITY (Type and Amount) Yes - 20%

A. OFFEROR: L&J Building Company LLC

C. AMENDMENTS ACKNOWLEDGED - Yes

C.

UNIT

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

2. PROJECT TITLE

Communications Facility HVAC, UYLB242014

CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED - Yes

NO. 4

B.

ESTIMATE

D

QUANTIT

1419 offeror 1-2
1419 offeror 3-6
2025-09-24T10:40:44-0500
DANNER.ADAM.DAVID.1266580980

File details come from the government source that posted it. Updated .