About this file
This Statement of Work (SOW) details an HVAC upgrade project for the 139th Airlift Wing Communication Building at Rosecrans Memorial Airport in St. Joseph, Missouri. The base bid involves installing a new Computer Room Air Conditioning (CRAC) unit in Room 121, specifically a Liebert DS070ADC1EI9IO0 unit with a matching Liebert MCL110E8YD0A02 condenser. The project includes power supply from EMDP-1 in Electrical Room 137, water line installation, condensate pump, and drain line setup.
An additive bid item includes a Vertiv APM2 Uninterruptable Power Supply (UPS) with 60KVA/kW rating, 480v 3-phase input, 208v 3-phase output, and 10-12 minute run time. The project requires power distribution modifications, including renaming panels RP-2B and RP-2C to RPU-2B and RPU-2C. The performance period is 240 calendar days from notice to proceed, with work limited to 0700-1600 Monday through Friday, excluding government holidays. Contractors must comply with base access requirements, including background checks, REAL ID compliance, and antiterrorism awareness training.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| sign in sheet.pdf | ||
| C4 - Abstract 1419 - Construction.pdf | ||
| Amendment W50S7G25BA0080001 SF 30.pdf | ||
| SOW Comm HVAC 18Sept2025.pdf | ||
| Questions and Answers - 1.pdf | ||
| Solicitation Amendment W50S7G25BA0080001 SF 30.pdf | ||
| Prebid Signin - Comm HVAC.pdf | ||
| B7- Comm HVAC Pre-Bid Conference Slides.pdf | ||
| Solicitation - W50S7G25BA008 COMM HVAC.pdf | ||
| Comm Floor Plan.pdf | ||
| Wage Rate - MO20250081 Mod 09 14AUG2025.txt | TXT text file | |
| 2in PVC Drain Line.pdf | ||
| EMDP-1.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
139 AIRLIFT WING
MISSOURI AIR NATIONAL GUARD
705 MEMORIAL DRIVE
ST. JOSEPH, MISSOURI
STATEMENT OF WORK
PROJECT NUMBER
ULYB252014 Communication Building HVAC Upgrade
FOR
139TH AIRLIFT WING CONTRACTING OFFICE
MISSOURI AIR NATIONAL GUARD
ST. JOSEPH, MISSOURI
PREPARED BY
139 CES/CEE
22 August 2025
Project Coordination:
Users: _______________________ Fire Department: _______________________
Safety Officer: _______________________ Security Forces: _______________________
ATFP Officer: _______________________ Environmental Officer: _______________________
Bio Environmental: _______________________ Communications Officer: _______________________
Real Property Manager: _______________________ HVAC Shop: _______________________
Electrical Shop: _______________________ Plumbing Shop: _______________________
Base Facility Manager: _______________________ Base Civil Engineer: _______________________
Summary of Work:
All work performed under this Statement of Work (SOW) shall be conducted in accordance with all applicable state and federal laws and regulations, ANG policies and regulations, and this SOW as outlined below.
Project Scope:
1) Network Room – 121
A) BASE BID - Install a new Computer Room Air Conditioning (CRAC) unit.
1) Basis of Design
(a) Computer Room Air Conditioner
(a) Manufacturer: Liebert
(b) Model: DS070ADC1EI9IO0
(b) Condenser to be installed in mechanical yard
(a) Manufacturer: Liebert
(b) Model: MCL110E8YD0A02
2) Power to be supplied from EMDP-1 in Electrical Room (137)
(a) See attached for existing panel schedule and details
(b) Appropriately sized EMT conduit to be used for all wiring
(c) Provide updated panel schedule
3) Unit to be controlled and monitored by central DDC system (Automated Logic)
4) Water to CRAC unit be supplied from water line above ceiling in northeast corner of
Room 124 (See drawing for rough location)
(a) The new water line can be either pex or copper.
(b) New line to have shutoff valve installed
5) Provide condensate pump and drain line
(a) Line shall drain into 2” PVC stub-up in Room 125.
