B8 - Q and A 14 July 2020.docx

DOCX document 35 KB Posted

Attached to
C-130 Flight Simulator Facility
Solicitation number
W50S7G-20-B-0001-Solicitation
Issued by

About this file

This document contains questions and answers regarding a solicitation to construct a C-130 Flight Simulator Facility for the Department of the Army National Guard. Key details include that the solicitation involves constructing the facility in accordance with provided plans, specifications, and a performance work statement. It will require products and services such as insulated metal wall panels, flooring materials, protective technical barriers, roofing, and bridge cranes. Questions cover clarifications on these and other requirements, including substitutions and clarifications on drawings and specifications.

View the file

Other files

File Type Posted
C4 - Abstract of Offers SF1419.pdf PDF
B8 - Q and A 17 July 2020.docx DOCX document
B8 - Q and A 16 July 2020.docx DOCX document
Bid Opening Location Map.pdf PDF
W50S7G20B00010004 Amendment 4.pdf PDF
B8 - Q and A 15 July 2020.docx DOCX document
W50S7G20B00010003 Amendment 3.pdf PDF
B8 - Q and A 10 July 2020.docx DOCX document
W50S7G20B00010002 Amendment 2.pdf PDF
B8 - Q and A 09 July 2020.docx DOCX document
B8 - Q and A 08 July 2020.docx DOCX document
B8 - Q and A 02 July 2020.docx DOCX document
W50S7G20B00010001 Amendment 1.pdf PDF
B8 - Q and A 26 June 2020.docx DOCX document
B7 - Q and A 19 June 2020.docx DOCX document
B7 - Construct Simulator Pre-Bid SIGN IN SHEET.pdf PDF
B7 - Q and A 18 June 2020.docx DOCX document
B7 - Pre-bid Conference Minutes.pdf PDF
B7-Pre-Bid Conference PP.pptx PPTX presentation
W50S7G20B0001 Construct C-130 Flight Simulator Soliciation.pdf PDF
B8 - Att 4 JA Sole Source (Advantor)_Redacted.pdf PDF
A3 - Construct Simulator Facility PWS 25 Mar 2020.pdf PDF
B8 - Att 8 Checklist for Bid Bonds.doc DOC document
B8 - Att 7 JA Brandname (Automated Logic)_Redacted.pdf PDF
B8 - Att 5 JA Brandname (Monaco)_Redacted.pdf PDF
B8 - Att 6 JA Brandname (Schlage)_Redacted.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construct C-130 Flight Simulator Facility Question and Answer’s14 July 2020
1.Q: Be advised that the drawings do not reflect what the various colored locations means provide a key for the drawings that clearly calls out what is to be installed and where.
A: More information is required to answer question. Which drawings are being referenced?

2. Q: Bridge Crane & Simulator Interlock Detail, can we ask the Simulator controls company if we can send a dry contact via remote I/O? We do this quite often and use two different styles but would prefer to do it this way.

1. Banner PM2 Kit as shown. Can be 900MHZ or 2.4 GHz – see attached for clarity.

2. One Gateway would be mounted on the crane and a Node on the Simulator Controls A: Coordinate interlock requirements with simulator and crane manufacturers.

3. Q: Are we allowed to send an electronic link to the plans to potential subs and suppliers or do they have to go to SAMS and be registered and get their own link?

A: Please do not post on any sites for everyone to see. They can be given to subcontractors for bidding purposes only.

