Attachment 02 - Tower ring down floor plan - Amendment 01.pdf

PDF 195 KB Posted

Attached to
Tower Ring Down System Upgrade
Solicitation number
W50S77-25-Q-0002
Issued by

About this file

This document is a floor plan for Building 1190, dated 15 July 2025, showing a detailed layout of a facility with multiple functional areas. The floor plan includes Vehicle Stalls, Dayroom, Kitchen, Training Room, Office Area, Gym, Bunkrooms, Comm Room, Dispatch area, Dry Chemical Storage, and Air Compressor room. The blueprint provides precise dimensional measurements, with an overall building footprint of 130'-8" by 216'-0", and includes multiple proposed speaker locations marked with red dots throughout the interior spaces. The floor plan is oriented with a north arrow and includes detailed room configurations and spatial relationships, suggesting this is likely a fire station or emergency services facility floor plan related to the Tower Ring Down System Upgrade solicitation for the 147th Attack Wing, Texas Air National Guard.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

O H

O H

E

G

O H

O H

O H

O H

O H

O H

O H

O H

O H

O H

Dry ChemicalStorageAir Compressor

F A

P

15 July 2025

Bldg 1190

Comm Room

D isp at ch w / P rim ar y C ra sh

N et

Dayroom Kitchen

Gym

Office Area

Training Room

Bunkrooms

Vehicle Stalls

130'-8"

6'- 0'

8'- 0"

Proposed speaker location

80'-0"

1270409225C Line

1270409225C Line

1270409225C Line

1270409225C Line

1270409225C Line

1270409225C Line

1270409225C Line

1270409225C Line

1270409225C Line

1270409225C Line

1270409225C Line

1270409225C Line

1270409225C Line

File details come from the government source that posted it. Updated .