GC004 ACCESS AND LAYDOWN PLAN (R1).pdf
PDF 452 KB Posted
- Attached to
- ADC HANGAR Federal contract opportunity
- Solicitation number
- W50S7020B0001
About this file
This document provides an access and laydown plan for a construction project along with details of a related federal contract solicitation. The access and laydown plan outlines the construction site boundaries, haul routes, staging areas, traffic control measures and notes regarding security, equipment parking and materials storage. The federal contract solicitation is for construction of an Air National Guard hangar at Robins Air Force Base in Georgia. Interested parties are encouraged to attend a pre-bid conference on July 7th for registration details. The solicitation includes exhibits, drawings and specifications for the hangar construction project and is issued by the Department of the Army Georgia Army National Guard under solicitation number W50S7020B0001.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ES102 - ELECTRICAL SITE PLAN - 2 (R1).pdf | ||
| B101 BORING LOGS (R1).pdf | ||
| W50S70-20-B-0001-0003.pdf | ||
| CD102 CIVIL UTILITY DEMOLITION PLAN (R1).pdf | ||
| CS451 CODE COMPLIANCE SITE PLAN (R1).pdf | ||
| W50S70-20-B-0001-0002.pdf | ||
| GC501 Access and Phasing Details-1 (R1).pdf | ||
| GC005 Enlarged Access and Phasing Plan (R1).pdf | ||
| 01 45 35 Schedule of Special Inspections.pdf | ||
| W50S70-20-B-0001-0001.pdf | ||
| Vendor Sign in Sheet Site Visit 7-7-20.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
I D
E
W
A
L K
S
I
D
E
W
A
L
K
HQ
ROAD
SIGN
STOP
SIGN
C
H
A
I
N
L
I
N
K
F
E
N
C
E
C
H
A
I
N
L
I
N
C
E
A
S
P
H
A
V
E
M
E
N
T
C H
A I N
L I N
K
F
E N
C E
G
A
T
E
G
A
T
E
ASPH PAVEMENT
A
S
V
E
M
E
N
T
C
H
A
I
N
L
I
N
C
E
A
S
P
D
R
I
V
E
C
H
A
I
N
L
I
N
C
E
C
H
A
I
N
L
I
N
C
E
C H
A I N
L I N
K
F
E N
C E
CHAINLINK FENCE
C
H
A
I
N
L
I
N
C
E
GATE
CHAINLINK FENCE
CHAINLINK FENCE
BRUSHWOOD AVENUE
A
R
M
S
T
E
V
E
N
U
E
STOP
S
H
E
D
S T
O P
S T
O P
ECP BLOCK
ECP
BLOCK
S
T
O
P
G8
G7
G6G5 G4G3
G2G1
GZONE
FZONE
S
I D
E
W
A
L
K
T
E
T
B
U
I
L
D
I
N
G
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXXX
X
XXXX
X X
X
X
X
X
X
X
XX
X X
X
LO
S
LO
S
LO
S
LO
S
LO
S
LOS
LOS
LOS
LOS
LOS
LOS
LOS LOS LOS LOS LOS LOS LOS LOS LOS
LOS
LOS
LOS
L O S
LO
S
LOS
L O S
LO
S
L O S
LOSLOSLOSLOSLOSLOS
LOS
LOSLOS
L O S
L O S
LO
S
LOS
LO
S
LOS
LOS
LOS
LOS
LOS
P
R
O
P
O
S
N
G
A
R
F
F
P
R
O
P
O
S
N
G
A
R
F
F
PROPOSED HANGAR
BAY
FFE: VARIES
CONTRACTOR HAUL ROUTE
A
R
M
S
T
E
E
O
E
L
S
C
H
I
G
R
A R
M S
T E
E
BRUSHWOOD AVE.
R O
B I N
S
D
R
BOB HARMON RD.
