This document is an amendment to a solicitation for the construction of a C-130 Flight Simulator Facility. The amendment provides revisions to drawings and specifications, including adding an option to the base bid for additional aggregate surface course adjacent to a gravel parking area. It also changes clean agent fire extinguishers in the specifications from HCFC blend or FE-36 agents in enameled steel containers to FE-36 agents in steel containers. The amendment further directs changes to door hardware groups and additions of fire extinguisher cabinets and extinguishers in mechanical and electrical rooms. The solicitation number is provided as W50S7G-20-B-0001 and is issued by the Department of the Army National Guard for the construction in accordance with the solicitation documents, plans, specifications and performance work statement.

View the file

Other files

File Type Posted
C4 - Abstract of Offers SF1419.pdf PDF
B8 - Q and A 17 July 2020.docx DOCX document
Bid Opening Location Map.pdf PDF
B8 - Q and A 16 July 2020.docx DOCX document
B8 - Q and A 15 July 2020.docx DOCX document
B8 - Q and A 14 July 2020.docx DOCX document
W50S7G20B00010003 Amendment 3.pdf PDF
B8 - Q and A 10 July 2020.docx DOCX document
W50S7G20B00010002 Amendment 2.pdf PDF
B8 - Q and A 09 July 2020.docx DOCX document
B8 - Q and A 08 July 2020.docx DOCX document
W50S7G20B00010001 Amendment 1.pdf PDF
B8 - Q and A 02 July 2020.docx DOCX document
B8 - Q and A 26 June 2020.docx DOCX document
B7 - Q and A 19 June 2020.docx DOCX document
B7 - Pre-bid Conference Minutes.pdf PDF
B7-Pre-Bid Conference PP.pptx PPTX presentation
B7 - Construct Simulator Pre-Bid SIGN IN SHEET.pdf PDF
B7 - Q and A 18 June 2020.docx DOCX document
A3 - Construct Simulator Facility PWS 25 Mar 2020.pdf PDF
B8 - Att 6 JA Brandname (Schlage)_Redacted.pdf PDF
B8 - Att 5 JA Brandname (Monaco)_Redacted.pdf PDF
W50S7G20B0001 Construct C-130 Flight Simulator Soliciation.pdf PDF
B8 - Att 8 Checklist for Bid Bonds.doc DOC document
B8 - Att 7 JA Brandname (Automated Logic)_Redacted.pdf PDF
B8 - Att 4 JA Sole Source (Advantor)_Redacted.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ULYB169010

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to make revisions to the draw ings and/or specifications.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Jul-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W50S7G20B0001

X 9B. DATED (SEE ITEM 11)

09-Jun-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Jul-2020

CODE

USPFO MO 139 MISSION SUPPORT CONTRACTING

705 MEMORIAL DRIVE

SAINT JOSEPH MO 64503-9307

W50S7G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S7G20B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0004

This addendum forms a part of the Contract documents and modifies the Bidding Documents with amendment and additions noted below. Acknowledge receipt of this Addendum in the Bid form. Failure to do so may subject the Proposer to disqualification.

CHANGES TO SPECIFICATIONS:

A. SPEC Section 012300 – Options, Paragraph 3.2, F to read:

1. Base Bid: Provide parking as shown in the Base Bid documents.

2. Option: ‘Add’ cost for all materials, equipment, labor and incidentals to install additional 502 square yards of 6” aggregate surface course adjacent to the gravel parking indicated on drawing C-201.

B. SPEC 104416, paragraph 2.2, C – Clean Agent Type in Brass Container shall be changed to:

Clean Agent Type in steel container: UL rated 1-A:10-B:C, 9.5-lb (4.3-kg) nominal capacity, with HCFC blend agent or FE-36 agent and inert material in enameled-steel container; with pressure-indicating gage.

C. The lock at DOOR 105A (Hardware Group 4) should read: One (1) High Security Lock Model: LKM10K Manufacture: Lock Master

CHANGES TO DRAWINGS:

A. Drawing G-102 Life safety Plan: Provide the two (2) clean agent extinguishers plus the two

(2) wall hung ABC, 10# extinguishers in the mechanical and electrical rooms per drawing A- 101, Note 29. In addition provide two ABC, 10# extinguishers along with two (2) semi recessed aluminum fire extinguisher cabinet with glass in door in between metal studs of a sheetrock wall. Location of cabinets will be determined later.

(End of Summary of Changes)