JBA_ANG113_QuestionsAnswers_19 August 2025.docx
DOCX document 23 KB Posted
- Attached to
- 113 Wing Fire Sprinkler and Fire Alarm
- Solicitation number
- W50S6W25Q0010
- Issued by
-
Department of the Army National Guard
About this file
This document is a Questions and Answers (Q&A) file for Solicitation W50S6W25Q0010, a fire sprinkler and fire alarm system project at Joint Base Andrews. The Q&A addresses seven specific technical inquiries from potential contractors regarding the site visit and Statement of Work (SOW), covering details about horn/strobe installations, smoke detector requirements in an IT server room, sprinkler head modifications, dielectric breaks, and documentation needs. Key clarifications include: a smoke detector is required for the MACIII-designated IT server room, existing conduit/boxes may be used with contractor responsibility for unsuitable installations, the sprinkler scope remains two adds/one delete/one relocate, dielectric isolation is contractor-responsible in the SCIF area, and no PE stamps or hydrostatic testing will be required for the work.
The associated federal contract opportunity is for the Department of the Army National Guard, seeking a contractor to design, fabricate, and install a fire sprinkler and alarm system in Building 1217's Operations Support Squadron area, with an optional line item to upgrade the fire alarm system in Building 2493. The solicitation is for commercial items, with the quote due date extended to August 21, 2025. The project involves providing all necessary materials, equipment, personnel, and management to complete the fire protection system installations at Joint Base Andrews, Maryland.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation # W50S6W25Q0010
JBA 113 ANG Site Visit - 08 April 2024
QUESTIONS
| # |
| Reference: |
| Question: |
| Site Visit & SOW 1.2.2 a |
| The SOW calls for a horn/strobe in room 117. During the site visit, we noticed there was a box in the wall about the location fo where a wall horn strobe would go with tape over it - could you please clarify if that is a box designated for the horn/strobe, or if that's there |
for different use.
ANSWER: Existing conduit/boxes may be used, however, if it is later determined that the existing location (box, conduit, wire, etc) is unsuitable, contractor is responsible for installation of new.
Site Visit & SOW 1.2.2 During the site visit we learned of an IT server room in B1217 that does not mention a need for a smoke detector per the SOW. Could you please clarify if you plan to add a smoke detector to the SOW, as it will require a separate initiate circuit to be added into the area.
Since we do not know the mission-critical level of equipment, we cannot point to the specific guidance for the requirement - however recommend referencing "TSFPEWG G 3-600-01.01-18" (per UFC 3-600-01 para 4-15.1.2) and modifying the Statement of Work accordingly based on the referenced code requirements.
ANSWER: Smoke detector is required. This room is designated as a MACIII. SOW will be updated.
Site Visit & SOW 1.2.1.
a.b.c.
The SOW calls for (2) Add sprinkler heads (1) Delete sprinkler head and (1) relocate sprinkler head. During the site visit, we noticed there was (18) sprinkler head needed to relocate to comply with NFPA 13 and new build-out. Please advice or update SOW.
ANSWER: Ceiling height did not change during the renovation. The Scope will remain the same (2 adds, 1 delete, 1 relocate)
| 4 |
| Site Visit & |
SOW 1.2.1. d.
During the site visit, we noticed there was (5) dielectic breaks serving the new SCIF area. Please advice or update SOW.
ANSWER: The contractor will be responsible for dielectric isolation anywhere the sprinkler system enters or exits the SCIF area.
| 5 |
| Site Visit & |
SOW 1.2.1. e.
Please confirm we do not need PE stamp on sprinkler shop drawings.
ANSWER: PE stamps are not required for shop drawings. This is not a major project as defined by UFC and as such does not require a QFPE.
| 6 |
| Site Visit & SOW 1.2.1. e. |
Please confirm we do not need to provide calculations for the new sprinkler work.
ANSWER: Calculations are not required unless the hazard classification is changed or the pipe schedule established by the previous calculations is changed.
| 7 |
| Site Visit & |
SOW 1.2.10.
Please confrim we do not need a hydrostatic test for the new sprinkler work after install.
ANSWER: Hydrostatic testing will not be required.