HVAC QA.docx
DOCX document 17 KB Posted
- Attached to
- 116 ACW UHHZ192019 B2051 REPAIR/CLEAN HVAC DUCTS
- Solicitation number
- W50S6Z21R0009
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 21R0009 Solicitation.pdf | ||
| HVAC QA RFI RESPONSES.docx | DOCX document | |
| 2051 HVAC Mechanical Dwgs.pdf | ||
| B2051 AHU Schedules.pdf | ||
| HVAC QA.docx | DOCX document | |
| 2051 HVAC.pdf | ||
| SOW_UHHZ192019_V3.docx | DOCX document | |
| WD GA20210140.pdf | ||
| 21R0009 Solicitation.pdf | ||
| B2051 Duct Cleaning SOW_UHHZ192019_V2.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE VISIT INFORMATION
An additional site visit will be held on Thursday, 22 July 2021 at 0900 AM EST. Attendees shall email SSgt Austin Carter (austin.carter.21@us.af.mil) and MSgt Justin Baskerville (justin.baskerville@us.af.mil) in advance to coordinate base access. Attendees will meet at the Robins AFB Visitors Center (located on Houston Lake BLVD and HWY 247) NLT 0845 AM EST. Please arrive with your Driver’s License, Vehicle Insurance/Registration, and Social Security Card.
This will be the final opportunity to view the facilities prior to the bid submission deadlines.
INITIAL SITE VISIT ATTENDEES – 14 JULY 2021 AT 1000 AM EST
SSGT AUSTIN CARTER – CONTRACTING
SMSGT GLEN PORTER – CONTRACTING
CAPT JONATHON MCKNIGHT – CIVIL ENGINEERING
MSGT JUSTIN BASKERVILLE – CIVIL ENGINEERING
REID BLACKWELL – CIVIL ENGINEERING
QUINTEN JONES – CIVIL ENGINEERING
DAN H. – T&D MECHANICAL
JOHN G. – SERVPRO
DONALD K. – AIR QUALITY SYSTEM
CARY A. – MEDICLEAN
SECONDARY SITE VISIT – 22 JULY 2021 AT 0900 AM EST
SSGT AUSTIN CARTER – CONTRACTING
MSGT JUSTIN BASKERVILLE – CIVIL ENGINEERING
REID BLACKWELL – CIVIL ENGINEERING
QUINTEN JONES – CIVIL ENGINEERING
DAN H. – T&D MECHANICAL
DAVID G. – HUGHES ENVIRONMENTAL
QUESTIONS AND ANSWERS
1. Is Sterile Aire acceptable as an equivalent alternative UVGI product?
A: The Contractor shall submit justification for product(s) selection and placement throughout HVAC distribution system and show how the above considerations are met/addressed to provide maximum value to the government as part of a proposal.
1. Can Purafil be added as an option to add to reduce gases and not be included in the base bid since there is the concern of it being cost prohibitive?
A: Goal 2: Air purification to reduce gases, odors and VOCs; this is desirable up to the point it becomes cost prohibitive, i.e. greater than 2-3 times cost of coil-only products.
1. Can a schedule of air handlers be provide to list CFM of all the air hander units?
A: Mechanical Drawings and Air Handler CFM attached SAM.GOV.
1. Can dimensions of the coils on all the Air handler Units be provided?
A: Mechanical Drawings attached within SAM.GOV.
1. Each Solicitation states that there will be liquidated damages if the project goes past the period of performance, but it does not state any amount. What amount of liquidated damages per day?
A: LD’s will not be utilized for the subject solicitations.
1. The Solicitation posted to sam.gov for Bldg 2051 is a Draft copy. Can you provide us with a non-draft copy?
A: Error during upload. Watermark has been removed.
1. The drawings for Buildings 2039 & 2051 are not to the same scale as the drawings for Building 2045. B2045 has the correct 36" x 24" scale that is typical of drawings. B2039 appears to be 11" x 17" and B2051 appears to be 8.5" x 11". Can you provide a copy of B2039 and B2051 drawings that are 36" x 24"?
A: Drawings for B2039 & B2051 have been reprinted and are attached within SAM.GOV.
1. Because these projects do not require a bid bond, can we bid these electronically through email? Or must they be delivered to Robins AFB in sealed envelopes?
1. Bids can be submitted via paper or electronic means.
1. Does toilet exhaust cleaning need to be included if it is separate from the rest of the HVAC system?
A: No.
1. Some slot diffusers are not in drop-down ceilings like the others. Do you want us to cut the ceiling and/or install an access door to access these slot diffusers for cleaning? Or do you want the best effort to clean from the nearest access point in another ceiling? Do you want the "cassette" part of the slot diffusers replaced?
A: Install an access door. Do not replace the cassette part of the slot diffusers.
1. Will all rooms be accessible when duct cleaning is scheduled to be performed? Will there be anyone to open locked doors to reach areas that need to be cleaned? Or do we need to include prices for more trips to account for inaccessible/locked areas?
A: Entry Authorization Lists will be required ahead of time to facilitate entry into secure areas. Facility managers and/or government construction managers will unlock doors to the areas that need to be cleaned.
1. If one contractor receives multiple duct cleaning awards, will a separate Superintendent be required for each building? Or can one Superintendent oversee all 3 buildings?
A: One Superintendent can oversee multiple buildings.
1. In building 2039 there is what looks like a standalone system in the main mechanical room that is labeled SA-1 on the bottom of the unit that is hanging in the air and HP1 on the big VFD controlling it. It appears this system is no longer in service. Do we need to clean any of this system since it appears disconnected and no longer in service?
A: No, you do not need to clean any of the system that is not in service.
1. In building 2039 Liebert unit room there is a visible duct door above the unit in the middle of the room. Are those the type duct doors you are wanting installed? Or is there another type of duct door that you would prefer?
A: Duct doors installed should be consistent with Industry Standards. Main concern is tight seal to mitigate possibly of air loss from the system.
1. There are some areas that appear to feed office/cubicle areas that people are working in. Will they be occupied during the time of work? If so, should these areas be worked on after hours/weekends to prevent disturbing the individuals working in those areas?
A: Goal is to prevent operations disruptions.
1. What is the estimated number of occupants for each building at peak capacity/occupancy?
A: Checking on this will provide estimates on Monday.
1. Do the systems have UV-C coils sanitation?
A: No they do not. Current system in B2045 is strictly Airstream Disinfection.
1. Is UV coil sanitation desired?
A: No.
** ADDITIONAL QUESTIONS MAY BE SUBMITTED VIA EMAIL AS AN RFI. ANSWERS WILL BE PROVIDED AS QUICKLY AS POSSIBLE. **