4.Q: In the specs it says that if awarded the job you would have to have background checks for anyone working on site as well as the “real id/passport”. Is this still going to be required for this project even though the project location is not inside the security fence?
A: Background checks will be required for all workers. Once Real ID is in effect, the contractor shall be prepared to comply with security requirements. Contractor is responsible for monitoring when Real ID takes effect of Missouri by checking the Department of Homeland Security and Missouri Department of Revenue websites.
5.Q: Are you required to have a construction fence?
A: No, but you are responsible for your job site and securing any material you may have there.
6.Q: Is it still 14 days for the background checks to be run?
A: Yes, as of right now that has not changed to a longer timeframe due to the current circumstances.
7.Q: The pre-bid PowerPoint specified a pre-engineered metal building, is that correct?
A: No, this is not a pre-engineered metal building. Please follow the specifications and drawings
8.Q: Is there project management software like ProCore required on this project?
A: Not required but if you would like to propose to use something that is up to you.
9.Q: If this project is set aside for a small business, does this apply to the subs as well? What is the dollar amount considered for a small business?
A: The set aside is for the awardee of the Government Contract (Prime Contractor). For the NAICS related to this solicitation 236220 the dollar amount is $39,500,000.00 in average annual receipts.
10.Q: The resinous flooring spec calls for 100% solids epoxy primer and two coats of aliphatic urethane with a total of 20mils in one sections and for a troweled system in another section. The standard thin mil system would be 2 coats of 100% solids epoxy with one topcoat of aliphatic urethane with the oxide broadcast. The standard troweled system would be a nominal ¼” of epoxy mortar with the above system as the topcoats. Also, the finish schedule calls out for a resinous cove/ceramic cove base in rooms 110,111,112,113 all of the drawings show ceramic base to the floor.
A: See Amendment 0001

11. Q: Is there a preferred bridge crane manufacturer?

A: There is no preferred bridge crane manufacturer. The bridge crane is to meet the requirements indicated in the construction documents. Spec section 41 4413.15, paragraphs 1.9.A and 1.9.B indicate manufacturer and installer qualification requirements.

12.Q: The enlarged floor plan keyed notes on page A-402 indicate a fabric wrapped acoustical wall panel per note #24 at the breakroom. I did not see this product in the specifications or listed on the finish schedule page. Is there a manufacturer/product info for this?
A: Refer to SECTION 098433 - SOUND-ABSORBING WALL UNITS issued as part of

Amendment 0001.

13.Q: On sheetA-601 and A-701 call for a protective technical barrier system. Is there any specifications for this system?
A: Refer to SECTION 132754 – PROTECTIVE TECHNICAL BARRIER issued as part of

Amendment 0001.

14.Q: Is this project to be LEED certified? If not what parts of specification section 018113.13 Sustainable Design Requirements are we to follow.
A: Specification 01 81 13.13 Sustainable Design Requirements conforms with the project pursuing GBCI Guiding Principles. In the attachment to the specification GPA DoD Project Information Form the compliance paths that are utilizing LEED Credit(s) are called out.
15.Q: Section 087100 Door Hardware is listed in the table of contents of the spec book. The actual section is numbered 084413 Door Hardware. Within this section there is reference to Division 28 Electronic Safety and Security. I find no such spec referenced in the table of contents or included in the specs. This is also related to one of the non-competitive bid items for the Advantor IDS system. Will a Division 28 spec for the IDS be issued?
A: Refer to revised SECTION 07100 – DOOR HARDWARE issued as part of Amendment 0001.
16.Q: Is there a geotechnical report available for the C-130 Flight Simulator site?
A: Refer to Geotechnical Study by Millennia Professional Services Ltd dated December 13, 2018. Attached in beta.SAM as part of “Combined Revised Specs, Drawings & Geotech Report Amendment 0001”.
17.Q: I find no spec for termite treatment. Is termite treatment a part of this project?
A: Termite treatment is not required for this project.
18.Q: Is builder’s risk, flood, and quake insurance required for this project? If yes, who is providing owner or contractor?
A: See Section 01000 for Insurance Requirements

19. Q: Overhead Door Substitution Request.

A: The proposed substitution, CHI Overhead Door Model 3216, does not meet the STC rating requirements and is not accepted. Provide an overhead door as specified.