BLDG 198
BLDG 195
B L D
G
BLDG 223
BLDG 222
BLDG 221
BLDG 220
BLDG 230
BLDG 228
BLDG 227
BLDG 262
BLDG 264
BLDG 207
EXISTING GATE AT CONTROLLED PERIMETER
ACCESS ROAD
SEE DETAIL 1/CE501
B
L
B
L
B
L
CONTRACTOR STAGING AREA
RESTRICTED AREA MARKING
LOC
LOC
L
O
C
L
O
C
L
O
C
LOC
LOC
LOC
L O
C
L O
C
L
O
C
L O
C
L O
C L O
C
L O
C
L O
C
L
O
C
L
O
C
LOC
LOC
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C
L
O
C L
O
C
L
O
C
L
O
C
L
O
C
L O
C
L O
C
LOC
LOC
LOC
CONSTRUCTION ENTRANCE
BLDG 272
NO CONTRACTOR VEHICLE PARKING OR MATERIALS
STORAGE OF ANY KIND SHALL BE ALLOWED WITHIN
200' OF BLDGS 195, 198, 220, AND 272
R
CONTRACTOR HAUL ROUTE
CONTRACTOR STAGING
AND OFFLOAD AREA
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X X X
X X
X
X
X
X
X
X X
X X
X X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
NO CONTRACTOR VEHICLE PARKING OR MATERIALS
STORAGE OF ANY KIND SHALL BE ALLOWED WITHIN
200' OF BLDGS 195, 198, 220, AND 272
EXISTING
SLIDE GATE
EXISTING
FLIGHTLINE
FENCE
TEMPORARY
INSTALLATION
PERIMETER
TEMPORARY
INSTALLATION
PERIMETER
TEMPORARY
INSTALLATION
PERIMETER
DOUBLE SWING GATE
REMOVE EXISTING SECTION OF FENCE AS
REQUIRED TO ACCESS PROPOSED GATE
DEMOLISH AND REMOVE
EXISTING FENCE
ROBINS DR.
L
P
O
W E
N
D
R I V
E
103591_GC004.DWG
5 6
D
C
A
B
1 2 3 4
E
D
C
A
B
E
5 61 2 3 4 ofsheet sheets date detailed checkeddesigned project contract rev.drawing file
C O
P Y
R I G
T
B
U R
S
M c D
O N
N E
L L
E
N G
I N
E E
R I N
G
C
O M
P A
N Y
I N
C
C
DATEREV.
REVISIONS
DESCRIPTION INIT
GEORGIA AIR NATIONAL GUARD
SAVANNAH/ HILTON HEAD IAP
SAVANNAH, GEORGIA
KANSAS CITY, MISSOURI
ENGINEERS ARCHITECTS & CONSULTANTS
103591
Project No. - XDQU109057
W9133L-15-D-0003-C004
165 AW, ADC
NEW CONSOLIDATED MX
HANGAR AND SHOPS
NOT FOR
CONSTRUCTION
ACCESS AND LAYDOWN PLAN
GC004 C
10/15/18
J. SHEPHERD L. MONZON
M. MILLER
A 10/15/18 B1 SUBMITTAL JTS
B 1/22/19 B2 SUBMITTAL JTS
C 5/1/19 B3 SUBMITTAL JTS
SCALE 1" = 60'
ACCESS AND LAYDOWN PLAN
A1
ACCESS AND STAGING NOTES:
1. SEE SHEET GC002 FOR LEGEND & ABBREVIATIONS.
2. SEE SHEET GC003 FOR GENERAL NOTES.
3. CONTRACTOR ACCESS SHALL BE THROUGH THE EXISTING GATE ON L. P. OWEN DRIVE AND THEN
THROUGH A TEMPORARY CONSTRUCTION GATE AS SHOWN ON THIS DRAWING.
4. CONTRACTOR SHALL COORDINATE ACTIVITIES AND MAINTAIN ALL ACCESS AND HAUL ROUTES IN A
MANNER THAT ALLOWS UNOBSTRUCTED EMERGENCY ACCESS TO ALL PROJECT AREAS, AIRFIELD
AREAS, AND EXISTING ROADWAYS AT ALL TIMES WITHOUT DELAY TO EMERGENCY AND SECURITY
VEHICLE RESPONSE TIME.
5. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO CONSTRUCTION ACTIVITIES, CONTRACTOR
SHALL NOTIFY THE COR REPRESENTATIVE, POLICE, LOCAL FIRE AUTHORITY, AND ALL OTHER
EMERGENCY SERVICES OF THE CLOSURE.
6. CONTRACTOR SHALL MAINTAIN ACCESS AND HAUL ROUTES TO BE FREE FROM FOREIGN OBJECTS AND
DEBRIS (FOD) CAUSED FROM CONSTRUCTION ACTIVITIES ON A DAILY BASIS.
7. CONTRACTOR SHALL RESTRICT ALL OPERATIONS TO AREAS WITHIN THE CONSTRUCTION LIMITS
UNLESS COORDINATED OTHERWISE WITH THE COR.
8. CONTRACTOR IS RESPONSIBLE FOR ESTABLISHING A STAGING AND STOCKPILE AREA FOR MATERIALS
AND EQUIPMENT. LOCATION OF CONTRACTOR'S STAGING SHALL BE AS ILLUSTRATED ON THIS
DRAWING. CONTRACTOR'S STAGING AREA IS SUBJECT TO CHANGE AT THE DIRECTION OF THE COR
REPRESENTATIVE AND MAY CHANGE BASED ON OPERATIONAL REQUIREMENTS OF THE PROJECT SITE.
9. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, CONTRACTOR'S EQUIPMENT AND VEHICLES
SHALL BE PARKED IN THE STAGING AREA.
10. CONTRACTOR SHALL PROVIDE AND INSTALL AT THE CONSTRUCTION ENTRANCE A PROFESSIONALLY
PAINTED SIGN, MEETING COR REPRESENTATIVE APPROVAL, TO DIRECT MATERIAL
SUPPLIERS, EMPLOYEES, AND DELIVERIES TO THE CONSTRUCTION SITE. THE SIGN SHALL
READ “CONSTRUCTION VEHICLES ONLY - NO VENDORS ALLOWED.”
11. CONTRACTOR SHALL PROVIDE A MINIMUM NOTICE OF 48 HOURS TO THE COR REPRESENTATIVE
REGARDING CONSTRUCTION DELIVERIES PRIOR TO THOSE DELIVERIES.
12. SECURITY FENCING AND GATES ASSOCIATED WITH CONTRACTOR'S WORK AREA SHALL MEET OR
EXCEED THE EXISTING FENCE STRENGTH, SIZE, AND DIMENSIONS. SECURITY GATE SHALL BE LOCKED
DURING NON-WORKING HOURS. AT PROJECT COMPLETION, CONTRACTOR SHALL REMOVE SECURITY
GATE AND RESTORE SECURITY FENCE TO ITS ORIGINAL CONDITION.
13. ALL CONTRACTOR VEHICLES AND PERSONNEL ARE SUBJECT TO SEARCH BY SECURITY WHEN
ENTERING THE AIRFIELD AND MAY EXPERIENCE DELAYS. ALL PERSONNEL MUST HAVE A CURRENT AND
VALID PHOTO IDENTIFICATION PER AIRFIELD SECURITY REQUIREMENTS, AND ALL VEHICLES MUST HAVE
CURRENT AND VALID REGISTRATION AND INSURANCE.
14. ALL CONTRACTOR VEHICLES AND PERSONNEL SHALL BE RESPONSIBLE FOR COORDINATING WITH THE
AIRFIELD SECURITY OFFICE IN OBTAINING PROPER SECURITY CLEARANCE AND BADGING PRIOR TO
ENTERING SECURE AREAS.
15. CONTRACTOR TO RESTORE SITE PORTIONS (TO REMAIN) TO THEIR ORIGINAL PRE CONSTRUCTION
CONDITION AND EPOXY FILL ANY EXPANSION BOLT HOLES LEFT IN AIRFIELD PAVEMENT.
16. CONTRACTOR MAY NOT OPEN UP OR DISTURB THE EXISTING GOVERNMENT EXTERIOR FENCELINE (
FOR NEW CONSTRUCTION ENTRY AND EXIT GATES) UNTIL AFTER THE GOVERNMENTS INSTALLATION
SECURITY FORCES HAVE INSPECTED AND APPROVED THE NEW INTERNAL FENCE INSTALLATION TO
SECURE THE INSTALLATION FROM UNAUTHORIZED INTRUSION.
17. CONTRACTOR MUST PLACE SIGNAGE ON INSIDE OF FENCELINE AND KEEP ALL MATERIALS STORAGE, ANY VEHICLE PARKING, AND ALL COMMERCIAL VEHICLE LOADING/UNLOADING AT LEAST 200' CLEAR OF
THE FENCELINE DUE TO GOVERNMENT OCCUPANCY OF BLDGS 195, 198, 220, AND 272.
18. CRITICAL - NOTE “CRITICAL - AT NO TIME WILL CONSTRUCTION VEHICLES STOP OR STAGE ON
AIRPORT ROADS. ALL CONSTRUCTION VEHICLES SHALL ENTER THE CONSTRUCTION SITE ON
GOVERNMENT PROPERTY AND STAGE/OFFLOAD THEREIN. CONTRACTOR SHALL PLAN IN ADVANCE
FOR STAGING OF MULTIPLE TRACTOR TRAILER VEHICLES TO MITIGATE ANY OCCURRENCE OF
STAGING ON AIRPORT ROADS. WHERE CONTRACTOR COULD HAVE REASONABLY PREVENTED ITS
OCCURRENCE, THE CONTRACTOR WILL BE GIVEN NOT MORE THAN TWO WARNINGS FOR VIOLATION OF THIS STAGING POLICY. WITH THE THIRD INSTANCE OF STAGING VIOLATION THE SAVANNAH
AIRPORT COMMISSION RETAINS THE RIGHT TO PROHIBIT FURTHER CONSTRUCTION TRAFFIC ON
AIRPORT ROADS AND THE CONTRACTOR WILL IMMEDIATELY LOOSE ACCESS AND WILL BE DIRECTED
BY THE CONTRACTING OFFICER TO ENTER THE GOVERNMENT PROPERTY THROUGH ITS DAVIDSON
GATE MAIN ENTRY CONTROL POINT.
