Attachment 02 - Tower ring down floor plan - Amendment 01.pdf
PDF 195 KB Posted
- Attached to
- Tower Ring Down System Upgrade
- Solicitation number
- W50S77-25-Q-0002
About this file
This document is a floor plan for Building 1190, dated 15 July 2025, showing a detailed layout of a facility with multiple functional areas. The floor plan includes Vehicle Stalls, Dayroom, Kitchen, Training Room, Office Area, Gym, Bunkrooms, Comm Room, Dispatch area, Dry Chemical Storage, and Air Compressor room. The blueprint provides precise dimensional measurements, with an overall building footprint of 130'-8" by 216'-0", and includes multiple proposed speaker locations marked with red dots throughout the interior spaces. The floor plan is oriented with a north arrow and includes detailed room configurations and spatial relationships, suggesting this is likely a fire station or emergency services facility floor plan related to the Tower Ring Down System Upgrade solicitation for the 147th Attack Wing, Texas Air National Guard.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
O H
O H
E
G
O H
O H
O H
O H
O H
O H
O H
O H
O H
O H
Dry ChemicalStorageAir Compressor
F A
P
15 July 2025
Bldg 1190
Comm Room
D isp at ch w / P rim ar y C ra sh
N et
Dayroom Kitchen
Gym
Office Area
Training Room
Bunkrooms
Vehicle Stalls
130'-8"
6'- 0'
8'- 0"
Proposed speaker location
80'-0"
1270409225C Line
1270409225C Line
1270409225C Line
1270409225C Line
1270409225C Line
1270409225C Line
1270409225C Line
1270409225C Line
1270409225C Line
1270409225C Line
1270409225C Line
1270409225C Line
1270409225C Line
File details come from the government source that posted it. Updated .