This document is a Questions & Answers file for the 140th COMM UPS Replacement federal contract opportunity (Solicitation Number W50S6V25Q0012). The Q&A provides detailed technical specifications and site-specific requirements for a Uninterruptible Power Supply (UPS) installation at the Colorado Air National Guard facility. Key details include a 30KVA UPS to be installed in an interior, non-environmentally controlled room, with specific spatial constraints: a 20x35 foot room area, with a UPS footprint of 4x7 feet and 8 feet high, and 10-foot ceilings. The UPS will support network equipment and data center infrastructure, connected to a 60 kilowatt diesel generator with a 5-10 second transfer time.

Notable technical requirements include SNMP network protocol for remote monitoring, no requirement for load bank testing, and the need for a drip pan under the AC unit to protect the new UPS. The contractor will be responsible for wiring the bypass and potentially relocating the existing Wall Mounted Split Unit. The contract is for a one-time supply and installation, not a multi-year maintenance agreement. A site visit was scheduled for 24 July 2025, with base access forms required by 18 July 2025 at 1200 MDT. The procurement is being conducted by the Department of the Army Colorado Army National Guard.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140th COMM UPS Replacement

Questions & Answers

W50S6V25Q0012

1. Are there any other documents with specifications and Wage Determinations available?

At this moment we are considering this as a commodity purchase with a service incidental, and we did not include a wage determination.

2. What is the existing wattage draw of the equipment the UPS will support?

See load test under attachment 3 of solicitation documents.

3. Are there any future growth plans that will increase the load draw?

Yes- it’s always a possibility. Nothing major planned.

4. What type of equipment will the UPS support (i.e. datacenter/network equipment, building environment/climate control, lighting, etc.)?

Network equipment, data center

5. Dimensions of area where UPS will be installed 20 feet x 35 feet

6. Dimensions of footprint allowed for UPS 4 feet x 7 feet x 8 feet high

7. Height limitations where UPS will be installed 10’ ceilings . There is an ECU located ~70” up the wall where the UPS will be installed. See Room Layout 1.jpg under attachment 2 of solicitation documents.

8. Preference for a top or rear UPS exhaust No.

9. What type of generator is in use and what is its capacity?

60 kilowatt (kW) diesel generator

10. What is the generator transfer time during a utility outage?

~5-10 sec

11. Does the UPS need a single output connection that will lead to an existing distribution panel or will we need include a distribution cabinet?

No, there is an existing distribution panel.

12. If a distribution cabinet is required, what types/sizes of breakers and quantity of each are required?

N/A

13. What type of network protocols (i.e. SNMP, SMTP, MODBUS) are preferred/required for remote monitoring/management of the UPS?

SNMP

14. Could you please provide a picture or the model number of the breaker currently installed at the site?

I cannot. It’s located in a secure area. Photography forbidden.

15. One the units we’re considering is 78” tall and the lithium battery cabinet is 87" tall.

Can the AC unit be moved high enough to support these cabinets?

Yes, we would need advanced notice.

16. We also suggest placing a drip pan under the AC unit to protect the new UPS from potential water damage. Can this be added by the base or should it be added to job

SOW?

Yes, a drip pan is necessary. Added to Statement of need

17. For the maintenance portion, is it just a one year contract with an annual PM or is the contract for multiple years?

This is not a contract that is to span multiple years, this is for the supply of the item and installation.

18. It was noted during the site visit that the existing UPS was bypassed to allow power to the panel downstream. Will the Government with their own resources put the wiring for the new UPS back to normal connection?

No the government will not do the work. The contract plan is to wire the bypass.

19. The new UPS may be taller than the current space allows. Will the Government relocate the existing Wall Mounted Split Unit or will the contractor need to account for relocating it?

Yes.

20. Please confirm if a drip pan for Split Unit on wall will be required if still located above the UPS?

Yes, the unit

21. Statement of Need - 2.4. Will load bank testing of the UPS be required?

No

22. Please provide a One-Line Diagram of the electrical connection specifically to and from the scope UPS.

We are unfortunately unable to provide this.

23. What is the Period of Performance for this project?

Please review the combo document attachment in solicitation for this answer. Located under requirement information section, under description.