This performance work statement outlines requirements for the construction of a new C-130 flight simulator facility at Rosecrans Memorial Airport in St. Joseph, Missouri. The project involves constructing a 10,600 square foot reinforced masonry and steel frame building on a concrete slab with sloped steel roof to house administrative space, training rooms, restrooms, a break area, mechanical and electrical support space, and a simulator bay. Exterior work includes site preparation, utility extensions, pavements, fencing, and site drainage. The performance period is 425 calendar days from notice to proceed. The solicitation was issued by the Department of the Army National Guard for the 139th Airlift Wing Missouri Air National Guard.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
139th AIRLIFT WING
MISSOURI AIR NATIONAL GUARD
705 MEMORIAL DRIVE
ST. JOSEPH, MISSOURI
PERFORMANCE WORK STATEMENT
PROJECT NUMBER ULYB169010
Simulator Facility
FOR
139TH AIRLIFT WING CONTRACTING OFFICE
MISSOURI AIR NATIONAL GUARD
ST. JOSEPH, MISSOURI
PREPARED BY
139 CES/CEE
25 March 2020
ULYB169010 Simulator Facility
Summary of Work:
Contractor shall provide all necessary materials, personnel, equipment, and transportation required to construct a new Full Motion Simulator Facility. This facility is approximately 10,600 SF reinforced masonry and steel frame construction on a concrete slab with a sloped steel roof.
Interior work includes administrative space, training/briefing rooms, restrooms, break area, mechanical/electrical support space, and Simulator bay/maintenance shop/computer room.
Exterior work includes raising the site, utility extensions, pavements, fencing, site and drainage improvements and support. This project has six options: 1. Demountable Partitions. 2. Bridge Crane. 3. Landscaping. 4. Additional Fencing. 5. Additional Road Removal. 6. Additional Gravel Parking. 7. Additional Fill Placement. 8. Additional Fill Placement. 9. Additional Fill placement.
All work shall comply with the Project Design Documents and Specifications.
Contractor is responsible for providing subs with copies to bid from.
All measurements and any information provided for reference shall be field verified by the contractor.
This project shall comply with all codes & standards listed on sheet G-101 of the contract documents as well as the following references;
1. Air National Guard design regulations and standards
2. Drawings and Specifications by Jacobs Engineering, dated 10 March 2020
3. All Federal, State, and Local building code requirements.
General Notes:
1) Project Location: 139th Airlift Wing, Rosecrans Memorial Airport, 705 Memorial Drive
(Airport Rd) in St Joseph, Missouri.
2) Performance Period: 425 calendar days from NTP
3) Hours of Operation: 0630 - 1630 Tuesday through Friday except on Government Holidays.
When a holiday falls on a Monday, the previous Friday is considered a scheduled day off.
4) Occupants: The facility is new construction therefore no occupants will be in the building during construction. The 139th AW reserves the right to occupy the completed areas of the projects prior to Substantial Completion, provided such occupancy does not interfere with completion of the Work. This partial occupancy SHALL NOT constitute acceptance of the total work.
5) Use of Base Utilities: Contractor is responsible for providing and paying for all utilities during construction per specifications.
6) Hazardous Materials: The contractor planning to use hazardous material (HM) for the project shall register with the base Hazardous Material Pharmacy (HMP) prior to start of work in order to support the installation’s compliance with Executive Order 12856, Federal Compliance with Right-to-Know Laws and Pollution Prevention Requirements. All HM required to support the contract shall be reported to the HMP using the Contractor HM Identification Form. The HM Identification Form will be a submittal requirement and must be submitted and approved before work can begin. (See Attachment)
7) Fire Protection: Open flame devices or any welding are not permitted except when a permit has been applied for and received. Permits may be applied for by submitting an AF form 592 to Building 302, Fire House, 24 hours prior to using any open flame devices or welding devices. Contractor shall provide his own fire protection to include fire extinguishers.