20. Q: Detail C2/C-600 shows 1.4/1.4 mesh in the sidewalks with a 6 mil vapor barrier underneath. Detail C4/C-600 has not vapor barrier and 2.9/2.9 mesh. I assume the vapor barrier is not required, correct? Which size mesh is the sidewalks to receive?

A: No vapor barrier is required under the sidewalk and the wire fabric should be W1.4 in the sidewalks.

21.Q: Can you please provide sizing and requirements for the mechanical yard concrete slab, if required?
A: At minimum, the pad must extend 4 inches past all sides of the chiller. The chiller shown on M-401 is the basis of design, but installed chiller may have slightly different dimensions. Refer to detail S-502/A2 for exterior equipment pad detail.
22.Q: There is a note for a bench in Room 110, but there are no details of what is required. Please advise.
A: Refer to details A1/SK-A-542 and A2/SK-A-542 issued as part of Amendment 0001.
23.Q: Are the windows sills shown on detail A4/A-712 to be solid surface? The detail does not state what they are.
A: Provide solid surface window stools from an excepted manufacturer listed in specification section 123661.16 – SOLID SURFACING COUNTERTOPS, paragraph 2.1, A. 1.
24.Q: Are there any corner guards required? Detail C4/A-712 shows a corner guard at the head of a storefront door but the detail is not used anywhere. I don’t see any other details, notes, or specifications for corner guards. Please clarify.
A: See Amendment 0001
25.Q: Is this a “LEED” certified project? Based on specification 18113 – Sustainable Design Requirement it appears to be, but nothing was mentioned in the prebid about it. If required, are we required to have a LEED accredited professional to handle the requirements as stated under 1.9, A? If so, we will not be able to bid the project as we do not have anyone on our staff that is.
A: See Amendment 0001. Section 18113 – Sustainable Design Requirements issued as part of Amendment 0001.
26.Q: Fabric Wrapped Acoustic Wall Panels (note #24 on sheet A-402) are shown on the walls of the Lobby. Please provide a spec for these panels.
A: Refer to SECTION 098433 - SOUND-ABSORBING WALL UNITS issued as part of

Amendment 0001.

27.Q: A roof hatch is shown but no spec provided. Please provide spec.
A: Refer to revised SECTION 077200 – ROOF ACCESSORIES issued as part of

Amendment 0001.

28. Q: The specification on this project calls for 2 ½” and larger piping to be Schedule 40 steel pipe and either Class 125 cast-iron or class 150 malleable-iron fittings and threaded joints (see attached spec pages 467 & 468). Standard practice for this size piping is to use either grooved pipe and fittings or butt-weld pipe and fittings. The CWS/R piping in the mechanical room and out to the chiller and the HHWS/R piping are mostly 2 ½” & 3”; lots fittings and joints A: US manufactured grooved fittings and associated products are acceptable in the mechanical room and chiller yard only. Butt welded fittings are an acceptable fitting for general use.

