HVAC QA.docx

DOCX document 15 KB Posted

Attached to
116 ACW UHHZ192019 B2051 REPAIR/CLEAN HVAC DUCTS
Solicitation number
W50S6Z21R0009
Issued by

View the file

Other files

File Type Posted
21R0009 Solicitation.pdf PDF
HVAC QA RFI RESPONSES.docx DOCX document
2051 HVAC Mechanical Dwgs.pdf PDF
HVAC QA.docx DOCX document
B2051 AHU Schedules.pdf PDF
2051 HVAC.pdf PDF
SOW_UHHZ192019_V3.docx DOCX document
WD GA20210140.pdf PDF
21R0009 Solicitation.pdf PDF
B2051 Duct Cleaning SOW_UHHZ192019_V2.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SITE VISIT INFORMATION

An additional site visit will be held on Thursday, 22 July 2021 at 0900 AM EST. Attendees shall email SSgt Austin Carter (austin.carter.21@us.af.mil) and MSgt Justin Baskerville (justin.baskerville@us.af.mil) in advance to coordinate base access. Attendees will meet at the Robins AFB Visitors Center (located on Houston Lake BLVD and HWY 247) NLT 0845 AM EST. Please arrive with your Driver’s License, Vehicle Insurance/Registration, and Social Security Card.

This will be the final opportunity to view the facilities prior to the bid submission deadlines.

INITIAL SITE VISIT ATTENDEES – 14 JULY 2021 AT 1000 AM EST

SSGT AUSTIN CARTER – CONTRACTING

SMSGT GLEN PORTER – CONTRACTING

CAPT JONATHON MCKNIGHT – CIVIL ENGINEERING

MSGT JUSTIN BASKERVILLE – CIVIL ENGINEERING

REID BLACKWELL – CIVIL ENGINEERING

QUINTEN JONES – CIVIL ENGINEERING

DAN H. – T&D MECHANICAL

JOHN G. – SERVPRO

DONALD K. – AIR QUALITY SYSTEM

CARY A. – MEDICLEAN

QUESTIONS AND ANSWERS

1. Is Sterile Aire acceptable as an equivalent alternative UVGI product?

A: The Contractor shall submit justification for product(s) selection and placement throughout HVAC distribution system and show how the above considerations are met/addressed to provide maximum value to the government as part of a proposal.

1. Can Purafil be added as an option to add to reduce gases and not be included in the base bid since there is the concern of it being cost prohibitive?

A: Goal 2: Air purification to reduce gases, odors and VOCs; this is desirable up to the point it becomes cost prohibitive, i.e. greater than 2-3 times cost of coil-only products.

1. Can a schedule of air handlers be provide to list CFM of all the air hander units?

A: Mechanical Drawings and Air Handler CFM attached SAM.GOV.

1. Can dimensions of the coils on all the Air handler Units be provided?

A: Mechanical Drawings attached within SAM.GOV.

** ADDITIONAL QUESTIONS MAY BE SUBMITTED VIA EMAIL AS AN RFI. ANSWERS WILL BE PROVIDED AS QUICKLY AS POSSIBLE. **