8) Digging Permits: Any digging shall require a digging permit. The digging permit shall be obtained through the Base Civil Engineering Office (BCE) or the Project Manager.
9) Contractor’s Equipment & Supplies: Store all Contractor tools, equipment and supplies in a location approved by the government project manager, on or off base property. This project site is not located within the secured perimeter fence. Government shall not be held responsible for missing or damaged contractor owned equipment or materials.
10) Differing Site Conditions: Bring any unforeseen project conditions to the attention of the
Contracting Officer immediately. Differing site conditions, which may alter the scope of work, shall be approved by the Contracting Officer (CO) prior to such work being performed.
11) AT/FP Provisions:
Addressed in Section 01000 of the solicitation.
12) Base Access: For either the site visit or submission of proposals, all personnel requesting access to 139th AW shall possess a valid State or Government picture identification card.
Furthermore, individuals presenting identification cards from a state that is non-compliant with the REAL ID Act will require additional documentation to gain unescorted base access.
Additional documentation include a valid U.S. or foreign government issued passport, an employment authorization document that contains a photograph, or identification cards issued by federal state or local government agencies that include a photo and biographic information. A full list of REAL ID Act compliant and non-complaint states can be found at https://www.dhs.gov/current-status-states-territories. Personnel requesting vehicle access to 139th AW shall provide a valid driver's license, current vehicle registration, and valid vehicle insurance.
13) As-Built Requirements: Per Specifications
14) Material Submittals: The contractor shall submit to the CO for approval all items listed in the specifications booklet within 10 calendar days of the notice to proceed - or - provide notification to the Contracting Officer indicating when each material submittal shall be submitted for approval. All shop drawings, product data, sample submittals and color submissions shall be directed to the Contracting Officer for approval. Submittals shall contain all information needed to maintain, remove/replace, modify, or operate all products, materials, components, etc. provided and/or installed by the contractor. Ensure that any disapproved material submittal will not impact the approved project execution schedule, as disapproved submittal shall not be considered grounds for a time extension. Allow for a minimum of 14 calendar days and maximum of 30 calendar days for the Government’s processing of material submittals. The contractor shall not order, deliver or install any materials without Contracting Officer’s material approval. Remove any materials on site, which have not been properly approved.
15) Damage to Government Property: Any damage caused by the contractor or subcontractor to any government property while the contractor is on base shall be replaced or repaired to the satisfaction of the government by the contractor at no cost to the government.
16) Trash, Refuse & Debris: The contractor shall not use any government disposal bins, dumpsters or trash receptacles for any reason at any time. The contractor shall provide appropriate disposal bins/trash receptacles. Approval of disposal bins/trash receptacles location(s) shall be coordinated through government project manager. The contractor shall not allow debris to leave the work area due to potential damage to aircraft engines.
Contractor shall coordinate with the base. All debris or trash shall be disposed of off base.
All demolition debris shall be disposed of at a permitted landfill, with landfill authorization, unless other arrangements have been coordinated through the Environmental Office (EMO).
Provide proof of landfill disposal from the landfill that accepts the materials. This may be accomplished by providing the government project manager with landfill receipts; waste manifests, or weight tickets from the landfill that accepts the construction debris.
17) Communications Cabling: Any communication cabling and/or pathways and/or equipment shall not be altered without prior written approval of the 139th communications flight.
Contactor must ensure any installed equipment, ductwork, piping, electrical etc., does not obstruct future access to existing communication cabling and pathways. Any cost associated with Communications Flight (CF) approved alterations will be the responsibility of the contractor. Under no circumstances will the contractor void the Governments current inside plant certification and warranty.
18) Contractor Manpower Reporting (CMR): The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for ARMY collection site. The contractor is required to completely fill in all required data fields using the following web address:
http://www.ecmra.mil/. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk at http://www.ecmra.mil/.