29.Q: The specs show a Class A finish on the walls on page 5 of “Concrete Forming and Accessories”. The drawings show most of the walls below grade. Is a Symons formed wall acceptable?
A: A Symons formed wall is acceptable if the form can achieve a Class A finish.
30.Q: Can the 7 5/8” walls be poured at 8” wide?
A: 8” wide concrete walls are acceptable.
31.Q: Is waterstop required in the foundation walls?
A: A waterstop is not required in the foundation walls
32.Q: Please provide a detail for the trash enclosure. Block walls with footings?
A: Refer to the screen wall details on SK-A-302 issued as part of Amendment 0001.
33.Q: Is there any elevated concrete or storm shelter caps required?
A: Please clarify question with a specific reference to drawings or specifications.
34.Q: Note 8 on S-101 mentions levelness requirements on the motion base. The second part says “within 0.2 inch between any two base pads” Does this mean we have to break up the 30’ x 30’ pad into multiple pours? Or that it needs to be within 0.2 inches between two separate quadrants?
A: The 30’x30’ mat slab needs to be a monolithic pour. The 0.2” is referring to the flatness of the pad at the 3 base pads for the simulator. There should be no more than a 0.2” elevation difference between the simulator base pads. Coordinate this requirement with the manufacturer of the simulator.
35.Q: Is rigid insulation required at perimeter foundation walls only? Or the all of the walls?
A: Provide rigid insulation at perimeter foundation walls as shown in the construction documents.
36.Q: Specs call out the sidewalk as fiber mesh reinforced. The drawings show 6x6 W2.9 x W2.9 WWF, which one are we going with?
A: See Amendment 0001
37.Q: Are the #4 tie bars for longitudinal joints shown on B1/C-601 required in addition to the WWF shown for sidewalks and pavement shown on C-600?
A: Tie bars are not required for sidewalks
38.Q: Is there a specified mix required for the exterior concrete pavement?
A: Mix requirements shall conform with Section 2208.3 “Materials” number 4, MoDOT, of the Kansas City Metropolitan Chapter of the American Public Works Association’s, Division II, Construction and Material Specifications, Section 2200 Paving.
39.Q: Is specification 060660 Plastic Fabrications referring to D1 and D2 on A-402.
A: Yes, refer to specification 060660 - Plastic Fabrications for screen walls shown in D1 and D2 on A-402.
40.Q: Can you find out what the height of the wire mesh partitions are to be in Parts Storage 127?
A: See Amendment 0001
41.Q: Bid options 007, 008, and 009 appear to be the exact same thing. Is this correct? Are we to provide three cost for 2500 cubic yards of fill?
A: Bid Options 007, 008, and 009 are the same. Provide price for each option separately.
42.Q: There are two details on sheet A-402 showing some Co-Polyester Resin System Panels. Is there a specification on these?
A: Refer to specification 060660 - Plastic Fabrications for screen walls shown in D1 and D2 on A-402.
43.Q: Insulated metal wall panels: Are they horizontal and vertical panels the same color?
A: Refer to revised EXTERIOR FINISH SCHEDULE on drawing A-201 as part of Amendment 0001.
44.Q: Insulated metal wall panels: Do you know the color to match? Drawing legend only specifies to match building 303.
A: Refer to revised EXTERIOR FINISH SCHEDULE on drawing A-201 as part of Amendment 0001.
45.Q: Insulated metal wall panels: What width are the panels? 36” is specified but drawings show both 24” & 30”.
A: Refer to revised SECTION 074213.19 - INSULATED METAL WALL PANELS and drawing A-201 as part of Amendment 0001.
46.Q: Insulated metal wall panels: Which Centria 2” Versawall panel is basis of design? Verawall V, Versawall V+ or Versawall H+?
A: Refer to revised SECTION 074213.19 - INSULATED METAL WALL PANELS as part of Amendment 0001.
47.Q: Insulated metal wall panels: Which profile? Flat, Planked or Striated?
A: Refer to revised SECTION 074213.19 - INSULATED METAL WALL PANELS as part of Amendment 0001.
