This document contains questions and answers regarding the solicitation to construct a C-130 Flight Simulator Facility. The solicitation is being conducted by the Department of the Army National Guard to build the facility in accordance with the provided solicitation documents, plans, specifications, and performance work statement. Key details addressed in the questions and answers include that subcontractors may be provided the plans for bidding purposes only, all workers on site will require background checks and valid identification, a construction fence is not required but the contractor is responsible for securing materials, Monday work must be approved in advance as an exception, and project management software is not required but can be proposed.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| Construct C-130 Flight Simulator Facility Question and Answer’s | 18 June 2020 | |
| 1. | Q: Be advised that the drawings do not reflect what the various colored locations means provide a key for the drawings that clearly calls out what is to be installed and where. |
A: Answer Pending with the A/E.
2. Q: Bridge Crane & Simulator Interlock Detail, can we ask the Simulator controls company if we can send a dry contact via remote I/O? We do this quite often and use two different styles but would prefer to do it this way.
1. Banner PM2 Kit as shown. Can be 900MHZ or 2.4 GHz – see attached for clarity.
2. One Gateway would be mounted on the crane and a Node on the Simulator Controls A: Answer pending with the A/E.
3. Q: Are we allowed to send an electronic link to the plans to potential subs and suppliers or do they have to go to SAMS and be registered and get their own link?
A: Please do not post on any sites for everyone to see. They can be given to subcontractors for bidding purposes only.
| 4. | Q: In the specs it says that if awarded the job you would have to have background checks for anyone working on site as well as the “real id/passport”. Is this still going to be required for this project even though the project location is not inside the security fence? |
| A: Answer pending |
| 5. | Q: Are you required to have a construction fence? |
| A: No, but you are responsible for your job site and securing any material you may have there. |
| 6. | Q: Is it still 14 days for the background checks to be run? |
| A: Yes, as of right now that has not changed to a longer timeframe due to the current circumstances. |
| 7. | Q: The pre-bid PowerPoint specified a pre-engineered metal building, is that correct? |
| A: No, this is not a pre-engineered metal building. Please follow the specifications and drawings |
| 8. | Q: Is there project management software like ProCore required on this project? |
| A: Not required but if you would like to propose to use something that is up to you. |
| 9. | Q: Normal business days are stated as Tuesday – Friday. Are we allowed to work Mondays on this project? |
| A: Monday will be authorized by exception only. The Contractor may request to work a Monday but it must be approved by the COR or Contracting Officer in advanced of being allowed to work that day. If a request to work Monday is not approved, that day will not be made available. |