Unit Identification Code (UIC) for the requiring activity: FFTPF0 Issuing Office DoDAAC: W50S7G
19) Information Assurance Contractor Training and Certification (JAN 2008)
a) The Contractor shall ensure that personnel accessing information systems have the proper and current information assurance certification to perform information assurance functions in accordance with DoD 8570.01-M, Information Assurance Workforce Improvement Program. The Contractor shall meet the applicable information assurance certification requirements, including—
i) DoD-approved information assurance workforce certifications appropriate for each category and level as listed in the current version of DoD 8570.01-M; and
ii) Appropriate operating system certification for information assurance technical positions as required by DoD 8570.01-M.
b) Upon request by the Government, the Contractor shall provide documentation supporting the information assurance certification status of personnel performing information assurance functions.
c) Contractor personnel who do not have proper and current certifications shall be denied access to DoD information systems for the purpose of performing information assurance functions.
20) Inadvertent Archeological Finds: In case of an inadvertent discovery of a cultural or archaeological resource, the following applicable actions will be taken immediately:
a) Workers will cease all excavation activity, ensure the site is secured, and contact Base
Civil Engineering at 816-236-3318.
b) The Environmental Office (EMO) will ensure that activities have ceased at the discovery site and that the site has been secured from human and natural forces.
c) The Environmental Office will notify any applicable tribal governments and State
Historic Preservation Office (SHPO) of the discovery. SHPO will determine if the State Archaeologist should be contacted.
d) The Environmental Office will notify the Base Judge Advocate General (JAG), Installation Commander, NGB/A7CV and the base Public Affairs Officer (PAO).
e) If the Environmental Manager (EM) has reason to believe that Native American human remains, funerary or sacred objects have been discovered, the EM will provide immediate telephone notification of the discovery, along with written notification by certified mail, to the Department of the Interior’s Departmental Consulting archaeologist (DCA) at the following:
Archaeological Assistance Division National Park Service Washington, D.C.20013-7127 Telephone: 202-343-4101
END SECTION
POLICE RECORD CHECK
Project: __________________________
Government POC: _________________________
DATE OF REQUEST: _____________________
Name:
(First) (Middle) (Last)
Social Security Number:
Drivers License #:_______________________ State of Issue: __________________
Date of Birth: Sex: Race:__________
Company: _____________________________________________
I HEREBY CONSENT TO RELEASE FROM MY FILES THE INFORMATION REQUESTED
BELOW.
Signature:
(TO BE COMPLETED BY POLICE AGENCY)
Request a Criminal History and Nationwide Check be conducted to provide the following information.
1. Has the individual listed above a Police record, to include minor traffic violations? Yes No (If YES, what was the offense or charge, date, disposition and sentence?)
2. Is the individual listed above now undergoing court action of any kind? Yes No (If YES, give details)
THIS IS TO CERTIFY THAT THE ABOVE DATA AS CORRECTED ARE TRUE AND
CORRECT ACCORDING TO THE RECORD ON FILE IN THIS OFFICE. THIS
INFORMATION IS CONFIDENTIAL AND CANNOT BE USED IN ANY OTHER MANNER
EXCEPT FOR OFFICIAL PURPOSES.
DATE:
TITLE:
VERIFIED BY:
(Signature)
Return to: 139 SFS/SFO 705 Memorial Drive St Joseph, MO 64503
This document may contain information or attachments which must be protected IAW AFI 33-332 and DoD Regulation
5400.11. The Privacy Act of 1974 (as amended) applies, and this document and any attachments thereto are For Official Use
Only (FOUO). Information from this document or any attachments thereto must not be introduced into another system of records unless that system of records is described in the Federal Register IAW AFI 37-120.
Attachment 4
Missouri Air National Guard
HEADQUARTERS 139TH AIRLIFT WING
705 MEMORIAL DRIVE, ST. JOSEPH, MISSOURI 64503-9307
TO: Primary Contractor and Subcontractor Employees
FROM: 139th Security Forces Squadron (SFS)
RE: Contractor Responsibilities While at Rosecrans Air National Guard Base
1. BASE ENTRY REQUIREMENTS: All personnel requesting access to 139th AW must abide by the following requirements:
A. Shall possess a valid State or Government picture identification card. Furthermore, individuals presenting identification cards from a state that is non-compliant with the
REAL ID Act will require additional documentation to gain unescorted base access.