19. FROM THE TIME LOADS LEAVING THE GOVERNMENT PROPERTY AND ENTER ONTO AIRPORT ROADWAYS
THOSE LOADS WILL MEET ALL THE REQUIREMENTS OF GA DOT STANDARDS FOR COVERING OF LOADS
AND CONTAINING DEBRIS AND MATERIALS ENTIRELY WITHIN THE HAUL VEHICLE.
20. CONTRACTOR SHALL PROVIDE DIRECTIONAL SIGNAGE ALONG THE LENGTH OF DAVIDSON DRIVE
DIRECTING ALL OF ITS CONSTRUCTION TRAFFIC TO THE SITE ENTRY GATE SO AS NOT TO DISRUPT
NEIGHBORING GULFSTREAM AND/OR AIRPORT OPERATIONS.
21. CONTRACTOR SHALL HAVE A KICKBROOM AND/OR VACUUM SWEEPER ONSITE AT ALL TIMES FOR THE
PURPOSE OF KEEPING AIRPORT ROADS CLEAN AND SWEPT. THAT KICKBROOM WILL BE KEPT
SERVICEABLE AND FUELED AT ALL TIMES AND WILL STAND READY TO SWEEP HAUL ROUTES UNTIL
DEBRIS IS REMOVED OR UNTIL THEY HAVE REACHED HWY 307/DEAN FOREST, WHICHEVER IS
FURTHEST, AT ANY TIME DIRT CLODS/ROCK HAVE ACCUMULATED BEING CLEARLY VISIBLE AS
EVIDENCE OF BEING TRACKED OFF THE CONSTRUCTION SITE BY CONTRACTOR VEHICLES. IF EITHER
SAVANNAH AIRPORT OPERATIONS STAFF OR THE CONTRACTING OFFICER REPRESENTATIVE INFORMS
OF AN ISSUE IT NEEDS DEALT WITH AS SOON AS PRACTICAL.
TRAFFIC CONTROL:
1. PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CORDON OFF THE CONSTRUCTION WORK AREA AND
ASSOCIATED ROADWAYS AND AIRFIELD AREAS BY USING BARRICADES APPROVED BY THE COR.
2. ALL CONSTRUCTION EQUIPMENT AND VEHICLES SHALL BE MARKED WITH COMPANY DESIGNS,
INSIGNIAS, OR OTHER MARKINGS, WHICH ARE CLEARLY VISIBLE.
3. CONSTRUCTION EQUIPMENT SHALL HAVE AUTOMATIC SIGNALING DEVICES TO SOUND AN ALARM WHEN
MOVING IN REVERSE.
4. ONLY RUBBER-TIRE VEHICLES WILL BE ALLOWED ON EXISTING PAVEMENT-TO-REMAIN.
5. NO PEDESTRIAN TRAFFIC SHALL BE ALLOWED INSIDE THE CONSTRUCTION LIMITS.
6. PRIOR TO THE REMOVAL OF BARRICADES AND TRAFFIC CONTROL DEVICES, THE CONTRACTOR SHALL
REQUEST THE COR TO SCHEDULE AN INSPECTION. NO ROADWAY OR PORTION OF THE AIRFIELD SHALL
BE RE-OPENED UNTIL THE COR HAS COMPLETED INSPECTION AND APPROVED THE RE-OPENING OF
ACTIVE AREAS.
7. CONTRACTOR SHALL ATTEND ANY SPONSOR-MANDATED VEHICLE OPERATOR OR FOREIGN OBJECT
DEBRIS/DAMAGE (FOD) CONTROL TRAINING COURSE.
8. ANY DAMAGE TO ROADS AND PAVEMENTS-TO-REMAIN DUE TO
CONSTRUCTION EQUIPMENT OR TRAFFIC SHALL BE REPAIRED TO
RESTORE THE ROADS AND PAVEMENTS TO THEIR ORIGINAL
CONDITION TO THE SATISFACTION OF THE COR.
9. ACCESS TO BUILDINGS 113, 114,173, 197, AND 198 SHALL BE
MAINTAINED AT ALL TIMES DURING CONSTRUCTION.
GC501
D5
GC501
D3
GC501
D3
GC501
D3
CE501
D1
| Sheets and Views |
| GC004 ACCESS AND LAYDOWN PLAN |
File details come from the government source that posted it. Updated .