(b) Contractor to provide new fittings and make all necessary adjustments to existing PVC line to allow space for new condensate line. (See picture of existing)
B) Additive Bid Item #1 - Uninterruptable Power Supply – Room 121
1) Basis of Design
(a) Manufacturer: Vertiv APM2
(b) Model: 56SA060JNN4NA4O
2) Power to be supplied from EMDP-1 in Electrical Room (137)
3) Specs
(a) 480v 3 phase input power
(b) 208v 3 phase output power
(c) 60KVA/kW Rating
(d) 10-12 minute run time
(e) Standard bypass option with the unit
(f) Rough size of a data rack
(g) Two 120-125 Amp subfeed breakers
(h) Manufacturer startup (5 days x 8 hours)
(i) Load bank testing
4) Power Distribution
(a) Panel RP-2B & RP-2C in Room 121
(a) Will be renamed to RPU-2B & RPU-2C
(b) Will be refed from the UPS
(i) The existing fed wires from Panel RP-2 are to be removed
(c) Will have breakers added to provide dedicated circuits for Section B.4.b
(b) The receptacles that are current on the overhead cable trays are to be mimicked to the opposite side of the cable trays, the current receptacles are to stay
(a) The receptacles are to be fed from panels RPU-2B for the West or RPU-2C for the East
2) Site Conditions A) The contractor is responsible for the clean-up and removal of all debris and unused material. No leftover material is to be left on base unless directed by Base CE.
B) The contractor is responsible for repairing any damage to existing buildings, sidewalks, asphalt/concrete drives, curbs, grass areas, fencing, utility lines/boxes and all other government property that occur because of construction.
1) The contractor is responsible for repairing or replacing any and all ceiling, walls, trim, flooring that become damaged during construction.
General Notes:
1) Project Location: Building 307, 139th Airlift at Rosecrans Memorial Airport on 705 Memorial
Drive (Airport Rd) in St Joseph, Missouri.
2) Performance Period: 240 calendar days from NTP
3) Hours of Operation: 0700 - 1600 Monday through Friday except on Government Holidays.
4) Visitor Center Hours of Operation: 0700 – 1100 Monday, Wednesday, Friday except Government Holidays.
a) Background checks must be submitted at least 7 working days from the needed access date.
5) Real ID: All employees requiring base access possess a REAL IC-compliant driver’s license or other acceptable form of identification. REAL ID criteria are outlined in DoDM 5200.08v3_DAFMAN31-101v3. You can verify REAL ID compliance and monitor for any changes to the enforcement date on the DHS website: hhtps://www.dhs.gov/real-id. Failure to present REAL ID compliant identification after May 7, 2025, will result in denied access or individual must be escorted. Please take the necessary steps now to ensure compliance and avoid any access disruptions.
6) Scheduling: The contractor shall coordinate the work schedule with and get approval from the Project Manager.
7) Use of Base Utilities: Base water and electric shall be available for use by the contractor and sub-contractors in performance of this project only. All other utilities shall not be available for contractor and sub-contractor use.
8) Motorized Lifts: Motorized lifts are prohibited for interior use in auditorium, exterior use is acceptable.
9) Redline Drawings: Redlined floorplan layouts of all construction changes will be provided to
139th CES upon completion of the project for updating existing base drawings. These redlines are to show all construction features including errors, changes, revisions, and any deviations from the original plan. Additional redlines floorplan layouts to show cable pathways used, jack numbering and locations, locations of any cables not reused and left coiled above the ceiling with locations and labeling for coaxial cables.
10) Equipment Manuals, Training, & Warranty: One hard copy and one electronic copy of O&M
Manuals and Warranty information for all new devices. Submit in a binder format that is labeled for the project. Additionally, contractor shall provide training to users & base craftsmen on new equipment.
11) Hazardous Materials: The contractor planning to use hazardous material (HM) for the project shall register with the base Hazardous Material Pharmacy (HMP) prior to start of work in order to support the installation’s compliance with Executive Order 12856, Federal Compliance with Right-to-Know Laws and Pollution Prevention Requirements. All HM required to support the contract shall be reported to the HMP using the Contractor HM Identification Form. The HM Identification Form will be a submittal requirement and must be submitted and approved before work can begin. (See Attachment).
12) Fire Protection: Open flame devices or any welding are not permitted except when a permit has been applied for and received. Permits may be applied for by submitting an AF form 592 to Building 302, Fire House, and 24 hours prior to using any open flame devices or welding devices. Contractor shall provide his own fire protection to include fire extinguishers.
13) Digging Permits: Any digging shall require a digging permit. The digging permit shall be obtained through the Base Civil Engineering Office (BCE) or the Project Manager.
14) Contractor’s Equipment & Supplies: Store all Contractor tools, equipment and supplies in a location approved by the Government project manager, on or off base property.
Government shall not be held responsible for missing or damaged contractor owned equipment or materials.
15) Differing Site Conditions: Bring any unforeseen project conditions to the attention of the
Contracting Officer immediately. Differing site conditions, which may alter the scope of work, shall be approved by the CO prior to such work being performed.
16) AT/FP Provisions:
1.Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy.
Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1b. For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 10- 245, AFI 31-101 and AFMAN 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
4. Antiterrorism Awareness Level I Training (AT Level I). This standard language is for contractor employees with an area of performance within a US Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 45 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on Joint Knowledge Online (JKO) at https://jkodirect.jten.mil/Atlas2/ faces/page/login/Login. seam. For those without a CAC, select" Non-CAC" user on the JKO site. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative.
17) Material Submittals: The contractor shall submit to the CO for approval all items listed in the specifications booklet on an AF Form 66 within 10 calendar days of the notice to proceed - or - provide a copy of the AF Form 66 indicating when each material submittal shall be submitted for approval. Ensure that any disapproved material submittal will not impact the approved project execution schedule, as disapproved submittal shall not be considered grounds for a time extension. Allow for a minimum of 14 calendar days and maximum of 30 calendar days for the Government’s processing of material submittals. The contractor shall not order, deliver or install any materials without CO’s material approval.
Remove any materials on site, which have not been properly approved.
18) Damage to Government Property: Any damage caused by the contractor or subcontractor to any Government property while the contractor is on base shall be replaced or repaired to the satisfaction of the Government by the contractor at no cost to the Government.
19) Trash, Refuse & Debris: The contractor shall not use any Government disposal bins, dumpsters or trash receptacles for any reason at any time. The contractor shall provide appropriate disposal bins/trash receptacles. Approval of disposal bins/trash receptacles location(s) shall be coordinated through Government project manager. The contractor shall not allow debris to leave the work area due to potential damage to aircraft engines.
Contractor shall coordinate with the base. All debris or trash shall be disposed of off base.
All demolition debris shall be disposed of at a permitted landfill, with landfill authorization, unless other arrangements have been coordinated through the EMO. Provide proof of landfill disposal from the landfill that accepts the materials. This may be accomplished by providing the Government project manager with landfill receipts; waste manifests, or weight tickets from the landfill that accepts the construction debris.
20) Communications Cabling: Any communication cabling and/or pathways and/or equipment shall not be altered without prior written approval of the 139th communications flight.
Contactor must ensure any installed equipment, ductwork, piping, electrical etc., does not obstruct future access to existing communication cabling and pathways. Any cost associated with CF approved alterations will be the responsibility of the contractor. Under no circumstances will the contractor void the Governments current inside plant certification and warranty.
21) Sustainable Procurement Requirements: Where applicable on products meeting the EPA’s requirements of the Comprehensive Procurement Guide for postconsumer content and total recovered content should be considered, if feasible.
Carpeting 25% postconsumer LVL Flooring 50-99% postconsumer Concrete 0-40% Fly ash can be use
22) Information Assurance Contractor Training and Certification (JAN 2008)
a) The Contractor shall ensure that personnel accessing information systems have the proper and current information assurance certification to perform information assurance functions in accordance with DoD 8570.01-M, Information Assurance Workforce Improvement Program. The Contractor shall meet the applicable information assurance certification requirements, including—
i) DoD-approved information assurance workforce certifications appropriate for each category and level as listed in the current version of DoD 8570.01-M; and
ii) Appropriate operating system certification for information assurance technical positions as required by DoD 8570.01-M.
b) Upon request by the Government, the Contractor shall provide documentation supporting the information assurance certification status of personnel performing information assurance functions.
c) Contractor personnel who do not have proper and current certifications shall be denied access to DoD information systems for the purpose of performing information assurance functions.
23) Inadvertent Archeological Finds: In case of an inadvertent discovery of a cultural or archaeological resource, the following applicable actions will be taken immediately:
a) Workers will cease all excavation activity, ensure the site is secured, and contact Base Civil Engineering at 816-236-3318.
b) The Environmental Office (EMO) will ensure that activities have ceased at the discovery site and that the site has been secured from human and natural forces.
c) The Environmental Office will notify any applicable tribal Governments and State Historic Preservation Office (SHPO) of the discovery. SHPO will determine if the State Archaeologist should be contacted.
d) The Environmental Office will notify the Base Judge Advocate General (JAG), Installation Commander, NGB/A7CV and the base Public Affairs Officer (PAO).
e) If the Environmental Manager (EM) has reason to believe that Native American human remains, funerary or sacred objects have been discovered, the EM will provide immediate telephone notification of the discovery, along with written notification by certified mail, to the Department of the Interior’s Departmental Consulting archaeologist (DCA) at the following:
Archaeological Assistance Division National Park Service Washington, D.C.20013-7127 Telephone: 202-343-4101
END SECTION
22 August 2025
File details come from the government source that posted it. Updated .