48.Q: In specification 412213, under 2 – Definitions, item “a”, it mentions a walkway. I am not seeing where a walkway is discussed anywhere else. Are you wanting a walkway for the bridge crane? If so, are you just wanting a walkway to the control box or are you wanting a walkway across the entire bridge, or something else?
A: The definitions in Section 2 are general terms or items typically associated with a bridge crane system. The crane for this project does not require any type of walkway.
49.Q: To clarify, We can use other manufacturers of products that are not listed in a particular specification as long as they meet the specified requirements and are not one of the sole source suppliers you list, correct?
A: Products and Manufacturers not listed in the construction documents may only be used if they meet the requirements indicated in specification sections 016000 – PRODUCT REQUIREMENTS and 012500 – SUBSTITUTION PROCEDURES.
50.Q: Substitution request for specification 084113 and 084413.
A: For product substitution requests, follow the procedures and requirements as indicated in specification section 012500 – SUBSTITUTION PROCEDURES. The substitution request as submitted is not accepted. Provide Glazed Aluminum Curtain Walls and Aluminum-Framed Entrances and Storefronts as specified.
51.Q: The Tele/data drawings call for us to pull cabling from the new building to building 301. We do not see the building on the tele/com drawings or the civil drawings. Can we get a drawing showing the footage and route we will need to take so we can have an accurate footage and take off?
A: Distance from new Simulator Facility to building 301 (ITN) using existing and planned underground communications ductbank is approximately 1580 LF plus what is needed above ground for termination of cable.
52.Q: Is Air Barrier required to be installed where the IMP’s are being installed over the block? It appears that air barrier is only detailed to be installed at locations of brick veneer.
A: The Insulated Metal Wall Panel system serves as an air barrier, provide continuation from fluid applied air barrier to the Insulated Metal Wall Panel system serves as indicated in the details.
52.Q: Is there to be sheathing installed over the exterior face of cold formed metal framing behind the IMP’s or is the metal furring attached directly to the metal studs? The details do not appear to shown any sheathing except on the back side of the parapet walls.
A: Sheathing is not required behind the Insulated Metal Wall Panel system unless otherwise indicated.
53.Q: Detail A2/A-511 shows a waterproof membrane and drainage board. Is this just to be installed over the brick that is below grade or is it to extend all the way down to top of footing?
A: The waterproof membrane and drainage board is intended where the brick veneer comes in contact with the grade or aggregate mow strip. It is not intended to extend to the footing.
54.Q: Who provides all Testing for the project? Owner or Contractor
A: The Contractor is responsible for Tests and Inspections. Refer to specification section 014000 – QUALITY REQUIREMENTS, paragraph 1.9.
55.Q: Option 005 states to remove existing road. Do we only remove the asphalt only?
A: Asphalt and rock base to be removed and road graded as necessary to provide positive drainage.
56.Q: The response to question #20 does not match the information issued in “Change to Specifications” item G. One indicates sidewalk are to have W1.4xW1.4 WWF and the other says sidewalk get W2.9xW2.9. Which is correct?
A: Wire fabric is to be 6”x6” – W1.4 x W1.4 for all sidewalks
57.Q: On sheet E601 there are (8) items that have a disconnect symbol with a CB inside the symbol This would indicate a "circuit breaker" but the symbol would indicate a "Disconnect" please advised on what is to be figured.
A: For the ENCLOSED CIRCUIT BREAKER symbol, refer to E-001, SWITCHES AND CONTROLS.