Additional documentation includes a valid U.S. or foreign government issued passport, an employment authorization document that contains a photograph, or identification cards issued by federal state or local government agencies that include a photo and biographic information. A full list of REAL ID Act compliant and non-complaint states can be found at https://www.dhs.gov/current-status-states-territories.
B. Personnel requesting vehicle access to 139th AW shall provide a valid driver's license, current vehicle registration, and valid vehicle insurance.
C. All vehicles entering the installation are subject to search daily and individual vehicles may be searched at random.
2. ESCORTING: Only individuals that possess a Common Access Card (CAC) are allowed to escort personnel on the installation.
3. CRIMINAL BACKGROUND CHECK: All contractors working on the installation are required to have a favorable police background check completed prior to working on the installation. The 139th Civil Engineering Squadron (CES) will provide a Police Background
Form which needs to be completed and provided to Security Forces two (2) weeks prior to being considered for unescorted access. Provide this information for all primary and subcontractor employees. For resident aliens, please include a photocopy of the resident alien identification card. Failure to complete the background check will result in the necessity for escorts.
The 139th SFS will conduct both local and nation-wide criminal background checks using the Back Ground Check Consent Form provided by CES project managers. Both open-source websites as well as information provided by local agencies will be reviewed.
Individuals may be denied access and access credentials based on information obtained during identity vetting that indicates the individual may present a threat to the good order, discipline and morale of the installation, including, but not limited to the following:
(a) The individual is known to be or reasonably suspected of being a terrorist or belongs to an organization with known terrorism links/support.
(b) The installation is unable to verify the individual's claimed identity.
(c) The individual has previously been barred from access to a federal installation or stand-alone facility.
(d) The individual is wanted by Federal, State, Local, or other civil law enforcement authorities, regardless of offense or violation.
(e) The individual has any conviction for espionage, sabotage, treason, terrorism, or murder.
(f) The individual’s name appears on any Federal or State agency’s watch list or hit list for criminal behavior or terrorist activity.
(g) The individual has been convicted of a firearms or explosive violation.
(h) The individual has been convicted of sexual assault, armed robbery, rape, child molestation, child pornography, trafficking in humans, drug possession with intent to sell, or drug distribution.
(i) The individual has knowingly and willfully engaged in acts or activities designed to overthrow the U.S. Government by force.
4. CONTRACTOR SECURITY REQUIREMENTS: You and your employees will stay in your immediate work area. Contractors are not allowed to go “sight-seeing” around the installation.
Photography or videotaping by contractor employees is not permitted, unless prior arrangements have been made through the 139th Security Forces Squadron and the Public Affairs Office and/or
Airfield Management as applicable, and the photography and/or videotaping is associated with the work being done on the installation.
The government assumes NO responsibility for lost or stolen material, equipment, or tools. The security of these items lies solely with the contractor. Any theft or damage of tools and/or equipment must be immediately reported to Security Forces and the contracting officer’s representative.
Contractors who witness any accident, suspicious activity or security incident are required to immediately report the event to Security Forces at the numbers provided below or make contact with any Security Forces personnel.
5. PROHIBITED ITEMS: Except as necessary to accomplish your contract/project, you and your employees shall not bring or possess any of the following items while on the Rosecrans
MAP (ANG) Base:
Weapons. In the interest of public safety the items listed below are considered dangerous weapons.
Weapons include, but are not limited to, firearms, tazers, pepper spray, paint ball guns, pellet guns, BB guns, blowguns, bows and arrows, underwater spear guns, hunting slingshots, and throwing spears.
