C4 - Abstract 1419 - Construction.pdf
PDF 237 KB Posted
- Attached to
- Rausin Auditorium Renovation Federal contract opportunity
- Solicitation number
- W50S7G-25-B-A007
- Issued by
- Department of the Army National Guard
About this file
This Abstract of Offers - Construction document details a solicitation for the Rausin Auditorium Renovation project (UYLB242014) issued by the 139th AW Base Contracting office. The solicitation number W50S7G25BA007 was issued on 20 August 2025, with offers opened on 22 September 2025. Five contractors submitted bids: Red Line Contractors LLC, Reagent World Inc, DDL Group LLC, Lee Grover Construction, and an unnamed fifth bidder.
The project includes a base bid and an additional bid for an ADA Stair Lift. Bid prices vary across contractors, with the base bid ranging from $445,749.50 to $681,200.00 and the ADA Stair Lift component ranging from $29,750.00 to $75,000.00. Two amendments were issued during the solicitation process, and all bidders acknowledged these amendments. Bid securities were varied, with some contractors providing security and others not. The government estimate for the project was $520,749.50, and the certifying official is Capt Adam Danner from the 139th AW Base Contracting office located in St. Joseph, MO.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| bid opening sign in.pdf | ||
| Solicitation Amendment - W50S7G25BA0070002.pdf | ||
| Solicitation Amendment W50S7G25BA0070001 SF 30.pdf | ||
| QA 1 - Rausin Auditorium.pdf | ||
| SOW Rausin Remodel 15SEPT25.pdf | ||
| prebid signin rausin.pdf | ||
| B7- Rausin Pre-Bid Conference PP.pdf | ||
| SOW Rausin Remodel.pdf | ||
| Wage Rate - MO20250081 Mod 09 14AUG2025.txt | TXT text file | |
| Solicitation - W50S7G25BA007.pdf | ||
| Drawings Rausin Remodel -7AUG25.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. DATE ISSUED 20
AUG 2025
3. DATE OPENED
22 SEPT 2025
PAGE 1 OF
4. ISSUING OFFICE
X
7A.
ITEM
NO. 7B. DESCRIPTION OF OFFERED ITEM
7C. EST
QUANTITY
D.
UNIT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
1 BASE BID 1 JOB $445,749.50 1,472,415.80$ $948,626.00
2 ABI 1 - ADA Stair Lift 1 JOB 75,000.00$ 42,000.00$ $29,750.00
AMENDMENT(S) ACKNOWLEDGED: Yes
ABSTRACT OF OFFERS - CONSTRUCTION
1. SOLICITATION NUMBER W50S7G25BA007
I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.
NAME AND TITLE OF CERTIYING OFFICIAL (Type) CAPT ADAM DANNER
DATE SIGNED
A. OFFEROR: Red Line Contractors LLC
AMENDMENT(S) ACKNOWLEDGED: Yes
5. Project Title:
C. REASONABLE CONTRACT
(Including Profit)
SIGNATURE
6. NO. OF AMENDMENTS ISSUED:
A. OFFEROR: Reagent World Inc
B. BID SECURITY (Type and Amount) No
139th AW Base Contracting 705 Memorial Dr.
St. Joseph, MO 64503
Rausin Auditorium Renovation, UYLB242014 A. HIRED LABOR
NO. 1 NO. 2
B. BID SECURITY (Type and Amount): NoB. REASONABLE CONTRACT (Without Profit)
8. GOVERNMENT ESTIMATE
(Check A, B, or C and complete D, E, and F)
9. OFFERS
$520,749.50 1,514,415.80$ $978,376.00 AUTHORIZED FOR LOCAL REPRODUCTION NOTE: If more than two offers are received, continue on OF 1419A. OPTIONAL FORM 1419 (11-88)
PAGE 2 OF _2_ PAGES
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
E. UNIT
PRICE
F. ESTIMATED
AMOUNT
1 1 JOB 681,200.00$ $464,995.00
2 1 JOB 53,400.00$ $76,463.00
-$ 734,600.00$ $541,458.00
AUTHORIZED FOR LOCAL REPRODUCTION OPTIONAL FORM 1419A (11-88)
1. SOLICITATION NUMBER: W50S7G25BA007
ABSTRACT OF OFFERS - CONSTRUCTION
CONTINUATION SHEET
NO. 3 NO. 5
C. AMENDMENTS ACKNOWLEDGED:
A.
ITEM
NO.
B. BID SECURITY (Type and Amount) Yes - %20
A. OFFEROR: DDL Group LLC
C. AMENDMENTS ACKNOWLEDGED - Yes
C.
UNIT
INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.
2. PROJECT TITLE Rausin Auditorium Renovation, UYLB242014
CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED - Yes
NO. 4
B.
ESTIMATE
D
QUANTIT
4. OFFERS (Continued)
C. AMENDMENTS ACKNOWLEDGED
B. BID SECURITY (Type and Amount)
A. OFFEROR: A. OFFEROR
NO.
A. OFFEROR: Lee Grover Construction
B. BID SECURITY (Type and Amount) - Yes- %20 B. BID SECURITY (Type and Amount):
| 1419 offeror 1-2 |
| 1419 offeror 3-6 |
| 2025-09-22T15:13:41-0500 | |
| DANNER.ADAM.DAVID.1266580980 |
File details come from the government source that posted it. Updated .