58.Q: From specification 84113. There is no information given to know what testing is required or what is even to be tested. 1.5 INFORMATIONAL SUBMITTALS A. Preconstruction Laboratory Mockup Testing Submittals: 1. Testing Program: Developed specifically for Project. 2. Test Reports: Prepared by a qualified preconstruction testing agency for each mockup test. 3. Record Drawings: As-built drawings of preconstruction laboratory mockups showing changes made during preconstruction laboratory mockup testing.
A: The testing information is provided by the manufacturer for the testing indicated in specification paragraph 2.2 PERFORMANCE REQUIREMENTS.
59.Q: Will there be a tile allowance or a specific tile provided for bidding purposes? The specifications list several manufactures but a specific tile is not called out.
A: For flooring materials, provide the following products:
CWT Basis-of-Design
Manufacturer: Crossville Ceramics
Series: Color By Numbers
Contractor shall submit color samples for final selection during submittal phase
Size: 4”x8”
Grout Basis-of-Design
Manufacturer: ISC Surfaces Tecnicolor (TEC)
Contractor shall submit color samples for final selection during submittal phase
60.Q: Can you please answer the following concerning the roofing specification 75323 and verify what is acceptable and required. Please note that if a Fleece back EPDM is required there is only one manufacturer that makes this (Carlisle), which would make this a closed spec.
A: Provide a Type I non-reinforced 90mill white EPDM.
61.Q: Specification 075323 calls for ASTM D4637 Type II in a white reinforced EPDM. There is not a white reinforced 90 mil EPDM sheet so it cannot meet that ASTM Type II.
A: Provide a Type I non-reinforced 90mill white EPDM.
62.Q: In the spec there is a section for Telephone Specialties for a cellphone charging locker. Do you know where this is located on the drawings?
A: Refer A1/A-401 for location of cellphone charging locker. Refer to specification section 101700 – TELEPHONE SPECIALTIES.
63.Q: The specs and finish legend don’t clearly state which styles of flooring they’d like to use. Would you like us to use material allowances? If so what should they be.
A: For flooring materials, provide the following products:
LVT Basis-of-Design
Manufacturer: Tarkett
Series: Contour
Contractor shall submit color samples for final selection during submittal phase
ESD Basis-of-Design:
Manufacturer: Armstrong
Series: Static Dissipative Excelon SDT
Contractor shall submit color samples for final selection during submittal phase
Size: 12”x12”
CPT Basis-of-Design
Manufacturer: Patcraft
Series: Construkt
Style Name: Z6474 – Intrinsic
Contractor shall submit color samples for final selection during submittal phase
64.Q: On the finish schedule sheet A-601 the only room notated to have the “Protective Technical Barrier” is Network 128. In looking at sheet A-701 wall type “0J” shows ¾” expanded metal mesh. It doesn’t show or state to have the “PTB”. Does this wall type just have ¾” expanded metal mesh but not the “PTB” or does it require the “PTB” as well?
A: Partition type 0J does not require PTB.
65.Q: Specification 075323 EPDM Roofing 1.5 A 1 This project requires a RoofNav Assembly listing. Of the manufacturers listed none have an assembly that will match.
A: Provide as specified along with answer to question 66.
66.Q: Specification 075323 EPDM Roofing 2.2 A - Scrim or reinforced. To my knowledge no manufacturer including the ones listed in this spec makes a 90 mil EPDM white sheet that is reinforced. All are 75 mil. Please advise if 75mil. is acceptable.
A: Provide a Type I non-reinforced 90mill white EPDM.
67.Q: Specification 075323 EPDM Roofing 2.4 B. Extruded Polystyrene Board 25 psi. Will standard poly ISO be acceptable? This material is more common.
A: Poly ISO as recommended by the EPDM Roofing manufacturer for the application is acceptable.
68.Q: Specification 075323 EPDM Roofing - No coverboard listed, this will be required to receive a hail rating of any kind.
A: Refer to question 67. The SH hail-resistance rating without a coverboard.
69.Q: Is the project a LEED project? If so, what level and is there a “LEED Checklist” available for the project?
A: See Response to question 14.