Knives in excess of 3 inches, spring-loaded knives (switchblades), swords, blackjacks, metal knuckles, "Nunchucks" fighting sticks, throwing stars, boomerangs, chains
(wrapped), and billy clubs. Possession of these items is expressly prohibited at all times, except when they are in use as part of the bearer's lawful "tools of the trade," such as craftsmen (electricians, carpenters, or other such trades.).
Explosive Material: Consists of ammunition, gunpowder, firecrackers, and similar items.
Narcotics or drugs in any quantity except for those prescription drugs issued by a licensed pharmacist based on written prescription from a licensed medical doctor for health care purposes.
Drug paraphernalia and any contents contained therein.
Alcohol, which includes but is not limited to beer in open containers no matter what the quantity, is strictly prohibited from being consumed on the base and/or job site.
Remember, all individuals and vehicles are subject to search at any time.
6. ANTITERRORISM/FORCE PROTECTION. Contractor employees may be asked to leave the base at any time depending on Force Protection Condition level changes, security incidents, and potential threats. This will be done in a timely manner. Contact the 139 AW Antiterrorism
Office at (816) 236-3585 for additional information. Antiterrorism Level I, Situation Awareness
Training is available and may be provided to contractors as required by contract.
7. TRAFFIC/SAFETY REGULATIONS.
Missouri State Motor Vehicle Law applies to all drivers and is enforced on the Rosecrans
MAP (ANG) Base.
The speed limit on the Missouri Air National Guard Base streets is twenty (20) miles per hour unless otherwise posted.
Posted traffic signs (speed limit, stop signs, etc.) on the base will be obeyed by you and your employees.
You and your employees are responsible for maintaining current registration requirements. This means your state vehicle registration, driver’s license, vehicle insurance, etc., must be up to date at all times.
All vehicle occupants (exceptions - special purpose vehicles) will wear seat belts.
Installation safety regulations prohibit riding in the bed of pickups.
Contractors must pay special attention to Foreign Object or Debris (FOD). All streets or roadways must be kept clean so base or contractor vehicles do not track FOD onto the flight line. Contractors are required to complete FOD inspections prior to entering the aircraft parking ramp on the installation.
Contractors are prohibited from using cellular telephones while they operate vehicles on the installation in accordance with Department of Defense guidance. Cellular phones cannot be used on the flight line area. Contractors may use their cellular phones when a vehicle is stopped. Contractors found to be operating vehicles while talking on cellular telephones will be stopped by 139th Security Forces personnel or other installation personnel and briefed accordingly.
All Individuals must have a picture ID (driver’s license or state ID) and visitors pass
(if issued) with them at all times.
8. MEDICAL EMERGENCIES. If an employee is injured or has a medical emergency on base call 911 from an on-base phone, or from a commercial phone call the Base Defense
Operation Center (BDOC) at (816) 236-3394. Contractors may also make contact with any
Security Forces patrols (vehicles/foot) or any base personnel to notify of an emergency. Calling
911 from a commercial phone may cause delays in getting medical response on base.
9. SEVERE WEATHER. Severe weather watches/warnings and safety instructions are announced over the installation public address system. Contractors are required to listen to these announcements and to follow the directions made over the public address system, made by the contracting officer’s representative, or by Security Forces members.
If you have questions/concerns please call MSgt Matt Martindell at (816)236-3131 or CMSgt
Mark Richie at (816)236-3480.
| Project: |
| Government POC: |
| DATE OF REQUEST: |
| Name: |
| Middle: |
| Last: |
| Social Security Number: |
| Drivers License: |
| State of Issue: |
| Date of Birth: |
| Sex: |
| Race: |
| Company: |
| 1 Has the individual listed above a Police record to include minor traffic violations Yes: Off |
| No: Off |
| 2 Is the individual listed above now undergoing court action of any kind Yes: Off |
| No_2: Off |
| DATE: |
| TITLE: |
| VERIFIED BY: |
File details come from the government source that posted it. Updated .