70.Q: Sheet A-121, note 106 calls for a “Non Penetrating Fall Protection Guard Rail System”. Specification 77200, 2.4, A states what is required for this guardrail system, but there is also a separate specification 77210 – Rooftop Fall Arrest System. This is not shown on the plans and is a completely different type of system from the guard rail system. Was specification 77210 included by mistake and thus not applicable to this project? Please clarify.
A: Provide a non-penetrating railing system for roof edge protection as indicated in specification section 077200 – ROOF ACCESSORIES and drawing A1/A-121. Specification section 077210 – ROOFTOP FALL ARREST SYSTEM is removed, See amendment 0002.
71.Q: Co-Polyester Resin System Panels” shown on Details D1 and D2 of sheet A-402. What is shown doesn’t appear to be what is specified and the suppliers are having trouble figuring out what to provide.
A: For the screen wall shown in drawings D1 and D2 on A-402, provide basis-of-design product or equal as indicated in specification section 060660 – PLASTIC FABRICATIONS, paragraph 2.2, A.
73.Q: Can you provide more details regarding the carpet tile specs, i.e. gauge, face weight, size of tiles, backing info.
A: See response to question 63.
74.Q: For the LVT , we cannot find a tile with a 32 mil wear layer. Would a 28 mil wear layer be acceptable?
A: See response to question 63.
75.Q: Can you please verify the attached IMP panels would be acceptable to use for the Simulator Project.
MPW-1 was spec'd Centria Versawall H+. AWIPs closest profile would be our FL40
MPW-2 was spec'd Centria Versawall V striated. AWIP would use the ST40.
Both AWIP panels would be 40'' wide.
A: For product substitution requests, follow the procedures and requirements as indicated in specification section 012500 – SUBSTITUTION PROCEDURES. The substitution request as submitted is not accepted.
76.Q: Technical barrier….If we were to put a proposal together, our proposal would assume that we would be bidding an alternate to the current design and shielding performance because the design simply does not allow for a guaranteed level of shielding performance, especially up to 10GHz. To give you an idea of the design modifications we would be assuming in our proposal, here are some examples:
The current design shows the protective technical barrier to be installed on the walls only. In order to provide a guaranteed level of shielding performance, the protective technical barrier will also need to be installed on the entire floor and ceiling. While it can be installed directly onto concrete for the floor, we would require a substrate of either sheetrock or plywood, similar to how the walls are built, for us to install this material on the ceiling.
The current design also only allows for the shielding performance to be guaranteed prior to the second layer of sheetrock being installed. Once that second layer of sheetrock is installed, it is screwed through the protective technical barrier. Each screw is a potential antenna allowing for signal to be transmitted through the shield and when we test the entire shield in accordance with IEEE-299, we will find each and every leak in the protective technical barrier. In order for us to guarantee shielding performance, that second layer of sheetrock would need to be installed on its own stud wall built inside of the RF-shielded space.
I do not specifically see in the requirement where they talk about penetrations into the shielded space. For us to guarantee shielding performance, each and every MEP, fire protection and data line that needs to penetrate the shielded space needs to be RF-shielded. This means that all power lines will need to run through and RF filter, all ducting will need to run through honeycomb vents and all liquids will need to be run through pipe penetrations.
The final item I saw in the requirements was that this shield needs to be ground isolated. While we can provide ground studs per the design, the design does not allow for an overall ground isolation to be guaranteed, even if all of our conditions are met.

A: Provide PTB as indicated in the partition types and the Room Finish Schedule. The floor does not require the PTB. Refer to specification for duct and pipe penetrations, wall to ceiling and wall to floor transitions, and wall fastener requirements. Coordinate grounding and filter method with selected WST Computer equipment. Waveguide or “Honeycomb” vents are not required.

77.Q: Referencing page TS-101 and T-601, we are trying to find out how far to run our 24 strand and 50 pair from the EX-MH-C22 to building 301 (241st Air Traffic Control Squadron). We cannot find a distance. Also, if we are running the wire to Building 301, will there be a detail for the telecommunications and where to land the cables?
A: See answer to question 51
78.Q: Is there a General Contractor/Plan Holder list that can be shared?
A: There is not a list of General Contractors/Plan Holders. The Pre-Bid sign-in sheet has been posted to beta.SAM for view.
79.Q: We have questions regarding the grating for the stair and platform (re: drawing A-421). Both welded and press-locked grating is called for in the specs. Which type is required?? The architectural drawing depicts press-locked. The structural drawing S-131 calls out welded grating. The specs also call for serrated grating, with spaces in grating no more than ½” (which does not agree with what is called out of the structural drawing). Also, the specs call for open risers, then also calls for toe plates at open back edge of tread.
A: Welded steel grating is required. Revise spec section 055119 0 METAL STAIR GRATING, paragraph 2.6, C. 2 ; See Amendment 0003.
80.Q: Detail A4/E-501 shows concrete encasing the electrical ductbank where it crosses under paved roads and paved parking areas. The Telecom drawing T-505 has a couple concrete encased ductbank details but doesn’t specify that it is only occurring under the paved areas. Can you please clarify if all Communications ductbanks are to be concrete encased regardless of location or if concrete encasement is just to occur under the paved areas like stated on the electrical drawings?
A: The entire run communications ductbank shall be encased in concrete. Refer to drawing A1/TS101 and details B2 and B3/T-503.
81.Q: Please see the attached substitution request as required per question #75 on the July 9 Q&A’s.
A: The proposed substitution for the insulated metal wall panel does not meet the requirements of the specifications and is not accepted:
1. Substitution does not meet the 22 gauge thickness for both the exterior face andinterior face of the panel.
2. The proposed substitution does also not meet the required width of 30"
82.Q: Please clarify the acronym “CAE” Key Note(s) on Sheet E-401.
A: At the time of the design, CAE is the name of the company that was the contractor for the weapon simulator. The items noted on E-401 are to be provided by the weapon simulator contractor.
83.Q: What is the required Asphalt Mix?
A: The asphalt mix requirements are identified in Section 321216 "Asphalt Pavement and Surfacing", under item 2.4 "Bituminous Pavement".
84.Q: Door 105A, hardware group 04. shows a high security lockset LML 10K made by LOMA. I cannot find this lock. Is there more information on the manufacturer and product that I can get?
A: Answer pending
85.Q: Door 105B, hardware set 05, shows the use of Von Duprin 35A panic device with an alarm. The 35A is for a narrow stile door. Door 105B is a flush door. Can I use a Hager 4500 series that is made for a flush door here?
A: Answer pending
86.Q: Regarding the FRP On Section 6400 (Part2—Products) Paragraph 2.2 it states: Gelcoat Finished & then on A. 4, it states smooth white. To my knowledge no manufacturers make a gelcoat finished smooth frp.
A: For the plastic paneling in JANITOR 113, provide plastic paneling as specified in section 066400 - PLASTIC PANELING and scheduled on A-601.
87.Q: Is the architect referring to the same panel on Drawing A402 when he states: Co-Polyester Resin System Panel? If so, then the smooth Class A FRP panels would need some type substrate to go behind the frp so that they will be solid, Such as plywood, gypsum, etc.
A: For the co-polyester resin system panels shown in the Screen Wall details D1 and D2 on A-402, provide a modular panel system as specified in section 060660 - PLASTIC FABRICATIONS
88.Q: We are struggling with understanding this 00600 Representations & Certifications form that goes with the bid. We are up to date with everything in SAMS but I am not sure I am filling this out correctly. I checked the first one on (2) “Paragraph (d) applies “I checked “(i) Paragraph (e) applies) on 252.204-7007 (2) Is that all we need to do? I am not sure what to do on the 6th page where it says: (2) The following representations and certifications in SAM are applicable to this solicitation as indicated by the Contracting Officer: [Contracting Officer check as appropriate]
A: Answer Pending
89.Q: The Acoustical Ceiling specification 95113 doesn’t state what to use or a basis of design. Are you just wanting to use the base standard but in 2’x2’ sizing?
A: Basis of design for acoustical ceiling is Armstrong 704A, 24”x24”, 5/8” thickness.
90.Q: On sheet L-101 and LD-501 the aggregate mow strip around the building shows 649 Cu. Yards of river rock material. I am assuming this is a misprint? Shouldn’t it be Cu. Feet? The plan sheet L-101 says the drawing scale is 1”=60’, but the in scaling the drawing it looks to be 1” = 20’. Please clarify.
A: See Amendment 0003
91.Q: I'm looking for clarification for the polyiso rigid insulation R-Value. Plans call for 6" ISO while the specs call for 1-1/2" with the top layer to meet minimum standard. R-30 or two layers of 2.6" should be more than enough to meet minimum requirements which typically runs R25-R30 in our region of NW MO.
A: Bid as Specified.
92.Q: What is the mailing address for the bid?
A: Box/item 7 on the SF1442 has the mailing address.